Godawari Power and Ispat Siltara steel plant, also known as GPIL; Ispat Godawari (IGL), is a direct reduced iron (DRI) steel plant operating in Raipur, Chhattisgarh, India.

Location

The map below shows the exact location of the plant in Raipur, Chhattisgarh, India:

Loading map...
  • Location: 428/2, Phase-I, Industrial Area, Siltara – 493111, Dist. Raipur, Chhattisgarh, INDIA
  • Coordinates (WGS 84): 21.376214, 81.681888 (exact)

Background

Godawari Power and Ispat Limited was established in 1999. It started operating in 2001 with a DRI capacity of 105 ttpa.[1] In 2023 it expanded its induction furnace based steel capacity from 400 ttpa to 525 ttpa.[2]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Start date Workforce size Power source
Main plant Operating[3] 1999[4][5] 2300[5] 73MW captive power plant[5]
Expansion Operating[5] 2014[6] 2024[7]
Expansion Operating[5] 2014[6] 2024[7]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant Godawari Power and Ispat Ltd [100%] 4295874267 [100%] E100001000665 Godawari Power and Ispat Ltd[8] 4295874267 E100001000665

Table 3: Process and Products

Phase Steel product category Steel products ISO 14001 Main production equipment Detailed production equipment
Main plant crude; semi-finished; finished rolled[9] DRI; billets; blooms; wire[9] yes[9][7] DRI, other[9] DRI plant (1 x 350 TPD kiln; 3 x 500 TPD kilns); IF[9][10]
Expansion crude; semi-finished; finished rolled[9] DRI; billets; blooms; wire[9] DRI, other[9] DRI plant; IF[5][11][12]
Expansion crude; semi-finished; finished rolled[9] DRI; billets; blooms; wire[9] DRI, other[9] DRI plant; IF[5][11][12]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Nominal crude steel capacity (total)
Main plant operating 400 TTPA
Expansion construction 300 TTPA
Expansion operating

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Sponge iron/DRI capacity Nominal iron capacity (total)
Main plant operating 495 TTPA[5][5][5][5] 495 TTPA[5][5][5][5]
Expansion construction [5] [5]
Expansion operating 100 TTPA[5] 100 TTPA[5]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Phase Pellets
Main plant 2100 TTPA[5]
Expansion 300 TTPA[9]
Expansion 300 TTPA[9]

Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year Total (all routes)
2020
2021 327 TTPA[7]
2022 325 TTPA[7]

Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year DRI Production Total (all routes)
2020
2021 495 TTPA[7] 495 TTPA
2022 495 TTPA[7] 495 TTPA

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "Annual Report 2023-24" (PDF). 2024-08-29. Retrieved 2024-10-17.{{cite web}}: CS1 maint: url-status (link)
  2. Thayil, Pratiksha (2023-12-22). "Godawari Power Shares Gain On Consent To Enhance Chhattisgarh Plant Capacity". NDTV Profit. Retrieved 2024-10-17.
  3. https://web.archive.org/web/20220111145213/http://godawaripowerispat.com/about/godawari-power-ispat-limited/. Archived from the original on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20220920202216/http://www.godawaripowerispat.com/about/godawari-power-ispat-limited/. Archived from the original on 20 September 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 (PDF) https://www.godawaripowerispat.com/wp-content/uploads/2022/08/Annual-Report-2021-22.pdf. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 http://environmentclearance.nic.in/auth/ECGeneral_Report.aspx?pid=28489. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 (PDF) https://web.archive.org/web/20240111014457/https://www.godawaripowerispat.com/wp-content/uploads/2023/08/Annual-Report-FY-2022-23.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20240125054933/https://www.godawaripowerispat.com/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  9. 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 9.12 (PDF) https://web.archive.org/web/20220121163429/http://godawaripowerispat.com/wp-content/uploads/2021/07/Annual-Report-FY-2020-21.pdf. Archived from the original (PDF) on 21 January 2022. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20220326060904/http://spongeironindia.com/members.php. Archived from the original on 26 March 2022. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20240111041904/https://www.crisil.com/mnt/winshare/Ratings/RatingList/RatingDocs/GodawariPowerandIspatLimited_September%2020%202023_RR_328167.html. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 (PDF) https://www.reliancesmartmoney.com/docs/default-source/research-reports/metal-mining/godawari-power-ispat---visit-note---110422.pdf. {{cite web}}: Missing or empty |title= (help)

Resources