Hebei Tangyin Iron and Steel Co Ltd(Caofeidian) (河北唐银钢铁有限公司(曹妃甸)) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Tangshan, Hebei, China.

Location

The map below shows the exact location of the plant in Tangshan, Hebei, China:

Loading map...
  • Location: Caofeidian Small and Medium-sized Enterprise Park, Tangshan City, Hebei Province
  • Coordinates (WGS 84): 39.160401, 118.429806 (exact)

Background

The company released a capacity replacement plan for its urban relocation project in 2019, which included the construction of two 1,500 m³ BF and two 100-ton BOF[1]. These facilities were gradually commissioned at the end of 2022 and early 2023.[2][3]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Workforce size
Main plant Operating[4] 2019-01[5] 2021-04[6] 2022[4] 3118[7]
Expansion Operating[8] 2019-01[5] 2021-04[6] 2023[8]
Expansion Operating[9] 2019-01[5] 2021-04[6] 2023[9]

Table 2: Ownership and Parent Company Information

Phase State-owned entity status Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant Partial HBIS Group Co Ltd [51.0%]; Hebei Yinshui Industrial Group Co Ltd [49.0%] 5000022648 [51%]; unknown [49%] E100000126011 [51%]; E100000123261 [49%] Hebei Tangyin Iron and Steel Co., Ltd.[7] 4298522403 E100000123222

Table 3: Process and Products

Phase Steel product category Steel products ISO 14001 ISO 50001 Main production equipment Detailed production equipment
Main plant semi-finished; finished rolled[10] carbon structural steel,continuous bille,hot-rolled bars, hot-rolled high-speed wire rod (non-construction) and hot-rolled strips[10] 2017-03-07 00:00:00[11] 2019-03-13 00:00:00[11] BF, BOF[5] 2 BOF (2x100-tonne) [12][5][13]
Expansion semi-finished; finished rolled[10] carbon structural steel,continuous bille,hot-rolled bars, hot-rolled high-speed wire rod (non-construction) and hot-rolled strips[10] BOF[5] 2 BOF (2x100-tonne);2 sinter plant (2x650m2)[5][13]
Expansion semi-finished; finished rolled[10] carbon structural steel,continuous bille,hot-rolled bars, hot-rolled high-speed wire rod (non-construction) and hot-rolled strips[10] BF[5] [5][13]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 1150 TTPA[5] 1150 TTPA[5]
Expansion operating 1150 TTPA[5] 1150 TTPA[5]
Expansion operating

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
Main plant operating 1330 TTPA[5] 1330 TTPA[5]
Expansion operating
Expansion operating 1330 TTPA[5] 1330 TTPA[5]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Phase Sinter Pellets
Main plant
Expansion
Expansion 5300 TTPA[13] 1200 TTPA[13]

Blast Furnace Details

Table 7: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
1 operating[9] 2019-01[5] 2021-04-01 00:00:00[6] 2023-02-12 00:00:00[9] 1500 m³[5][13] 1330[5] HBIS signed an agreement with BHP in 2023 for a small trial CCUS technologies in its Hebei steelmaking. It's unclear if this furnace will be directly affected.[14][15][16] unknown
2 operating[4] unknown unknown 2022-12-12 00:00:00[4] 1500 m³[5][13] 1330[5] HBIS signed an agreement with BHP in 2023 for a small trial CCUS technologies in its Hebei steelmaking. It's unclear if this furnace will be directly affected.[14][15][16] unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "河北唐银钢铁有限公司退城搬迁建设项目产能置换方案公告". 河北省工业和信息化厅. 2019-01-22.
  2. "http://www.csteelnews.com/xwzx/yjgg/202302/t20230216_71540.html". 中国钢铁新闻网. 2023-02-16. {{cite news}}: External link in |title= (help)
  3. "唐银钢铁退城搬迁2号1500立高炉投产". 我的钢铁. 2022-12-19.
  4. 4.0 4.1 4.2 4.3 https://m.mysteel.com/22/1219/09/30B6C548D30B645F_abc.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 https://web.archive.org/web/20220119154945/https://info.lgmi.com/html/201901/22/5448.htm. Archived from the original on 19 January 2022. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 https://finance.sina.com.cn/money/future/indu/2022-09-20/doc-imqqsmrn9756186.shtml. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20220110213651/https://www.qcc.com/firm/a0b899e68e0c46b2819d5d4e338afed5.html. Archived from the original on 10 January 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20230920192935/https://baijiahao.baidu.com/s?id=1776256913281564849&wfr=spider&for=pc. Archived from the original on 20 September 2023. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 http://www.csteelnews.com/xwzx/yjgg/202302/t20230216_71540.html. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 https://web.archive.org/web/20231003214708/http://cx.cnca.cn/CertECloud/result/skipDetail?rzjgId=CNCA-R-2002-005&certNumber=00523E1852R0L&showtemp=1&etlId=&lot_number=1a68ae9fdf704ab39fd3bf48b4156c66&pass_token=6c79a0dd123007f7843b0eda603285ade8e45151fb3c2f9e378da14b47e2ca11&gen_time=1696369614&captcha_output=-ztsyUCh5RpsD_D66f6bCpXnDcvt1g4ezg4BeUnpmzMCiTTVd2GqM4hKHlUFlQyhyqaV9ojJY3G1BhuYh8l79FBLP94iUGX2xc6WNSGBTwPCPZr-Ucr6gg340y0YGoJ0clt3-6tOHfjeKPlsTz_kCGygugQ7Q5gKuT0-3xb-RfLoWyxq5JcwZsKV4oV0Zp-A63wlyLi2c4zUg1gZ3wGGNPwCS9pODEBEVRkQsyUxZASL1ywL1XFnfFm35r27Su1oIDHNkD3CBOUjISvhcYTP2A==. Archived from the original on 03 October 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20240119093543/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E6%B2%B3%E5%8C%97%E5%94%90%E9%93%B6%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  12. https://www.sohu.com/a/589126342_121123751#google_vignette. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 13.6 https://web.archive.org/web/20220320134359/https://finance.sina.com.cn/money/future/indu/2020-12-11/doc-iiznctke5889293.shtml. Archived from the original on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 https://web.archive.org/web/20230404131440/https://www.reuters.com/business/sustainable-business/bhp-trial-carbon-capture-with-chinese-steel-firm-hbis-2023-03-27/. Archived from the original on 04 April 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  15. 15.0 15.1 https://web.archive.org/web/20230328050731/https://www.bhp.com/news/media-centre/releases/2023/03/bhp-signs-carbon-capture-and-utilisation-pilot-agreement-with-chinas-hbis-group. Archived from the original on 28 March 2023. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 https://www.steelorbis.com/steel-news/latest-news/bhp-and-hbis-group-ink-agreement-on-carbon-capture-and-utilization-technology-in-china-1284133.htm. {{cite web}}: Missing or empty |title= (help)

Resources