Guizhou Juxin Iron and Steel Group Co Ltd
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Guizhou Juxin Iron and Steel Group Co Ltd (贵州聚鑫钢铁(集团)有限公司) is a steel plant in Xingyi, Guizhou, China that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Xingyi, Guizhou, China:
- Location: Hexin Village, Dingxiao Town, Xingyi City, Guizhou Province
- Coordinates (WGS 84): 25.150857, 105.041722 (exact)
Background
In 2021, the company announced to build a 70-ton electric arc furnace and put it into production in 2025 to replace two 35-ton electric furnaces.[1]
The company's 70-ton alloy steel electric furnace technology upgrade project conducted the second public disclosure of environmental impact assessment information in June 2024.[2]
Plant Details
Table 1: General Plant Details
Start date | Workforce size | Power source |
---|---|---|
1993[3] | 600[4][5] | Guizhou Power Grid Company and Xingyi Local Power Grid[6] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Qianxinan Prefecture Juxin Industry & Trade General Co [100.0%] | unknown [100.0%] | E100000126448 [100.0%] | Qianxinan Prefecture Juxin Industry & Trade General Co [100%][3] | unknown | E100000126448 [100%] |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
---|---|---|---|---|---|---|
semi-finished, finished rolled[7] | billet, rebar[7] | building and infrastructure[7] | 2023-11-15[8] | 2023-08-11[8] | unknown | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
announced | 500[7][9] | 500[7][9] |
operating pre-retirement | 490[7][9] | 490[7][9] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
2023 | – | unknown |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Announced date | Start date | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|---|
unknown EAF (1) | operating pre-retirement[10] | – | – | 245[7][9] | 35.0[10] |
unknown EAF (2) | operating pre-retirement[10] | – | – | 245[7][9] | 35.0[10] |
unknown EAF (3) | announced[10] | 2021-10[10] | 2025[10] | 500[7][9] | 70.0[10] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated | % other iron |
---|---|---|---|---|---|---|---|---|---|
unknown EAF (1) | yes[11] | >0[11] | unknown | unknown | unknown | unknown | unknown | unknown | unknown |
unknown EAF (2) | yes[11] | >0[11] | unknown | unknown | unknown | unknown | unknown | unknown | unknown |
unknown EAF (3) | yes[11] | >0[11] | unknown | unknown | unknown | unknown | unknown | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 贵州聚鑫钢铁(集团)有限公司技术改造升级项目产能置换方案公告,贵州省工业和信息化厅,October 12, 2021
- ↑ "贵州聚鑫钢铁(集团)有限公司 (70吨合金钢电炉)技术升级改造项目 环境影响评价第二次信息公示". 黔西南日报. 2024-06-21.
- ↑ 3.0 3.1 https://web.archive.org/web/20220112155656/https://www.qcc.com/firm/5584e88a2dd6dc370af20dfd4931e860.html. Archived from the original on 12 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://zlzh.zgqxn.com/system/2024/06/28/030255351.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240115061519/http://www.waterhr.com/campus/index.php?m=job&a=company_detail&uid=cm1650879631780. Archived from the original on 2024-01-15.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20231127204403/http://society.sohu.com/a/604127614_121106902. Archived from the original on 2023-11-27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 https://web.archive.org/web/20220119182212/http://www.juxinsteel.com/About.aspx?ClassID. Archived from the original on 2022-01-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20231005174711/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E8%B4%B5%E5%B7%9E%E8%81%9A%E9%91%AB%E9%92%A2%E9%93%81%EF%BC%88%E9%9B%86%E5%9B%A2%EF%BC%89%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 2023-10-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 https://web.archive.org/web/20230823205105/https://www.sohu.com/a/494829790_121123911. Archived from the original on 2023-08-23.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 https://web.archive.org/web/20220126161147/https://m.mysteel.com/21/1012/16/C211326D309C9818_abc.html. Archived from the original on 2022-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 https://web.archive.org/web/20240916170654/https://wappass.baidu.com/static/captcha/tuxing.html?ak=572be823e2f50ea759a616c060d6b9f1&backurl=https%253A%252F%252Fmbd.baidu.com%252Fnewspage%252Fdata%252Flandingsuper%253Fid%253D1750112459772709798%2526wfr%253Dspider%2526for%253Dpc%2526third%253Dbaijiahao%2526baijiahao_id%253D1750112459772709798%2526c_source%253Dkunlun%2526c_score%253D0.999000×tamp=1726506413&signature=98ca3bbd2d5aa6f259f189ee127d2145. Archived from the original on 2024-09-16.
{{cite web}}
: Missing or empty|title=
(help)