Godo Steel Osaka Works
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Godo Steel Osaka Works (合同製鐵株式会社大阪製造所) is a steel plant in Nishijima, Nishiyodogawa, Osaka, Japan that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Nishijima, Nishiyodogawa, Osaka, Japan:
- Location: 1-2, Nishijima 1-chome, Nishiyodogawa-ku, Osaka 555-0042, Japan
- Coordinates (WGS 84): 34.693045, 135.428537 (exact)
Background
Osaka Iron & Steel Co.,Ltd. established in 1937. The company merged with Otani Jukogyo Co.,Ltd. in 1977 and changed the company name to Godo Steel, Ltd. The company constructed new 70 ton electric furnace at the Osaka Works. The plant ceased operations of blast furnace in 1994.[1]
Plant Details
Table 1: General Plant Details
Start date | Workforce size |
---|---|
1937[2] | 241[3] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Godo Steel Ltd [100.0%] | 4295877613 [100.0%] | E100000130709 [100.0%] | Godo Steel Ltd [100%][3] | 4295877613 | E100000130709 [100%] |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | Main production equipment |
---|---|---|---|
semi-finished, finished rolled[4] | shapes, wire rod, rail, rebar, bar[4] | 2024-12-12[5][6] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 500[7] | 500[7] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production | Total (all routes) |
---|---|---|---|
2019 | unknown | unknown | – |
2020 | 446[8] | –[8] | 446[8] |
2021 | unknown | unknown | – |
2022 | unknown | unknown | – |
2023 | unknown | unknown | – |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Start date | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|
unknown EAF (1) | operating[9] | 1984[2] | 500[7] | 70.0[9] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | yes[4] | 100.00[4] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "godo steel,ltd". godo steel,ltd. (in 日本語). Retrieved 2024-02-23.
- ↑ 2.0 2.1 https://web.archive.org/web/20220114112611/https://www.godo-steel.co.jp/en/company/history.html. Archived from the original on 2022-01-14.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240125055025/https://www.godo-steel.co.jp/en/company/index.html. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20151101133328/http://www.godo-steel.co.jp:80/en/company/process.html. Archived from the original on 2015-11-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.godo-steel.co.jp/sustainability/osaka/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.iafcertsearch.org/certification/M0O0QhIqhhySSyvaJeoNMGJd.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 (PDF) https://web.archive.org/web/20240126190558/https://www.linde-gas.com/en/images/CoJet_EAF_Customer_List_Jan_2021_R1_tcm17-636945.pdf. Archived from the original (PDF) on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 (PDF) https://contents.xj-storage.jp/xcontents/AS01941/66d4df2c/59ee/4bc4/95d9/161fc126b18b/20211115140533695s.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20210127044027/http://godo-steel.co.jp/company/factory_osaka.html. Archived from the original on 2021-01-27.
{{cite web}}
: Missing or empty|title=
(help)