Hebei Taihang Iron and Steel Group Co Ltd (河北太行钢铁集团有限公司(二期 1200高炉)) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Handan, Hebei, China.

Location

The map below shows the exact location of the plant in Handan, Hebei, China:

Loading map...
  • Location: Nanminghe Industrial Park, Wu'an City, Handan City, Hebei Province
  • Coordinates (WGS 84): 36.613716, 114.082349 (exact)

Background

The total investment of Taihang Iron & Steel’s retreat from the city to the park project totaled 20.9 billion yuan to build 6 million tons of iron and steel projects, including two 1,520m3 blast furnaces, 2.68 million tons of iron-making capacity, two 120-ton converters, and 2.8 million tons of steel-making capacity in the first phase.[1]

On February 20, 2021, No. 1 blast furnace was put into production.[2] The first phase of the project were completed and put into production in September 2021.[3]

The second phase of the company's reorganization and relocation project plans to build a 1200m3 blast furnace and a 100-ton converter, and the construction started in September 2022.[4][5]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Workforce size
Main plant Operating[6] 2021[6] 7300[7]
Expansion Operating[8][9] 2022-01[10] 2022-09[9] 2023[8]
Expansion Operating[6] 2021[6]
Expansion Operating[8][9] 2022-01[10] 2022-09[9] 2023[8]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company GEM ID
Main plant Hebei Taihang Iron and Steel Group Co Ltd [100%] E100000123261 [100%] Hebei Taihang Iron and Steel Group Co., Ltd.[11] E100000123223

Table 3: Process and Products

Phase Steel product category Steel products ISO 14001 ISO 50001 Main production equipment Detailed production equipment
Main plant finished rolled[12] Fine bar and wire, new metallurgical materials, metallurgical equipment manufacturing, high-strength steel structure steel[12] 2021-07-12 00:00:00[13] 2021-07-12 00:00:00[13] BF[14] Sinter plant (2x300m2)[14]
Expansion finished rolled[12] Fine bar and wire, new metallurgical materials, metallurgical equipment manufacturing, high-strength steel structure steel[12] BF, BOF[10] 1 BOF (1x100-tonne)[10]
Expansion finished rolled[12] Fine bar and wire, new metallurgical materials, metallurgical equipment manufacturing, high-strength steel structure steel[12] BOF[14] 2 BOF (2x120-tonne)[14]
Expansion finished rolled[12] Fine bar and wire, new metallurgical materials, metallurgical equipment manufacturing, high-strength steel structure steel[12] BF, BOF[10] 1 BOF (1x100-tonne)[10]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating
Expansion operating [10] [10]
Expansion operating 2800 TTPA[15][15] 2800 TTPA[15][15]
Expansion construction 1150 TTPA[10] 1150 TTPA[10]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
Main plant operating 2680 TTPA[15][15] 2680 TTPA[15][15]
Expansion operating 1130 TTPA[10] 1130 TTPA[10]
Expansion operating
Expansion construction [10] [10]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Phase Sinter
Main plant >0 TTPA[6]
Expansion
Expansion
Expansion

Blast Furnace Details

Table 7: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
1 operating[16] unknown unknown 2021-02-20 00:00:00[16] 1520 m³[14] 1340[15] unknown unknown
2 operating[6] unknown unknown 2021-07-01 00:00:00[6] 1520 m³[14] 1340[15] unknown unknown
unknown operating[8][9] 2022-01[10] 2022-09-01 00:00:00[9] unknown 1200 m³[10] 1130[10] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 太行钢铁退城进园、冀南钢铁集团重组搬迁改造项目建设进展如何?,北极星大气网,May 6, 2020
  2. 中国二冶承建的河北太行1#高炉顺利投产,中国钢铁新闻网,February 24, 2021
  3. "太行钢铁有限公司_河北太行钢铁集团有限公司". www.taihangsteel.cn. Retrieved 2023-01-26.
  4. 太行钢铁集团重组搬迁改造项目二期工程产能置换方案公告,河北工信厅,January 18, 2022
  5. "河北省11个钢铁项目获批—中国钢铁新闻网". www.csteelnews.com. 2022-12-01. Retrieved 2023-01-26.{{cite web}}: CS1 maint: url-status (link)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 https://web.archive.org/web/20220817103728/https://www.taihangsteel.cn/intro/7.html. Archived from the original on 17 August 2022. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240119073822/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 http://www.wuan.gov.cn/wasxxgk/zfxxgk/zf/sfgj_35013/fdzdgknr_35097/gzbshy_35598/202309/t20230906_1945777.html. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 http://www.csteelnews.com/xwzx/hydt/202212/t20221201_69417.html. {{cite web}}: Missing or empty |title= (help)
  10. 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 10.13 10.14 10.15 10.16 https://factory.mysteel.com/22/0118/14/17AA6B209335F200.html. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20220111134058/https://www.qcc.com/firm/a81e8583286ece4767b9fd4b39b00a9a.html. Archived from the original on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 https://web.archive.org/web/20220120114939/https://huanbao.bjx.com.cn/news/20200506/1068986.shtml. Archived from the original on 20 January 2022. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 https://web.archive.org/web/20231005194804/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E6%B2%B3%E5%8C%97%E5%A4%AA%E8%A1%8C%E9%92%A2%E9%93%81%E9%9B%86%E5%9B%A2%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 05 October 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 https://www.sohu.com/a/216222267_99913579. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 15.4 15.5 15.6 15.7 15.8 15.9 https://web.archive.org/web/20220129204250/http://www.yidianzixun.com/article/0MVsh7VR. Archived from the original on 29 January 2022. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 http://www.csteelnews.com/xwzx/yjgg/202102/t20210224_47161.html. {{cite web}}: Missing or empty |title= (help)

Resources