Gerdau Monroe steel plant is a steel plant in Monroe, Michigan, United States that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Monroe, Michigan, United States:

Loading map...
  • Location: 3000 E Front St, Monroe, MI 48161, United States
  • Coordinates (WGS 84): 41.894229, -83.358697 (exact)

Background

The Gerdau Monroe steel plant began operating in 1980. In 2015, Gerdau invested $155.6 million into upgrading the facility.

In 2016, the plant was cited by the Department of Environmental Quality as having violated several emissions limits.[1]

In 2018, Gerdau announced an additional $70.3 million investment to add transformer, controls and mechanical upgrades to the EAF, among other things.[2] The project was meant to be completed by 2020, but carried on into 2021.[3]

In 2020, the plant was idled due to complications arising from the covid-19 pandemic. It was restarted shortly after.[4]

Plant Details

Table 1: General Plant Details

Start date Workforce size
1980[5] 740[6][7][8]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Gerdau SA 5000004542 E100001010270 Gerdau Ameristeel Corp[7] 4295861819 E100001010298

Table 3: Process and Products

Steel product category Steel products Steel sector end users Main production equipment
semi-finished, finished rolled[9] billet, beam, bar[9][10] building and infrastructure, steel packaging, transport[9] EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 730[11] 730[11]

Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown

Unit Details

Table 6: Electric Arc Furnace Details

Unit name Status Start date Furnace manufacturer and model Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[12] 1980[13] Whiting, Rev. Primetals Technologies[13] 730[11] 113.0[13]

Table 7: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap
unknown EAF (1) yes[14] 100.00[13]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Violation Notice" (PDF). Department of Environmental Quality. 2016-06-15. Retrieved 2022-01-14.{{cite web}}: CS1 maint: url-status (link)
  2. "Gerdau investing in Monroe, Michigan steel mill". Steel Times International. Retrieved 2022-01-14.
  3. England, Robert (2021-01-21). "Gerdau nears completion on Monroe SBQ mill". Fastmarkets. Retrieved 2022-01-14.{{cite web}}: CS1 maint: url-status (link)
  4. "Gerdau to restart Michigan SBQ mills | Argus Media". www.argusmedia.com. 2020-04-16. Retrieved 2022-01-14.
  5. AIST_EAF_2023
  6. https://indicatorshandbook.gerdau.digital/human-capital.html. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 "Gerdau S.A. Form 20-F for the Fiscal Year Ended December 31, 2023". US Securities & Exchange Commission. 2024-03-28. Archived from the original on 2024-06-03. Retrieved 2024-05-31.
  8. https://web.archive.org/web/20220120013018/https://www2.gerdau.com/gerdau-locations. Archived from the original on 2022-01-20. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 https://web.archive.org/web/20240125061725/https://www2.gerdau.com/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20240119055017/https://www.newequipment.com/metal-forming/article/21923231/gerdau-revamps-caster-for-larger-billets-cleaner-steel. Archived from the original on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 https://web.archive.org/web/20221202152423/https://www.hellenicshippingnews.com/new-capacity-roundup-november-2022/. Archived from the original on 2022-12-02. {{cite web}}: Missing or empty |title= (help)
  12. https://web.archive.org/web/20240906181654/https://more-oxy.com/motank-in-operation-at-gerdau-monroe-u-s-a/. Archived from the original on 2024-09-06. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 https://drive.google.com/file/d/17Vtt35CBVFAJFBDgan2a9_CW56EKOw6D/view?usp=drive_link. {{cite web}}: Missing or empty |title= (help)
  14. https://www.sec.gov/Archives/edgar/data/1073404/000110465908023988/a08-10051_220f.htm. {{cite web}}: Missing or empty |title= (help)

Resources