Gerdau Monroe steel plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Gerdau Monroe steel plant is a steel plant in Monroe, Michigan, United States that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Monroe, Michigan, United States:
- Location: 3000 E Front St, Monroe, MI 48161, United States
- Coordinates (WGS 84): 41.894229, -83.358697 (exact)
Background
The Gerdau Monroe steel plant began operating in 1980. In 2015, Gerdau invested $155.6 million into upgrading the facility.
In 2016, the plant was cited by the Department of Environmental Quality as having violated several emissions limits.[1]
In 2018, Gerdau announced an additional $70.3 million investment to add transformer, controls and mechanical upgrades to the EAF, among other things.[2] The project was meant to be completed by 2020, but carried on into 2021.[3]
In 2020, the plant was idled due to complications arising from the covid-19 pandemic. It was restarted shortly after.[4]
Plant Details
Table 1: General Plant Details
Start date | Workforce size |
---|---|
1980[5] | 740[6][7][8] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Gerdau SA | 5000004542 | E100001010270 | Gerdau Ameristeel Corp[7] | 4295861819 | E100001010298 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | Main production equipment |
---|---|---|---|
semi-finished, finished rolled[9] | billet, beam, bar[9][10] | building and infrastructure, steel packaging, transport[9] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 730[11] | 730[11] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
2023 | unknown | – |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|---|
unknown EAF (1) | operating[12] | 1980[13] | Whiting, Rev. Primetals Technologies[13] | 730[11] | 113.0[13] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | yes[14] | 100.00[13] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Violation Notice" (PDF). Department of Environmental Quality. 2016-06-15. Retrieved 2022-01-14.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Gerdau investing in Monroe, Michigan steel mill". Steel Times International. Retrieved 2022-01-14.
- ↑ England, Robert (2021-01-21). "Gerdau nears completion on Monroe SBQ mill". Fastmarkets. Retrieved 2022-01-14.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Gerdau to restart Michigan SBQ mills | Argus Media". www.argusmedia.com. 2020-04-16. Retrieved 2022-01-14.
- ↑ AIST_EAF_2023
- ↑ https://indicatorshandbook.gerdau.digital/human-capital.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 "Gerdau S.A. Form 20-F for the Fiscal Year Ended December 31, 2023". US Securities & Exchange Commission. 2024-03-28. Archived from the original on 2024-06-03. Retrieved 2024-05-31.
- ↑ https://web.archive.org/web/20220120013018/https://www2.gerdau.com/gerdau-locations. Archived from the original on 2022-01-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 https://web.archive.org/web/20240125061725/https://www2.gerdau.com/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119055017/https://www.newequipment.com/metal-forming/article/21923231/gerdau-revamps-caster-for-larger-billets-cleaner-steel. Archived from the original on 2024-01-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 https://web.archive.org/web/20221202152423/https://www.hellenicshippingnews.com/new-capacity-roundup-november-2022/. Archived from the original on 2022-12-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240906181654/https://more-oxy.com/motank-in-operation-at-gerdau-monroe-u-s-a/. Archived from the original on 2024-09-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 https://drive.google.com/file/d/17Vtt35CBVFAJFBDgan2a9_CW56EKOw6D/view?usp=drive_link.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.sec.gov/Archives/edgar/data/1073404/000110465908023988/a08-10051_220f.htm.
{{cite web}}
: Missing or empty|title=
(help)