Gerdau Monroe steel plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Gerdau Monroe steel plant is an electric arc furnace (EAF) steel plant operating in Monroe, Michigan, United States.

Location

The map below shows the exact location of the plant in Monroe, Michigan, United States:

Loading map...
  • Location: 3000 E Front St, Monroe, MI 48161, United States
  • Coordinates (WGS 84): 41.894229, -83.358697 (exact)

Background

The Gerdau Monroe steel plant began operating in 1980. In 2015, Gerdau invested $155.6 million into upgrading the facility.

In 2016, the plant was cited by the Department of Environmental Quality as having violated several emissions limits.[1]

In 2018, Gerdau announced an additional $70.3 million investment to add transformer, controls and mechanical upgrades to the EAF, among other things.[2] The project was meant to be completed by 2020, but carried on into 2021.[3]

In 2020, the plant was idled due to complications arising from the covid-19 pandemic. It was restarted shortly after.[4]

Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size
Operating[5] 1980[6] 488[7][8]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Gerdau SA [77.4%] 5000004542 [77.4%] E100001010271 [25.9%] Gerdau Steel North America Inc[5] 5035931883 E100000130976

Table 3: Process and Products

Steel product category Steel products Steel sector end users Main production equipment Detailed production equipment
semi-finished; finished rolled[5] billets; bar; beam[9][5] building and infrastructure; steel packaging; transport[5] EAF[10] 1 EAF (113-tonne; began in 1980)[6]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 771 TTPA[11] 771 TTPA[11]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "Violation Notice" (PDF). Department of Environmental Quality. 2016-06-15. Retrieved 2022-01-14.{{cite web}}: CS1 maint: url-status (link)
  2. "Gerdau investing in Monroe, Michigan steel mill". Steel Times International. Retrieved 2022-01-14.
  3. England, Robert (2021-01-21). "Gerdau nears completion on Monroe SBQ mill". Fastmarkets. Retrieved 2022-01-14.{{cite web}}: CS1 maint: url-status (link)
  4. "Gerdau to restart Michigan SBQ mills | Argus Media". www.argusmedia.com. 2020-04-16. Retrieved 2022-01-14.
  5. 5.0 5.1 5.2 5.3 5.4 https://web.archive.org/web/20240125061725/https://www2.gerdau.com/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 "2023 AIST Electric Arc Furnace Roundup". Association for Iron & Steel Technology. January 2023. {{cite magazine}}: Cite magazine requires |magazine= (help)
  7. https://indicatorshandbook.gerdau.digital/human-capital.html. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20220120013018/https://www2.gerdau.com/gerdau-locations. Archived from the original on 20 January 2022. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20240119055017/https://www.newequipment.com/metal-forming/article/21923231/gerdau-revamps-caster-for-larger-billets-cleaner-steel. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20220704220522/https://www2.gerdau.com/products/clean-steels. Archived from the original on 04 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20221202152423/https://www.hellenicshippingnews.com/new-capacity-roundup-november-2022/. Archived from the original on 02 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Resources