Guangxi Guigang Iron and Steel Group Co Ltd (广西贵港钢铁集团, 广西贵港钢铁集团有限公司郁江炼钢有限公司, 广西贵港郁江炼钢有限公司, 广西贵县钢铁厂), also known as Guangxi Guigang Yujiang Steelmaking Co., Ltd., Guangxi Guigang Iron and Steel Group Yujiang Steelmaking Co., Ltd., is a steel plant in Guigang, Guangxi, China that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.

Location

The map below shows the exact location of the plant in Guigang, Guangxi, China:

Loading map...
  • Location: Nanping Middle Road, Gangbei District, Guigang City, Guangxi Zhuang Autonomous Region
  • Coordinates (WGS 84): 23.088182, 109.634638 (exact)

Background

According to the announcement of the capacity swap plan in January 2023, the company plans to build a 2050m3 blast furnace and phase out the existing 530m3 and 1080m3 blast furnaces. The project is expected to be put into operation in 2025.[1]

In June 2024, the company adjusted its ironmaking capacity swap plan, opting to construct a 1490m3 blast furnace instead of the originally planned 2050m3 blast furnace.[2]

Plant Details

Table 1: General Plant Details

Start date Workforce size
2003[3] 2770[4][5]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
natural person(s) [44.0%]; Guigang Helong Investment Partnership LP [41.8%]; Guigang Herun Investment Partnership LP [12.5%]; unknown [1.7%] not applicable [44.0%]; unknown [41.8%]; unknown [12.5%]; not applicable [1.7%] E100000123261 [44.0%]; E100000123900 [41.8%]; E100000123901 [12.5%]; E100000132388 [1.7%] Guangxi Guigang Iron and Steel Group Co Ltd [100%][6] unknown E100000123225 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
finished rolled[3] wire rod, round bar, rebar, wire[3] building and infrastructure[3] 2023-10-13[7] unknown[8] unknown BF; BOF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
mothballed 1100[9] 1100[9]
operating 1400[10] 1400[10]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
announced 1323[11] 1323[11]
cancelled 1743[12] 1743[12]
operating pre-retirement 1660[12][13][14] 1660[12][13][14]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Coke Pellets
NF NF NF

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year BOF production Other/unknown steel production Total (all routes)
2019 2067[15] [15] 2067[15]
2020 3355[15] [15] 3355[15]
2021 unknown unknown
2022 unknown unknown
2023 unknown

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production Other/unknown iron production Total (all routes)
2019 1308[15] [15] 1308[15]
2020 1653[15] [15] 1653[15]
2021 unknown unknown
2022 unknown unknown
2023 unknown

Unit Details

Table 9: Blast Furnace Details

Unit name Status Announced date Construction date Start date Retired date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown BF (1) cancelled[12][11] 2023-01[12] 2050.0 m3[12] 1743[12] unknown
unknown BF (2) operating pre-retirement[3] 2025[12] 530.0 m3[16] 546[14][13] unknown 2023-02-12[17]
unknown BF (3) operating pre-retirement[3] 2011[18] 2025[12] 1080.0 m3[16] 1114[12][13] unknown 2023-02-12[17]
unknown BF (4) announced[11] 2024-06[11] 2024-12[11] 2026[11] 1490.0[11] 1323[11]

Table 10: Basic Oxygen Furnace Details

Unit name Status Current capacity (ttpa) Current size
unknown BOF (1) operating[3] 1400[10] 120.0 tonnes[10]
unknown BOF (2) mothballed[10] 550[9] 35.0 tonnes[10]
unknown BOF (3) mothballed[10] 550[9] 35.0 tonnes[10]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "广西贵港钢铁集团有限公司炼铁产能置换方案公告". 2023-01-04.
  2. "广西贵港钢铁集团有限公司炼铁产能置换方案变更公示". 广西壮族自治区工业和信息化厅. 2024-06-04.
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://web.archive.org/web/20220103201147/http://guisteel.com/about.asp. Archived from the original on 2022-01-03. {{cite web}}: Missing or empty |title= (help)
  4. https://www.tianyancha.com/company/737484850. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240119065727/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20220110205119/https://www.qcc.com/firm/29a7f84734045e64b266ef6a862c5261.html. Archived from the original on 10 January 2022. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240906183406/http://cx.cnca.cn/CertECloud/result/skipDetail?rzjgId=CNCA-R-2003-114&certNumber=11420E47246R1M&showtemp=1&etlId=&lot_number=6e120058bf90448987984d8abe3dc1be&pass_token=e45f58a1ab08bc50d4b451c764109662e35aea1be6b2bc15751ef3597d20fec8&gen_time=1696002103&captcha_output=-ztsyUCh5RpsD_D66f6bCoMjPp8L7NAc2ZmTrujFmbKD3FKTCRXEDmZXrGi7uDhDxTfPJbpy80my-DbUSBq47s6kXC-PBVhY-jz9wmDG4W8BbcQtjNugkl4Ibh7N-rrxcbe1mGiavSsNb7gwthKuxmiPzqzQC2TiLMSGe9LrSOFLV3E39tNvM64ZJrV2OEbUFoXPScYKm3hpmSKbfbZyBDZ_GLQNqBUkBYiUUDkYcsyL1Jbc4dlI7YKfr-V30C0z. Archived from the original on 2024-09-06. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20240912180149/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%25E5%25B9%25BF%25E4%25B8%259C%25E5%25B9%25BF%25E9%259D%2592%25E9%2587%2591%25E5%25B1%259E%25E7%25A7%2591%25E6%258A%2580%25E6%259C%2589%25E9%2599%2590%25E5%2585%25AC%25E5%258F%25B8&fromIndex=true. Archived from the original on 2024-09-12. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 "产能核算" (PDF). Archived from the original (PDF) on 2022-02-24.
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 https://www.guisteel.com/gonggao/448.html. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 http://gxt.gxzf.gov.cn/wzsy/tzgg_6719901/tzgg/t18519940.shtml. {{cite web}}: Missing or empty |title= (help)
  12. 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 http://gxt.gxzf.gov.cn/wzsy/tzgg_6719901/tzgg/t15615624.shtml. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 https://web.archive.org/web/20220119221544/http://www.cslpc.org/News/Details/4/9494. Archived from the original on 2022-01-19. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 http://gxt.gxzf.gov.cn/wzsy/tzgg_6719901/tzgg/t14023432.shtml. {{cite web}}: Missing or empty |title= (help)
  15. 15.00 15.01 15.02 15.03 15.04 15.05 15.06 15.07 15.08 15.09 15.10 15.11 https://www.chyxx.com/shuju/202107/960963.html. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 "全国规范钢铁企业拟增至263家(附全名单及其装备)". finance.sina.com.cn. 2020-03-02. Archived from the original on 2022-02-07. Retrieved 2024-11-19.
  17. 17.0 17.1 https://www.guisteel.com/jituan/388.html https://bazhong.cdgtw.net/news/2738152.html, https://www.guisteel.com/jituan/388.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  18. https://web.archive.org/web/20241008162152/https://www.sohu.com/a/619544685_120763115. Archived from the original on 2024-10-08. {{cite web}}: Missing or empty |title= (help)

Resources