Huangshi Xingang Heavy Industry Technology Co Ltd
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Huangshi Xingang Heavy Industry Technology Co Ltd (黄石恒特装备科技有限公司, 黄石新港重科, 黄石新港重工科技有限公司), also known as Huangshi Hengte Equipment Technology Co., Ltd., is a steel plant in Huangshi, Hubei, China that operates ironmaking and electric arc furnace (EAF) technology.
Location
The map below shows the approximate location of the plant in Huangshi, Hubei, China:
- Location: No. 1, Haizhou Avenue, Xingang (Logistics) Industrial Park, Huangshi, Hubei Province
- Coordinates (WGS 84): 30.097108, 115.284652 (approximate)
Background
In 2021, the company acquired 680 tons of ironmaking capacity from Tianjin Rongcheng United Steel Group Co., Ltd.[1]
According to the capacity replacement plan announcement published in 2023, the company plans to build three 100-ton electric arc furnaces.[2]
On June 27, 2024, the Hubei Provincial Development and Reform Commission approved the energy conservation review for Huangshi Xinguang Heavy Industry Technology Co., Ltd.'s high-end special steel project, which will have an annual capacity of 2.25 million tons and will replace 2.3 million tons of steel production capacity from other plants(three 100-ton electric arc furnaces).[3]
Plant Details
Table 1: General Plant Details
Announced date | Construction date | Start date | Power source |
---|---|---|---|
2022-06[4][5] | 2023[6] | 2024[6] | State Grid Huangshi Power Supply Company[7] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
WEALTH GROUP INVESTMENT LIMITED | unknown | E100000126029 | Huangshi Xingang Heavy Industry Technology Co Ltd[8] | unknown | E100000126571 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | Main production equipment |
---|---|---|---|
semi-finished, finished rolled[9] | structural, h-beam, special, plate[9] | automotive, building and infrastructure[9] | EAF; Iron other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
construction | 2250[6][10] | 2250[6][10] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Other/unspecified iron capacity | Nominal iron capacity (total) |
---|---|---|
announced | 680[11] | 680[11] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel | Sinter | Coke | Pellets |
---|---|---|---|
NF | NF | NF | NF |
Unit Details
Table 7: Electric Arc Furnace Details
Unit name | Status | Announced date | Construction date | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|---|
unknown EAF (1) | construction[12] | 2022-06[4][5] | 2024-09[12] | 750[6][10] | 100.0[6] |
unknown EAF (2) | construction[12] | 2022-06[4][5] | 2024-09[12] | 750[6][10] | 100.0[6] |
unknown EAF (3) | construction[12] | 2022-06[4][5] | 2024-09[12] | 750[6][10] | 100.0[6] |
Table 8: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated | % other iron |
---|---|---|---|---|---|---|---|---|---|
unknown EAF (1) | yes[13] | >0[13] | unknown | unknown | unknown | >0[14] | unknown | unknown | unknown |
unknown EAF (2) | yes[13] | >0[13] | unknown | unknown | unknown | >0[14] | unknown | unknown | unknown |
unknown EAF (3) | yes[13] | >0[13] | unknown | unknown | unknown | >0[14] | unknown | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "天津荣程联合钢铁集团有限公司产能出让公告". 我的钢铁. 2021-11-04.
- ↑ "黄石新港重工建设3座100吨电炉冶炼项目产能置换方案公告". 西本资讯(钢铁). 2023-04-21.
- ↑ "省发改委关于黄石新港重工科技有限公司黄石新港重科高端优特钢智能制造项目节能审查的意见". 湖北省发展和改革委员会. 2024-10-30.
- ↑ 4.0 4.1 4.2 4.3 https://m.mysteel.com/22/0606/10/E1F4381184AEB01D_abc.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://m.cnfeol.com/Article/2745662.aspx.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 https://web.archive.org/web/20241007162353/https://chanfsha.steelx2.com/news/584/584141.html. Archived from the original on 2024-10-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20231129174535/https://weibo.com/5506825031/Nj03mpXiy. Archived from the original on 2023-11-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.qcc.com/firm/f09e214335214365751ed03be20cc63f.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 https://web.archive.org/web/20230927132214/http://hsxgzgkjyxgs.21hubei.com/. Archived from the original on 2023-09-27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 https://www.asianmetal.cn/news/data/2546063/32.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://m.mysteel.com/21/1104/11/55BB3B2BF84FF2D8_abc.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 12.5 http://hsxg.huangshi.gov.cn/zjxg/yqdt/202409/t20240923_1152647.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 13.4 13.5 https://web.archive.org/web/20240906182730/https://finance.sina.cn/futuremarket/gypzx/2023-07-08/detail-imyzynmp7121613.d.html. Archived from the original on 2024-09-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 https://web.archive.org/web/20240912183135/https://www.sohu.com/a/281398726_313737. Archived from the original on 2024-09-12.
{{cite web}}
: Missing or empty|title=
(help)