Guangxi Guigang Iron and Steel Group Co Ltd
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Guangxi Guigang Iron and Steel Group Co Ltd (广西贵港钢铁集团有限公司), also known as Guangxi Guigang Yujiang Steelmaking Co., Ltd.; Guangxi Guigang Iron and Steel Group Yujiang Steelmaking Co., Ltd., is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Guigang, Guangxi, China.
Location
The map below shows the exact location of the plant in Guigang, Guangxi, China:
- Location: Nanping Middle Road, Gangbei District, Guigang City, Guangxi Zhuang Autonomous Region
- Coordinates (WGS 84): 23.088182, 109.634638 (exact)
Background
According to the announcement of the capacity swap plan in January 2023, the company plans to build a 2050m3 blast furnace and phase out the existing 530m3 and 1080m3 blast furnaces. The project is expected to be put into operation in 2025.[1]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Start date | Pre-retirement announcement date | Retired date | Workforce size |
---|---|---|---|---|---|---|
Main plant | Operating[2] | – | 2003[2] | – | – | 2843[3] |
Expansion | Announced[4] | 2023-01[4] | 2025[4] | – | – | – |
Closure | Operating pre-retirement[2] | – | – | 2022[5] | 2025[5] | – |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | persons [44.0%]; Guigang Helong Investment Partnership LP [41.8%]; Guigang Herun Investment Partnership LP [12.5%]; other [1.7%] | E100000123261 [98.3%]; E100000001753 [1.7%] | Guangxi Guigang Iron and Steel Group Co., Ltd.[6] | E100000123225 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
Main plant | finished rolled[2] | hot-rolled ribbed steel bars, hot-rolled round steel bars, threaded steel wire, wire rods[2] | building and infrastructure[2] | 2017-11-01 00:00:00[7] | BF, BOF[8] | 1 BOF (1x120-tonne)[8][4] |
Expansion | finished rolled[2] | hot-rolled ribbed steel bars, hot-rolled round steel bars, threaded steel wire, wire rods[2] | building and infrastructure | – | BF[9] | –[9] |
Closure | finished rolled[2] | hot-rolled ribbed steel bars, hot-rolled round steel bars, threaded steel wire, wire rods[2] | building and infrastructure[2] | – | BF[8] | –[4] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | 2600 TTPA[10] | 2600 TTPA[10] |
Expansion | announced | – | – |
Closure | operating pre-retirement | – | – |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Expansion | announced | 1743 TTPA[4] | 1743 TTPA[4] |
Closure | operating pre-retirement | 1660 TTPA[11][11] | 1660 TTPA[11][11] |
Table 6: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF Production | Total (all routes) |
---|---|---|
2020 | 3355 TTPA[12] | 3355 TTPA |
2021 | – | – |
2022 | – | – |
Table 7: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | Total (all routes) |
---|---|---|
2020 | 1653 TTPA[12] | 1653 TTPA |
2021 | – | – |
2022 | – | – |
Blast Furnace Details
Table 8: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Retired date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
unknown | announced[4] | 2023-01[4] | unknown | 2025[4] | – | 2050 m³[4] | 1743[4] | unknown | unknown |
unknown | operating pre-retirement[2] | unknown | unknown | unknown | 2025[4] | 530 m³[8] | 546[11] | unknown | 2024-02-17[13] |
unknown | operating pre-retirement[2] | unknown | unknown | 2011-07-01 00:00:00[14] | 2025[4] | 1080 m³[8] | 1113[11] | unknown | 2024-02-17[13] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "广西贵港钢铁集团有限公司炼铁产能置换方案公告". 2023-01-04.
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 https://web.archive.org/web/20220103201147/http://guisteel.com/about.asp. Archived from the original on 03 January 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119065727/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 http://gxt.gxzf.gov.cn/wzsy/tzgg_6719901/tzgg/t15615624.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 http://gxt.gxzf.gov.cn/wzsy/tzgg_6719901/tzgg/t14023432.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220110205119/https://www.qcc.com/firm/29a7f84734045e64b266ef6a862c5261.html. Archived from the original on 10 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://cx.cnca.cn/CertECloud/result/skipDetail?rzjgId=CNCA-R-2003-114&certNumber=11420E47246R1M&showtemp=1&etlId=&lot_number=6e120058bf90448987984d8abe3dc1be&pass_token=e45f58a1ab08bc50d4b451c764109662e35aea1be6b2bc15751ef3597d20fec8&gen_time=1696002103&captcha_output=-ztsyUCh5RpsD_D66f6bCoMjPp8L7NAc2ZmTrujFmbKD3FKTCRXEDmZXrGi7uDhDxTfPJbpy80my-DbUSBq47s6kXC-PBVhY-jz9wmDG4W8BbcQtjNugkl4Ibh7N-rrxcbe1mGiavSsNb7gwthKuxmiPzqzQC2TiLMSGe9LrSOFLV3E39tNvM64ZJrV2OEbUFoXPScYKm3hpmSKbfbZyBDZ_GLQNqBUkBYiUUDkYcsyL1Jbc4dlI7YKfr-V30C0z.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 9.0 9.1 https://info.lgmi.com/html/202112/23/7853.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 http://www.guisteel.com/about.asp;http://www.cslpc.org/News/Details/4/9494.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 https://web.archive.org/web/20220119221544/http://www.cslpc.org/News/Details/4/9494. Archived from the original on 19 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 https://www.chyxx.com/shuju/202107/960963.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 https://xa.zgw.com/gc/1825058.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.sohu.com/a/619544685_120763115.
{{cite web}}
: Missing or empty|title=
(help)