Guitiriz-Lugo-Zamora Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Guitiriz-Lugo-Zamora Gas Pipeline is a proposed natural gas pipeline in Spain.[1]

Location

The pipeline would run between Guitiriz, Lugo and Zamora in northwestern Spain.[1][2]

Loading map...

Pipeline Details

  • Owner: Reganosa[1]
  • Capacity:
  • Length: 318 km / 197.6 miles[1]
  • Diameter: 30 inches[1]
  • Status: Proposed[1][3]
  • Start Year: 2024[1]
  • Cost: $296,310,000[1]

Background

The European Network of Transmission System Operators for Gas (ENTSOG) lists the Guitiriz-Lugo-Zamora Gas Pipeline with the project code "TRA-A-950".[1]

José María Paz, president of project developer Reganosa, indicated in a March 2018 interview that the Guitiriz to Lugo section of the pipeline might be constructed first, pending further developments with the European Commission-sponsored 3rd interconnection PT-ES project, which includes the separate Guitiriz-Zamora-Adradas Gas Pipeline to be developed by Enagás.[4]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 ENTSOG TYNDP 2020 - Annex A - Projects Tables, ENTSOG, accessed January 2020.
  2. European Network of Transmission System Operators for Gas (October 2020). "TYNDP 2020 - MAP – Transmission" (PDF). ENTSOG. Retrieved December 4, 2020.{{cite web}}: CS1 maint: url-status (link)
  3. European Network of Transmission System Operators for Gas (October 2020). "TYNDP 2020 Transmission Ten Year Network Development Plan Transmission Projects" (PDF). Ten-Year Network Development Plan 2020 – Infrastructure Report. Retrieved December 1, 2020.{{cite web}}: CS1 maint: url-status (link)
  4. "«Hace falta el gasoducto para unir Galicia con la Meseta»". La Voz de Galicia. March 18, 2018.{{cite web}}: CS1 maint: url-status (link)