Godo Steel Himeji Works

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Godo Steel Himeji Works (合同製鐵株式会社姫路製造所) is a steel plant in Himeji, Shikama, Hyogo, Japan that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Himeji, Shikama, Hyogo, Japan:

Loading map...
  • Location: 2946, Nakajima, 672-8655
  • Coordinates (WGS 84): 34.783057, 134.669411 (exact)

Background

The Godo Steel Himeji Works is one of three main plants operated by Godo Steel; the other two are Godo Steel Funabashi Works and Godo Steel Osaka Works. The company began operations at Himeji Works in 1978.[1]

The plant is investing 12.8 billion yen to renovate its rolling mill equipment–the renovation is expected to start in fiscal year 2025, expected to be completed in the second half of fiscal year 2028.[2]

Plant Details

Table 1: General Plant Details

Start date Workforce size
1978[3] 241[4]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Godo Steel Ltd 4295877613 E100000130709 Godo Steel Ltd[4] 4295877613 E100000130709

Table 3: Process and Products

Steel product category Steel products ISO 14001 Main production equipment
semi-finished, finished rolled[5] shapes, wire rod, rail, rebar, bar[5] 2023-04-11[6] EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 500[7] 500[7]

Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Total (all routes)
2019 unknown
2020 446[8] 446[8]
2021 unknown
2022 unknown
2023 unknown

Unit Details

Table 6: Electric Arc Furnace Details

Unit name Status Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[7] 500[7] 70.0[7]

Table 7: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap
unknown EAF (1) yes[5] 100.00[5]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "godo steel,ltd". godo steel,ltd. (in 日本語). Retrieved 2024-02-23.
  2. Corp, Yieh. "Yieh Corp Steel News". www.yieh.com. Retrieved 2024-12-17.
  3. https://web.archive.org/web/20220114112611/https://www.godo-steel.co.jp/en/company/history.html. Archived from the original on 2022-01-14. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240125055025/https://www.godo-steel.co.jp/en/company/index.html. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://web.archive.org/web/20151101133328/http://www.godo-steel.co.jp:80/en/company/process.html. Archived from the original on 2015-11-01. {{cite web}}: Missing or empty |title= (help)
  6. https://www.godo-steel.co.jp/sustainability/himeji/. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 https://web.archive.org/web/20220119163733/https://www.godo-steel.co.jp/company/factory_himeji.html. Archived from the original on 2022-01-19. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 (PDF) https://contents.xj-storage.jp/xcontents/AS01941/66d4df2c/59ee/4bc4/95d9/161fc126b18b/20211115140533695s.pdf. {{cite web}}: Missing or empty |title= (help)

Resources