Guangxi Guixin Iron and Steel Group Co Ltd

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Guangxi Guixin Iron and Steel Group Co Ltd (广西桂鑫钢铁集团有限公司, 广西灵山县桂鑫金属制品有限公司), also known as Guangxi Lingshan County Guixin Metal Products Co., Ltd., is a steel plant in Hezhou, Guangxi, China that operates blast furnace (BF), basic oxygen furnace (BOF), and electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Hezhou, Guangxi, China:

Loading map...
  • Location: Xindu Town, Hezhou City, Guangxi Zhuang Autonomous Region
  • Coordinates (WGS 84): 23.978962, 111.735523 (exact)

Background

Guangxi Guixin Iron and Steel Group Co., Ltd. and Qingshan Group will build a new 1.8 million tons of superior steel production line in Qingshan Industrial Park, Indonesia, which is scheduled to be completed and put into operation in August 2025.[1][2]

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source
1993[3] 128[4][5] State Grid[6]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Guangxi Guixin Steel Group Co Ltd [100.0%] unknown [100.0%] E100000127358 [100.0%] Guangxi Guixin Steel Group Co Ltd [100%][3] unknown E100000127358 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
finished rolled[7] coil, bar[7] building and infrastructure, transport[7] 2023-04-05[8][9] 2023-04-05[8][9] unknown BF; BOF; EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 4050[10] 2000[11] 6050[10][11]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
operating 3120[10] 3120[10]

Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown

Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year Other/unknown iron production
2019 unknown
2020 unknown
2021 unknown
2022 unknown
2023 unknown

Unit Details

Table 8: Blast Furnace Details

Unit name Status Current size Current capacity (ttpa)
unknown BF (1) operating[12] 1080.0[12] 1040[10]
unknown BF (2) operating[12] 1080.0[12] 1040[10]
unknown BF (3) operating[12] 1080.0[12] 1040[10]

Table 9: Electric Arc Furnace Details

Unit name Status Start date Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[3] 2014[11] 500[11] 70.0[11]
unknown EAF (2) operating[3] 2014[11] 500[11] 70.0[11]
unknown EAF (3) operating[3] 2018[11] 500[11] 70.0[11]
unknown EAF (4) operating[3] 2018[11] 500[11] 70.0[11]

Table 10: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % HBI % sponge iron (unknown if DRI or HBI) % basic/merchant pig iron % granulated pig iron % pig iron (unknown if basic/merchant or granulated % other iron
unknown EAF (1) yes[13] >0[13] unknown unknown unknown unknown unknown unknown unknown
unknown EAF (2) yes[13] >0[13] unknown unknown unknown unknown unknown unknown unknown
unknown EAF (3) yes[13] >0[13] unknown unknown unknown unknown unknown unknown unknown
unknown EAF (4) yes[13] >0[13] unknown unknown unknown unknown unknown unknown unknown

Table 11: Basic Oxygen Furnace Details

Unit name Status Current capacity (ttpa) Current size
unknown BOF( 1) operating[12][14] 1350[10] 120.0 tonnes[12]
unknown BOF( 2) operating[12][14] 1350[10] 120.0 tonnes[12]
unknown BOF( 3) operating[12][14] 1350[10] 120.0 tonnes[12]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "广西桂鑫钢铁集团和青山集团在印合资建设钢铁项目". 中钢网. 2024-07-31.
  2. "广西桂鑫钢铁印尼青山工业园区新建180万吨优特钢生产线". 2024-09-23.
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20220320174001/https://www.qcc.com/weblogin?back. Archived from the original on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240119090037/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  5. https://www.tianyancha.com/company/310597634. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20231127195645/https://mp.weixin.qq.com/s?__biz=MzA3OTE5NDYwOA==&mid=2649780600&idx=6&sn=0690ed7de894aadabd4b0bdfa6767c43&chksm=87b3e1e7b0c468f15efbacd271c04e9b432af38f57742067af3930622419a147a7fc0c95c716&scene=27. Archived from the original on 2023-11-27. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 (PDF) http://gxhky.org/xxgkml/ztfl/hjjccf/hjyxpj/202002/W020200213587103906690.pdf. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20220320145306/http://www.gxsteel.cn/page146. Archived from the original on 2022-03-20. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20240115064859/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%B9%BF%E8%A5%BF%E6%A1%82%E9%91%AB%E9%92%A2%E9%93%81%E9%9B%86%E5%9B%A2%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 10.9 "产能核算" (PDF). Archived from the original (PDF) on 2022-02-24.
  11. 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 (PDF) http://sthjt.gxzf.gov.cn/zfxxgk/zfxxgkgl/fdzdgknr/hjjccf/hjyxpj/W020200213587103906690.pdf. {{cite web}}: Missing or empty |title= (help)
  12. 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 http://180425.fm086.com/Synopsis. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 https://web.archive.org/web/20231019180612/https://finance.sina.com.cn/money/future/wemedia/2023-07-04/doc-imyzpsif4661641.shtml. Archived from the original on 2023-10-19. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 https://www.gxsteel.cn/page151. {{cite web}}: Missing or empty |title= (help)

Resources