Huta Czestochowa steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Huta Czestochowa steel plant (Liberty Częstochowa), also known as Liberty Czestochowa steel plant, ISD Huta Czestochowa steel plant, is a steel plant in Częstochowa, Silesia, Poland that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Częstochowa, Silesia, Poland:

Loading map...
  • Location: Ludwika Trochimowskiego 25, 42-200 Częstochowa, Poland
  • Coordinates (WGS 84): 50.782614, 19.165566 (exact)

Background

Production at the ISD Huta Czestochowa steel plant is scrap-based; the facility's start date is unknown but it was restarted in 2021.[1][2]

Plant Details

Table 1: General Plant Details

Start date Workforce size
1902[3] 950[4]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
GFG Alliance Ltd 5057811578 E100001000556 Liberty Steel Group [100%][5] 5076098979 E100000130950 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Main production equipment
semi-finished[6] plate[7] building and infrastructure, energy, tools and machinery, transport[8] yes[8] yes[8] EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 840[6] 840[6]

Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production Total (all routes)
2019 unknown unknown
2020 unknown unknown
2021 510[9] unknown[9] 510[9]
2022 337[9] unknown[9] 337[9]
2024 [10] [10] [10]

Unit Details

Table 6: Electric Arc Furnace Details

Unit name Status Start date Current capacity (ttpa)
unknown EAF (1) operating[11][10][12][13] 1997[4] 840[6]

Table 7: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % HBI % sponge iron (unknown if DRI or HBI) % basic/merchant pig iron % granulated pig iron % pig iron (unknown if basic/merchant or granulated % other iron
unknown EAF (1) yes[14] 100.00[15] unknown unknown unknown unknown unknown unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "LIBERTY Steel restarts Huta Częstochowa Electric Arc Furnace". LIBERTY Steel Group. Archived from the original on March 19, 2022. Retrieved March 19, 2022.
  2. Laura, Diana. "Liberty Steel completes acquisition of leased Polish plate mill for $51.55 million". S&P Global. Archived from the original on March 20, 2022. Retrieved March 20, 2022.
  3. https://web.archive.org/web/20220125104645/https://focusonbusiness.eu/en/news/125-years-of-tradition/4463. Archived from the original on 2022-01-25. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://gmk.center/en/posts/huta-czestochowa-to-be-or-not-to-be/. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20230921180635/https://libertysteelgroup.com/pl/?lang=en. Archived from the original on 2023-09-21. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 https://web.archive.org/web/20220320124513/https://www.spglobal.com/commodity-insights/en/market-insights/latest-news/metals/052821-liberty-steel-completes-acquisition-of-leased-polish-plate-mill-for-5155-million. Archived from the original on 2022-03-20. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240806153336/https://libertysteelgroup.com/pl/departments/walcownia-blach-grubych/?lang=en. Archived from the original on 2024-08-06. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 (PDF) https://web.archive.org/web/20230626022047/http://libertysteelgroup.com/pl/wp-content/uploads/sites/10/2021/09/Liberty-Czestochowa-Brochure-A4.pdf. Archived from the original (PDF) on 2023-06-26. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 (PDF) https://web.archive.org/web/20240209185700/https://libertysteelgroup.com/wp-content/uploads/2023/11/Liberty-Steel-Sustainability-Report-2023.pdf. Archived from the original (PDF) on 2024-02-09. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 https://mepsinternational.com/gb/en/news/huta-czestochowa-restart-to-boost-polish-plate-supply. {{cite web}}: Missing or empty |title= (help)
  11. https://gmk.center/en/news/polish-liberty-czestochowa-prepares-to-resume-production/. {{cite web}}: Missing or empty |title= (help)
  12. https://www.oreaco.com/steel/polands-huta-czestochowa-steel-plant-to-reopen-after-15-month-hiatus. {{cite web}}: Missing or empty |title= (help)
  13. https://web.archive.org/web/20220318101455/https://libertysteelgroup.com/news/liberty-steel-restarts-huta-czestochowa-electric-arc-furnace/. Archived from the original on 2022-03-18. {{cite web}}: Missing or empty |title= (help)
  14. https://web.archive.org/web/20240809185743/https://www.spglobal.com/commodityinsights/en/market-insights/latest-news/metals/052821-liberty-steel-completes-acquisition-of-leased-polish-plate-mill-for-5155-million. Archived from the original on 2024-08-09. {{cite web}}: Missing or empty |title= (help)
  15. (PDF) https://web.archive.org/web/20230116180549/https://libertysteelgroup.com/wp-content/uploads/2022/12/Liberty-Steel-Sustainability-Report-2022.pdf. Archived from the original (PDF) on 2023-01-16. {{cite web}}: Missing or empty |title= (help)

Resources