Hbis Laoting Steel Co Ltd (河钢乐亭钢铁有限公司(唐钢新区)) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Tangshan, Hebei, China.
Location
The map below shows the exact location of the plant in Tangshan, Hebei, China:
Loading map...
{"type":"HYBRID","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"600px","height":"500px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.257823,"lon":119.033567,"icon":""}]}
- Location: Economic Development Zone, laoting Couty, Tangshan City, Hebei Province
- Coordinates (WGS 84): 39.257823, 119.033567 (exact)
Background
The company's Phase 1 project has been fully put into operation. The existing main production equipment and facilities include one mechanized raw material yard, two 360m² sintering machines, two 760m² belt-type pelletizing roasting machines, four 600t/d lime kilns, three 2922m³ blast furnaces, one 200t dephosphorization furnace, three 100-ton converters, two 200-ton converters, one 2050mm hot rolling production line, two high-speed wire production lines, one high bar production line, one medium bar production line, one structural steel production line, and related supporting facilities.
In December 2021, the company decided to implement the Phase 2 project in two parts. The first part involves the construction of one 3200 cubic meters blast furnace, one 230-ton converter, one 500 square meters belt-type sintering machine, two lime kilns, one dolomite kiln, and one 1580mm hot-rolled strip steel production line. The second part includes the construction of two 120-ton electric furnaces, two ESP hot-rolled production lines, two hot dip galvanizing production lines using thermal basic acid process, and one 1550mm cold-rolled production line.[1]
During the construction of the first part, environmental protection acceptance was conducted in three phases according to the construction progress. The first phase has been completed in April 2024, primarily including the construction of one lime kiln (Kiln No. 8) and its associated pre-kiln storage, the lime processing operations (comprising one desulfurizer production line, two finished product crushing lines, and three hydrated lime production lines), as well as a 1600 mm twin-stream slab caster and its supporting facilities.[2]
Low-emissions/green steelmaking
This steel plant is associated with a green steel project tracked in the Green Steel Tracker. Details about the project are included below.
Table 1: Green Steel Project Details
All references for the above data are available in the Green Steel Tracker.
|
Project 1
|
Company
|
HBIS Group
|
Company has climate goals?
|
Yes
|
Location
|
Xuan Hua, Zhangjiakou, Hebei province, China
|
Project name
|
Paradigm project
|
Project website
|
Site
|
Project scale
|
Full scale
|
Project status
|
Operating
|
Year to be online
|
2021
|
Technology to be used
|
NG-DRI to H-DRI
|
Technology details
|
Gas mixture composed by 30% of coke oven gas from existing integrated plant and 70% of hydrogen from external sources
|
Iron production capacity (million tonnes per year)
|
0
|
Steel production capacity (million tonnes per year)
|
Not stated
|
CO2 capture (million tonnes CO2 per year)
|
Not stated
|
Hydrogen generation capacity(MW)
|
Not applicable
|
Investment size
|
Not stated
|
Actual start year
|
2023
|
Partners
|
Tenova
|
Date of announcement
|
2020-11-23
|
Plant Details
Table 2: General Plant Details
Phase
|
Plant status
|
Announced date
|
Construction date
|
Start date
|
Workforce size
|
Power source
|
Main plant
|
Operating[3]
|
–
|
–
|
2020[4]
|
9755[5]
|
Rooftop Distributed Photovoltaic Power Generation[6]
|
Expansion
|
Construction[7]
|
2021[7]
|
2022[7]
|
–
|
–
|
Rooftop Distributed Photovoltaic Power Generation[6]
|
Expansion
|
Announced[7]
|
2021[7]
|
–
|
–
|
–
|
Rooftop Distributed Photovoltaic Power Generation[6]
|
Table 3: Ownership and Parent Company Information
Phase
|
Parent company
|
Parent company PermID
|
Parent company GEM ID
|
Owner
|
Owner company GEM ID
|
Main plant
|
HBIS Co Ltd [69.1%]; HBIS Group Co Ltd [7.7%]; Hebei Province Jicai Lndustryl Equity Lnvestment Fund Co Ltd [7.0%]; China Everbright Group [6.5%]; Gansu Provincial State-owned Assets Investment Group Co Ltd [3.0%]; Tangshan City Development Group Co Ltd [2.9%]; Gansu Financial Holding Group Co Ltd [2.0%]; other [0.9%]; Gansu Highway Aviation Tourism Investment Group Co Ltd [0.8%]
|
unknown [69.1%]; 5000022648 [7.7%]; unknown [7%]; unknown [6.5%]; unknown [3%]; unknown [2.9%]; unknown [2%]; unknown [0.9%]; unknown [0.8%]
|
E100000123542 [69.1%]; E100000126011 [7.7%]; E100000125782 [7%]; E100000128904 [6.5%]; E100000125508 [3.8%]; E100000125664 [2.9%]; E100000125681 [2%]; E100000001753 [0.9%]
|
Hbis Laoting Steel Co., Ltd.[8]
|
E100000123169
|
Table 4: Process and Products
Table 5: Crude Steel Production Capacities (thousand tonnes per annum)
*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase
|
Capacity operating status*
|
Basic oxygen furnace steelmaking capacity
|
Electric arc furnace steelmaking capacity
|
Nominal crude steel capacity (total)
|
Main plant
|
operating
|
7450 TTPA[12][12][12][12][12]
|
–
|
7450 TTPA[12][12][12][12][12]
|
Expansion
|
construction
|
2250 TTPA[7]
|
–
|
2250 TTPA[7]
|
Expansion
|
announced
|
–
|
1800 TTPA[7][7]
|
1800 TTPA[7][7]
|
Table 6: Crude Iron Production Capacities (thousand tonnes per annum)
Table 7: Upstream Products Production Capacities (thousand tonnes per annum)
Phase
|
Sinter
|
Pellets
|
Main plant
|
5097 TTPA[9]
|
3706 TTPA[9]
|
Expansion
|
4750 TTPA[7]
|
–
|
Expansion
|
–
|
–
|
Blast Furnace Details
Table 8: Blast Furnace Details
Unit name
|
Status
|
Announced date
|
Construction date
|
Start date
|
Current size
|
Current capacity (ttpa)
|
Decarbonization technology
|
Most recent relining
|
1
|
operating[15]
|
unknown
|
unknown
|
2020-09-07 00:00:00[15]
|
2922 m³[10][3]
|
2440[13][14]
|
unknown
|
2022-11-11[16]
|
2
|
operating[17]
|
unknown
|
unknown
|
2020-11-17 00:00:00[17]
|
2922 m³[10][3]
|
2440[13][14]
|
unknown
|
unknown
|
3
|
operating[18]
|
unknown
|
unknown
|
2021-04-10 00:00:00[18]
|
2922 m³[10][3]
|
2440[13][14]
|
unknown
|
unknown
|
unknown
|
construction[7]
|
2021[7]
|
2022[7]
|
unknown
|
3200 m³[7]
|
2670[7]
|
unknown
|
unknown
|