Gerdau São Paulo Araçariguama steel plant (Usina siderúrgica Gerdau São Paulo Araçariguama (Portuguese)), also known as Gerdau São Paulo, Gerdau Araçariguama, is an electric arc furnace (EAF) steel plant operating in Araçariguama, São Paulo, Brazil.

Location

The map below shows the exact location of the plant in Araçariguama, São Paulo, Brazil:

Loading map...
  • Location: Rodovia Presidente Castelo Branco – Km 52, s/nº - Ronda - 18147-000 – Araçariguama – SP, Brazil
  • Coordinates (WGS 84): -23.438640, -47.088250 (exact)

Background

Located on the western outskirts of São Paulo, the Araçariguama steel plant is among the largest and newest of Gerdau's 13 crude steel-producing facilities in Brazil.[1] The melt shop, equipped with a state-of-the-art electric arc furnace (EAF), began operating in 2006, with an initial crude steel capacity of 900 ttpa (thousand tonnes per annum).[2][3] The adjacent rolling mill, with an annual capacity of 600 ttpa[1], specializes in rebar for the construction and infrastructure sectors in São Paulo state, Brazil's largest steel market.[3]

Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size
Operating[4] 2006[5][6][7] 400[8]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Gerdau SA [100.0%] 5000004542 [100%] E100001010271 [33.5%] Gerdau Acos Longos Sa[9][10] 4297571558 E100001010277

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 Main production equipment Detailed production equipment
semi-finished; finished rolled[4] billets, rebar, coil rebar[4] building and infrastructure[4] 2022[11] EAF[12] 1 EAF (108-tonne, 2006)[13][4][14]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 950 TTPA[14][15] 950 TTPA[14][15]

Table 5: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year EAF Production Total (all routes)
2020 688 TTPA[9][4] 688 TTPA[9][4]
2021 728 TTPA[16][17] 728 TTPA[16][17]
2022 678 TTPA[18][15] 678 TTPA

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "Form 20-F". US Securities & Exchange Commission. December 31, 2020.{{cite web}}: CS1 maint: url-status (link)
  2. "Gerdau compra empresa nos EUA e inaugura usina em SP". CNM-CUT. March 20, 2006.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 "Usinas da Gerdau no PR perdem mercado para irmã paulista". Gazeta do Povo. March 10, 2006.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 https://web.archive.org/web/20220318142005/https://sec.report/Document/0001104659-21-053189/. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20210127175921/https://www.gazetadopovo.com.br/economia/usinas-da-gerdau-no-pr-perdem-mercado-para-irma-paulista-9xfiocafz66i72jyz3l4qp8we/. Archived from the original on 27 January 2021. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20220318122913/https://www.yumpu.com/es/document/read/45106946/acero-para-transformar-el-mundo-gerdau. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  7. https://www.manutencaoesuprimentos.com.br/usina-do-grupo-gerdau-em-sao-paulo-comeca-a-operar-em-2005/#gsc.tab=0. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20240119071743/https://smetal.org.br/imprensa/terceirizados-da-gerdau-em-aracariguama-reclamam-das-condicoes-de-trabalho/. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 (PDF) https://web.archive.org/web/20220120225956/https://acobrasil.org.br/site/wp-content/uploads/2021/06/Mini_anuario_2021_AcoBrasil-1.pdf. Archived from the original (PDF) on 20 January 2022. {{cite web}}: Missing or empty |title= (help)
  10. (PDF) https://web.archive.org/web/20220620213407/https://acobrasil.org.br/relatoriodesustentabilidade/assets/pdf/PDF-2020-Relatorio-Aco-Brasil-Dados.pdf. Archived from the original (PDF) on 20 June 2022. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20220814215641/https://www2.gerdau.com.br/certificados-de-qualidade-e-documentos/. Archived from the original on 14 August 2022. {{cite web}}: Missing or empty |title= (help)
  12. https://web.archive.org/web/20221004091434/https://api.mziq.com/mzfilemanager/v2/d/21e1d193-5cab-456d-8bb8-f00a49a43c1c/aca1c305-60bb-ca67-b139-bdb03390c586?origin=1. Archived from the original on 04 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  13. https://www.sec.gov/Archives/edgar/data/1073404/000110465906073919/a06-23837_1ex99d3.htm. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 (PDF) https://web.archive.org/web/20220318133513/https://www.tecnologiammm.com.br/article/10.4322/2176-1523.20191858/pdf/tmm-16-3-397.pdf. Archived from the original (PDF) on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 https://api.mziq.com/mzfilemanager/v2/d/21e1d193-5cab-456d-8bb8-f00a49a43c1c/99af196c-52a5-c661-0f88-637092f35821?origin=2. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 (PDF) https://web.archive.org/web/20220625100836/https://acobrasil.org.br/site/wp-content/uploads/2022/05/AcoBrasil_Mini_anuario_2022.pdf. Archived from the original (PDF) on 25 June 2022. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 https://sec.report/Document/0001104659-22-041058/. {{cite web}}: Missing or empty |title= (help)
  18. (PDF) https://web.archive.org/web/20240119051040/https://acobrasil.org.br/site/wp-content/uploads/2023/06/AcoBrasil_Minianuario_2023.pdf. Archived from the original (PDF) on 19 January 2024. {{cite web}}: Missing or empty |title= (help)

Resources