Hebei Puyang Iron and Steel Co Ltd (河北普阳冶金铸造有限公司, 河北普阳钢铁集团有限公司, 河北新武安钢铁集团普阳钢铁有限公司, 河北普阳钢铁有限公司), also known as Hebei Puyang Metallurgical Casting Co., Ltd., Hebei Puyang Iron and Steel Group Co., Ltd., Hebei Xinwu'an Iron and Steel Group Puyang Iron and Steel Co., Ltd., is a steel plant in Handan, Hebei, China that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.

Location

The map below shows the exact location of the plant in Handan, Hebei, China:

Loading map...
  • Location: East Village, Yangyi Town, Wu'an City, Handan City, Hebei Province
  • Coordinates (WGS 84): 36.733675, 113.925995 (exact)

Background

In 2020, it started to build 1 BF (1x1580m3), BOF (1x140-tonne), producing 1.37 million tons of molten iron and 1.5167 million tons of crude steel.[1][2][3]

In December 2021, the company will start to build a blast furnace (1x1580m3), a BOF (1x120-tonne) and an electric arc furnace (100-tonne) with replacement of two 1050m3 blast furnace. It is planned to be put into operation in December 2023[4]

The 120-ton BOF was completed in June 2024.[5]

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source
1992[6] 7300[7][8] Self-Produced Gas Power Generation, 80MW Power Generation Project[9][10]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Hebei Puyang Industrial Group Co Ltd; Longxiang Group (Hong Kong) unknown; unknown E100000124068; E100000126000 Hebei Puyang Iron and Steel Co Ltd[11] unknown E100000123171

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
finished rolled[12] galvanized, wire rod, plate, pipe, cold rolled, coil[12] building and infrastructure[6] 2022-12-22[13] 2022-12-22[13] unknown BF; BOF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
operating 5567[14][15][16][17][18] 5567[14][15][16][17][18]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
construction 2740[18] 2740[18]
operating 1370[17] 1370[17]
operating pre-retirement 1780[17][19][20] 1780[17][19][20]
retired 890[17][20] 890[17][20]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF 9216[21] NF 1200[21]

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year BOF production EAF production Other/unknown steel production Total (all routes)
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown unknown
2023 [22] [22] 4890[22] 4890[22]

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production Other/unknown iron production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown

Unit Details

Table 9: Blast Furnace Details

Unit name Status Announced date Construction date Start date Retired date Current size Current capacity (ttpa) Decarbonization technology
BF 1 operating pre-retirement[20] 1050.0 m3[23] 890[20][19] unknown
BF 2 operating pre-retirement[20] 1050.0 m3[23] 890[20][17] unknown
BF 3 retired[24][17] 2022[24] 1050.0 m3[23] 890[20][17] unknown
unknown BF (1) operating[24] 2019-12[14] 2022[24] 1580.0 m3[25] 1370[17] unknown
unknown BF (2) construction[18][26] 2021-12[20] 2024[26] 1580.0 m3[27] 1370[18] unknown
unknown BF (3) construction[18][26] 2021-12[20] 2024[26] 1580.0 m3[27] 1370[18] unknown

Table 10: Basic Oxygen Furnace Details

Unit name Status Announced date Start date Current capacity (ttpa) Current size
unknown BOF (1) operating[28] 1350[16][15] 120.0 tonnes[28]
unknown BOF (2) operating[28] 1350[16][15] 120.0 tonnes[28]
unknown BOF (3) operating[24] 2019[14] 2022[24] 1517[14][17] 140.0 tonnes[25]
unknown BOF (4) operating[29][18] 2021-11[16] 2024[29] 1350[18] 120.0 tonnes[27]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "关于河北普阳钢铁有限公司钢铁产能减量置换升级改造项目环境影响报告书的批复"河北省生态环境厅, August 28, 2020
  2. 河北普阳钢铁有限公司升级改造项目产能减量置换方案公告,河北省工业和信息化厅,December 24,2019
  3. 总投资137亿 普阳钢铁、龙凤山铸业等7大项目集中开工,我的钢铁网,October 12, 2020
  4. 河北普阳钢铁有限公司河北新武安钢铁集团文安钢铁有限公司整合重组升级改造项目产能减量置换方案公告,河北省工信厅,December 23, 2021
  5. "河北普阳钢铁有限公司整合重组升级改造项目环境保护设施竣工公示". 河北烘熔钢铁有限公司. 2024-06-05.
  6. 6.0 6.1 https://web.archive.org/web/20200217225259/http://www.pygt.cn:80/china/about.asp?ClassIDone. Archived from the original on 2020-02-17. {{cite web}}: Missing or empty |title= (help)
  7. https://baijiahao.baidu.com/s?id=1806084753063514796&wfr=spider&for=pc. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20240119081928/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20231128194037/https://www.eqxun.com/c/1000102/. Archived from the original on 2023-11-28. {{cite web}}: Missing or empty |title= (help)
  10. https://roll.sohu.com/a/615610132_649931. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20220110210555/https://www.qcc.com/firm/4fb61644b36ab1eada629fc59cd8b857.html. Archived from the original on 10 January 2022. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 https://web.archive.org/web/20200106082606/http://www.pygt.cn:80/china/About.asp?ClassIDone. Archived from the original on 2020-01-06. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 https://web.archive.org/web/20231005205231/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E6%B2%B3%E5%8C%97%E6%99%AE%E9%98%B3%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 2023-10-05. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 http://gxt.hebei.gov.cn/hbgyhxxht/xwzx32/tzgg83/664240/index.html. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 https://web.archive.org/web/20220114001732/http://www.xinhuanet.com/webSkipping.htm. Archived from the original on 2022-01-14. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 16.2 16.3 16.4 https://gxt.hebei.gov.cn/hbgyhxxht/xwzx32/tzgg83/891785/index.html. {{cite web}}: Missing or empty |title= (help)
  17. 17.00 17.01 17.02 17.03 17.04 17.05 17.06 17.07 17.08 17.09 17.10 17.11 17.12 https://web.archive.org/web/20220124214521/https://tks.mysteel.com/20/0828/10/46046D2F0E01D8A3.html. Archived from the original on 2022-01-24. {{cite web}}: Missing or empty |title= (help)
  18. 18.0 18.1 18.2 18.3 18.4 18.5 18.6 18.7 18.8 18.9 http://news.gqsoso.com/qita/202111/26143080.html. {{cite web}}: Missing or empty |title= (help)
  19. 19.0 19.1 19.2 https://gxt.hebei.gov.cn/shouji/xwzx12/tzgg48/895044/index.html. {{cite web}}: Missing or empty |title= (help)
  20. 20.00 20.01 20.02 20.03 20.04 20.05 20.06 20.07 20.08 20.09 20.10 https://news.mysteel.com/21/1223/10/E79D0C650B127613.html. {{cite web}}: Missing or empty |title= (help)
  21. 21.0 21.1 https://www.sohu.com/a/606185822_120568484. {{cite web}}: Missing or empty |title= (help)
  22. 22.0 22.1 22.2 22.3 https://business.sohu.com/a/797548481_120219470. {{cite web}}: Missing or empty |title= (help)
  23. 23.0 23.1 23.2 https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml;http://gxt.hebei.gov.cn/hbgyhxxht/xwzx32/tzgg83/895044/index.html. {{cite web}}: Missing or empty |title= (help)
  24. 24.0 24.1 24.2 24.3 24.4 24.5 https://web.archive.org/web/20240905160430/https://mp.weixin.qq.com/s?__biz=MzUxMDYxMjAxNQ==&mid=2247549490&idx=2&sn=b0fbbdd1e48c579156c16216ccf07ee4&chksm=f9020572ce758c6480b15ef69711cb2622a9f899cc7eac070f33887dbdc6f2d47c1309eb2007&scene=27. Archived from the original on 2024-09-05. {{cite web}}: Missing or empty |title= (help)
  25. 25.0 25.1 http://gxt.hebei.gov.cn/shouji/xwzx12/tzgg48/664240/index.html. {{cite web}}: Missing or empty |title= (help)
  26. 26.0 26.1 26.2 26.3 https://xunbiaobao.baidu.com/biddingDetail?id=bfa3af35db4ad35e6c5a98698f3b3596a62fe8d9&source=seo. {{cite web}}: Missing or empty |title= (help)
  27. 27.0 27.1 27.2 http://gxt.hebei.gov.cn/hbgyhxxht/xwzx32/tzgg83/895044/index.html http://news.gqsoso.com/qita/202111/26143080.html; http://gxt.hebei.gov.cn/hbgyhxxht/xwzx32/tzgg83/895044/index.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  28. 28.0 28.1 28.2 28.3 "全国规范钢铁企业拟增至263家(附全名单及其装备)". finance.sina.com.cn. 2020-03-02. Archived from the original on 2022-02-07. Retrieved 2024-11-19.
  29. 29.0 29.1 http://hongrongsteel.com/wzgyfb.php?id=691. {{cite web}}: Missing or empty |title= (help)