Gerdau São Paulo Araçariguama steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Gerdau São Paulo Araçariguama steel plant (Usina siderúrgica Gerdau São Paulo Araçariguama), also known as Gerdau São Paulo, Gerdau Araçariguama, is a steel plant in Araçariguama, São Paulo, Brazil that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Araçariguama, São Paulo, Brazil:

Loading map...
  • Location: Rodovia Presidente Castelo Branco – Km 52, s/nº - Ronda - 18147-000 – Araçariguama – SP, Brazil
  • Coordinates (WGS 84): -23.43864, -47.08825 (exact)

Background

Located on the western outskirts of São Paulo, the Araçariguama steel plant is among the largest and newest of Gerdau's 13 crude steel-producing facilities in Brazil.[1] The melt shop, equipped with a state-of-the-art electric arc furnace (EAF), began operating in 2006, with an initial crude steel capacity of 900 ttpa (thousand tonnes per annum).[2][3] The adjacent rolling mill, with an annual capacity of 600 ttpa[1], specializes in rebar for the construction and infrastructure sectors in São Paulo state, Brazil's largest steel market.[3]

Plant Details

Table 1: General Plant Details

Start date Workforce size
2006[4][5][6] 370[7][8]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Gerdau SA [100.0%] 5000004542 [100.0%] E100001010270 [100.0%] Gerdau Acos Longos SA [100%][9][10] 4297571558 E100001010277 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
semi-finished, finished rolled[11] billet, rebar[11] building and infrastructure[11] 2022-09-12[12] unknown[13] unknown[14] EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 950[15] 950[15]

Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Total (all routes)
2019 697[9][11] 697[9][11]
2020 688[9][11] 688[9][11]
2021 728[16][17] 728[16][17]
2022 678[18][19] 678[18][19]
2023 673[15][20] 673[15][20]

Unit Details

Table 6: Electric Arc Furnace Details

Unit name Status Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[15] 950[15] 108.0[21]

Table 7: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % pig iron (unknown if basic/merchant or granulated % other iron
unknown EAF (1) yes[22][23] 78.90[23] >0[23] 21.10[23]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "Form 20-F". US Securities & Exchange Commission. December 31, 2020.{{cite web}}: CS1 maint: url-status (link)
  2. "Gerdau compra empresa nos EUA e inaugura usina em SP". CNM-CUT. March 20, 2006.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 "Usinas da Gerdau no PR perdem mercado para irmã paulista". Gazeta do Povo. March 10, 2006.{{cite web}}: CS1 maint: url-status (link)
  4. https://web.archive.org/web/20220318122913/https://www.yumpu.com/es/document/read/45106946/acero-para-transformar-el-mundo-gerdau. Archived from the original on 2022-03-18. {{cite web}}: Missing or empty |title= (help)
  5. https://www.manutencaoesuprimentos.com.br/usina-do-grupo-gerdau-em-sao-paulo-comeca-a-operar-em-2005/. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20210127175921/https://www.gazetadopovo.com.br/economia/usinas-da-gerdau-no-pr-perdem-mercado-para-irma-paulista-9xfiocafz66i72jyz3l4qp8we/. Archived from the original on 2021-01-27. {{cite web}}: Missing or empty |title= (help)
  7. https://cnmcut.org.br/noticias/aracariguama-trabalhadores-da-gerdau-aprovam-proposta-para-o-ppr-2020-11ff. {{cite web}}: Missing or empty |title= (help)
  8. "Terceirizados da Gerdau em Araçariguama reclamam das condições de trabalho". SMetal. 2014-07-25. Archived from the original on 2024-01-19.
  9. 9.0 9.1 9.2 9.3 9.4 "Pocket Yearbook - A Siderurgia em Números 2021" (PDF). Instituto Aço Brasil. 2021-06-30. Archived from the original (PDF) on 2022-01-20.
  10. "Aço & Sustentabilidade 2020" (PDF). Instituto Aço Brasil. 2020-08-31. Archived from the original (PDF) on 2022-06-20.
  11. 11.0 11.1 11.2 11.3 11.4 11.5 11.6 https://www.sec.gov/Archives/edgar/data/1073404/000110465921053189/tm212083d1_20f.htm. {{cite web}}: Missing or empty |title= (help)
  12. (PDF) https://www2.gerdau.com.br/wp-content/uploads/2023/07/38.008_10-Certificado-ISO-14.001-Val.-01_01_2025.pdf. {{cite web}}: Missing or empty |title= (help)
  13. "Documentos Oficiais e Certificados de Qualidade". Gerdau. Archived from the original on 2022-08-14.
  14. https://www.responsiblesteel.org/issued-certificates-and-ongoing-audits. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 15.4 15.5 "Gerdau S.A. Form 20-F for the Fiscal Year Ended December 31, 2023". US Securities & Exchange Commission. 2024-03-28. Archived from the original on 2024-06-03. Retrieved 2024-05-31.
  16. 16.0 16.1 "Pocket Yearbook - A Siderurgia em Números 2022" (PDF). Instituto Aço Brasil. 2022-06-30. Archived from the original (PDF) on 2022-06-25.
  17. 17.0 17.1 "Gerdau S.A. Form 20-F for the Fiscal Year Ended December 31, 2021". US Securities & Exchange Commission. 2022-03-31. Archived from the original on 2022-10-04.
  18. 18.0 18.1 "Pocket Yearbook - Indústria do Aço em Números 2023" (PDF). Instituto Aço Brasil. 2023-06-30. Archived from the original (PDF) on 2024-01-19.
  19. 19.0 19.1 "Gerdau S.A. Form 20-F for the Fiscal Year Ended December 31, 2022". US Securities & Exchange Commission. 2024-03-31. Archived from the original on 2024-09-12.
  20. 20.0 20.1 (PDF) https://www.acobrasil.org.br/site/wp-content/uploads/2024/06/Mini_anuario_2024_AcoBrasil.pdf. {{cite web}}: Missing or empty |title= (help)
  21. "Reciclagem de Borracha de Pneu em Forno Elétrico a Arco" (PDF). Associação Brasileira de Metalurgia, Materiais e Mineração. 2019-09-30. Archived from the original (PDF) on 2022-03-18.
  22. "Environmental Product Declaration: GSP (Araçariguama)". Gerdau. 2023-05-29. Archived from the original on 2024-06-01.
  23. 23.0 23.1 23.2 23.3 "Declaração Ambiental do Produto - Environmental Product Declaration" (PDF). Gerdau. 2019-06-30. Archived from the original (PDF) on 2024-09-05.

Resources