Gerdau Siderperu Chimbote steel plant (Planta siderúrgica Gerdau Siderperu Chimbote (Spanish)) is a blast furnace (BF), direct reduced iron (DRI) and electric arc furnace (EAF) steel plant operating in Chimbote, Ancash, Peru.
Location
The map below shows the exact location of the plant in Chimbote, Ancash, Peru:
- Location: Av. Santiago Antúnez de Mayolo s/n, Chimbote - Santa - Ancash, Peru
- Coordinates (WGS 84): -9.059693, -78.601178 (exact)
Background
The Chimbote steel mill began operating under state ownership in April 1958, when Peru's president inaugurated the plant's DRI (iron reduction), steel-making and laminating facilities.[1] The company was privatized in 1996 and passed into the hands of its current majority owner, the Brazilian steelmaker Gerdau, in 2006.[2][3]
In 2008, Gerdau announced plans to increase steel production at the plant from 450,000 tpa (tonnes per annum) to 3 million tpa by 2013.[4] However, as of early 2021, the plant's production capacities for crude steel and rolled products were only 750,000 tpa[5] and 573,000 tpa[2], respectively, and the plant's iron-making capacity of 400,000 tpa had been temporarily idled.[2]
Plant Details
Table 1: General Plant Details
Plant status | Start date | Workforce size | Power source |
---|---|---|---|
Operating[6][7] | 1958[8] | 810[9][7] | Enel Perú and SIDERPERU, a Gerdau company, signed a 12-year energy supply contract through which the electricity company will supply energy from its renewable plants to the operation of the steel mill. This alliance, which will last for more than a decade, involves part of the energy that will be produced by Enel's next non-conventional renewable energy plants: Wayra Extension wind power plant and Clemesi solar plant.[10] |
Operating[6][7] | 1958[8] | 810[9][7] | Enel Perú and SIDERPERU, a Gerdau company, signed a 12-year energy supply contract through which the electricity company will supply energy from its renewable plants to the operation of the steel mill. This alliance, which will last for more than a decade, involves part of the energy that will be produced by Enel's next non-conventional renewable energy plants: Wayra Extension wind power plant and Clemesi solar plant.[10] |
Table 2: Ownership and Parent Company Information
Owner | Owner company PermID | Owner company GEM ID |
---|---|---|
Empresa Siderurgica del Peru SAA[6] | 4295886075 | E100000130731 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
finished rolled[11] | rebar, merchant bars, steel tubes, steel mesh[12][13] | building and infrastructure; energy; tools and machinery; transport[13] | 2021[14] | BF, DRI, EAF[15][16][17] | 1 Tenova EAF (2010); 3 DRI modules (SL/RN rotary kiln, 1980)[6][18] |
finished rolled[11] | rebar, merchant bars, steel tubes, steel mesh[12][13] | building and infrastructure; energy; tools and machinery; transport[13] | 2021[14] | BF, DRI, EAF[15][16][17] | 1 Tenova EAF (2010); 3 DRI modules (SL/RN rotary kiln, 1980)[6][18] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 750 TTPA[15][19] | 750 TTPA[15][19] |
mothballed | –[15][19] | –[15][19] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
operating | –[16] | –[17] | –[16][17] |
mothballed | 400 TTPA[16] | 100 TTPA[17] | 500 TTPA[16][17] |
Table 6: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF Production | Total (all routes) |
---|---|---|
2020 | 343 TTPA[6] | 343 TTPA[20][6] |
2021 | 309 TTPA[21] | 309 TTPA[21] |
2022 | >0 TTPA | >0 TTPA |
Table 7: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | DRI Production | Total (all routes) |
---|---|---|---|
2020 | 0 TTPA[20][12] | 0 TTPA[20][12] | 0 TTPA[20][12] |
2021 | 0 TTPA[22][23] | 0 TTPA[22][24][23] | 0 TTPA[22][23] |
2022 | 0 TTPA[25][16] | – | 0 TTPA |
Blast Furnace Details
Table 8: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|
unknown | mothballed[26][25][27][28] | unknown | unknown | 1967[29][30] | 400[16] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "Perfil SIDERPERU: Inauguración de Siderúrgica de Chimbote marcó histórica fecha para la industria". Gerdau Siderperú. Retrieved 2022-01-28.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 "Form 20-F". US Securities & Exchange Commission. December 31, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Manco Zaconetti, Jorge (2014-03-19). "Siderurgía en Chimbote: una Privatización Fallida" (PDF). UNMSM (Universidad Nacional Mayor de San Marcos).
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Brazil steel company invests $1.4 bn in Peru". The Economic Times. September 1, 2008.
- ↑ "Memoria Anual 2020" (PDF). Gerdau, Siderperú. February 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 (PDF) https://web.archive.org/web/20220318092007/https://www.siderperu.com.pe/sites/pe_gerdau/files/PDF/Memoria%20Anual%20-SIDERPERU%202020.pdf. Archived from the original (PDF) on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 https://api.mziq.com/mzfilemanager/v2/d/21e1d193-5cab-456d-8bb8-f00a49a43c1c/e5e462b3-2b9b-f0d2-649f-19c7047e2e50?origin=1.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20200804114236/https://www.siderperu.com.pe/conocenos/perfil-siderperu. Archived from the original on 04 August 2020.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 9.0 9.1 (PDF) https://web.archive.org/web/20240119075847/https://www.siderperu.com.pe/sites/pe_gerdau/files/2023-04/REPORTE-DE-SOSTENIBILIDAD-2022_0.pdf. Archived from the original (PDF) on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 https://www.bnamericas.com/en/news/enel-peru-and-siderperu-sign-an-alliance-for-the-supply-of-renewable-energy-for-12-years.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://web.archive.org/web/20220318142005/https://sec.report/Document/0001104659-21-053189/. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 https://web.archive.org/web/20220318142005/https://sec.report/Document/0001104659-21-053189/. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 https://web.archive.org/web/20220319100842/https://www.siderperu.com.pe/productos/todos-los-productos. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 (PDF) https://web.archive.org/web/20220318153727/https://www.siderperu.com.pe/sites/pe_gerdau/files/PDF/CERTIFICACION-%20ISO%2014001.PDF. Archived from the original (PDF) on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 15.3 15.4 15.5 (PDF) https://documents.bvl.com.pe/hhii/CM0003/20230227194201/MEMANUALSIDER22.PDF.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 16.4 16.5 16.6 16.7 https://api.mziq.com/mzfilemanager/v2/d/21e1d193-5cab-456d-8bb8-f00a49a43c1c/99af196c-52a5-c661-0f88-637092f35821?origin=2.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 17.4 17.5 (PDF) https://web.archive.org/web/20231103031625/https://www.midrex.com/wp-content/uploads/MidrexSTATSBook2022.pdf. Archived from the original (PDF) on 03 November 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 18.0 18.1 AIST Electric Arc Furnace Roundup https://www.midrex.com/wp-content/uploads/Midrex-STATSbookprint-2020.Final_.pdf2022 AIST Electric Arc Furnace Roundup.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 https://www.studocu.com/pe/document/universidad-tecnologica-del-peru/gestion-de-proyectos/valderrama-ramirez-lincoln-danny/63917736.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 20.3 (PDF) https://web.archive.org/web/20210810153606/https://www.alacero.org/sites/default/files/publicacion/america_latina_en_cifras_2020_es-en_09nov.pdf. Archived from the original (PDF) on 10 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 https://es.readkong.com/page/america-latina-en-cifras-2021-latin-america-in-figures-2206549.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 22.0 22.1 22.2 https://sec.report/Document/0001104659-22-041058/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 23.0 23.1 23.2 (PDF) https://web.archive.org/web/20220117191258/http://www.acero.org.ar/wp-content/uploads/2021/12/america_latina_en_cifras_2021_es-en_capa2_0.pdf. Archived from the original (PDF) on 17 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20221008040524/https://www.midrex.com/wp-content/uploads/MidrexSTATSBook2021.pdf. Archived from the original (PDF) on 08 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 25.0 25.1 (PDF) https://web.archive.org/web/20220302193754/https://economia.unmsm.edu.pe/art/2014/SiderChimbote_19.3.14.pdf. Archived from the original (PDF) on 02 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://www.sec.gov/Archives/edgar/data/1073404/000110465923040166/ggb-20221231x20f.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221203035446/https://agenciaorbita.org/2021/05/29/caso-alto-horno-siderperu-incumple-contrato-pactado-con-el-estado-2/. Archived from the original on 03 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://www.huarazenlinea.com/noticias/opinion/24/03/2021/siderperu-con-el-corazon-paralizado.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20150603082835/http://unac.edu.pe/documentos/organizacion/vri/cdcitra/Informes_Finales_Investigacion/IF_SETIEMBRE_2012/IF_SANCHEZ%20VALVERDE_FIME.pdf. Archived from the original (PDF) on 03 June 2015.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://core.ac.uk/download/pdf/323352206.pdf.
{{cite web}}
: Missing or empty|title=
(help)