Hebei Yongyang Special Steel Group Co Ltd (河北永洋特钢集团有限公司), also known as Hebei Iron and Steel Group Yongyang Iron and Steel Co., Ltd.; Hebei Yongyang Iron and Steel Co., Ltd., is a blast furnace (BF) and electric arc furnace (EAF) steel plant operating in Handan, Hebei, China.
Location
The map below shows the exact location of the plant in Handan, Hebei, China:
- Location: Jiehedian Township, Yongnian District, Handan City, Hebei Province
- Coordinates (WGS 84): 36.786851, 114.376132 (exact)
Background
Hebei Yongyang Special Steel Group Co., Ltd. plans to build a 1260m³ blast furnace with a production capacity of 1.16 million tons/year, and a 55-ton electric arc furnace with a construction capacity of 410,000 tons/year. It is planned to be put into operation at the end of 2022.[1]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Workforce size | Power source |
---|---|---|---|---|---|---|
Main plant | Operating[2] | – | – | 1993[2] | 3665[3] | State Grid Handan Power Supply Company[4] |
Expansion | Construction[5][6] | 2022-01[6] | 2023-12-28[5][7] | – | – | State Grid Handan Power Supply Company[4] |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | Handan Yongnian Shengda Steel Co Ltd [49.0%]; WEALTH GROUP INVESTMENT LIMITED [39.8%]; Wu'an Hongji Investment Co Ltd [6.5%]; other [2.1%]; Hong Kong Cathay Industrial Group [0.8%] | E100000123261 [54.8%]; E100000126029 [39.8%]; E100000001753 [2.7%]; E100000125999 [0.8%] | Hebei Yongyang Special Steel Group Co., Ltd.[8] | E100000126303 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
Main plant | semi-finished; finished rolled[2] | tube billets for high and medium pressure boiler tubes, oil casing, spring flat steel for automobile leaf springs, hot rolled flat steel for high-strength automobiles, light rail, heavy rail, mining steel, crane rail, U-shaped steel[2] | automotive; energy; tools and machinery[2] | BF, EAF[2] | 1 BOF (1x120-tonne)[2] |
Expansion | semi-finished; finished rolled[2] | tube billets for high and medium pressure boiler tubes, oil casing, spring flat steel for automobile leaf springs, hot rolled flat steel for high-strength automobiles, light rail, heavy rail, mining steel, crane rail, U-shaped steel[2] | automotive; energy; tools and machinery | BF, EAF[6] | 1 EAF (1x55-tonne)[6] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|---|
Main plant | operating | 1200 TTPA[9] | – | 1200 TTPA[9] |
Expansion | construction | – | 410 TTPA[6] | 410 TTPA[6] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 1160 TTPA[2] | 1160 TTPA[2] |
Expansion | construction | 1160 TTPA[10] | 1160 TTPA[10] |
Blast Furnace Details
Table 6: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|
2 | construction[5][10] | 2022-01[6] | 2023-12-28 00:00:00[5][7] | unknown | 1260 m³[6] | 1160[10] | HBIS signed an agreement with BHP in 2023 for a small trial CCUS technologies in its Hebei steelmaking. It's unclear if this furnace will be directly affected.[11][12][13] | unknown |
unknown | operating[14] | unknown | unknown | 2017-10-01 00:00:00[14] | 1260 m³[2] | 1160[2] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 河北新金钢铁有限公司、河北永洋特钢集团有限公司、邯郸市紫山特钢集团有限公司整合重组升级改造项目产能减量置换方案公告,河北省工信厅,January 12, 2022
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 https://web.archive.org/web/20220121115355/http://www.yygt.com.cn/gywm.asp?id. Archived from the original on 21 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119065727/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20231128194153/https://baijiahao.baidu.com/s?id=1684140529061906426&wfr=spider&for=pc. Archived from the original on 28 November 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20240122221957/https://finance.sina.cn/futuremarket/gypzx/2023-12-29/detail-imzzrtci6119140.d.html. Archived from the original on 22 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 https://web.archive.org/web/20220318152820/https://factory.mysteel.com/22/0112/14/C31FF23FFEDD5EDC.html. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20230925160243/https://baijiahao.baidu.com/s?id=1750890463782040778&wfr=spider&for=pc. Archived from the original on 25 September 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.qcc.com/firm/dc5d5683007ff7e58368c588d9dacdac.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 http://epaper.cenews.com.cn/html/1/2021-01/28/07B/2021012807B_pdf.pdf;http://www.yantaida.com/page105?article_id=31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 http://gxt.hebei.gov.cn/hbgyhxxht/xwzx32/tzgg83/893513/index.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230404131440/https://www.reuters.com/business/sustainable-business/bhp-trial-carbon-capture-with-chinese-steel-firm-hbis-2023-03-27/. Archived from the original on 04 April 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230328050731/https://www.bhp.com/news/media-centre/releases/2023/03/bhp-signs-carbon-capture-and-utilisation-pilot-agreement-with-chinas-hbis-group. Archived from the original on 28 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.steelorbis.com/steel-news/latest-news/bhp-and-hbis-group-ink-agreement-on-carbon-capture-and-utilization-technology-in-china-1284133.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 https://www.sohu.com/a/437819841_466870.
{{cite web}}
: Missing or empty|title=
(help)