JSOL Odisha steel plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

JSPL Odisha steel plant, also known as JSPL Angul steel plant, is a blast furnace-basic oxygen furnace (BF-BOF), direct reduced iron (DRI) and electric arc furnace (EAF) steel plant operating in Angul, Odisha, India.

Location

The map below shows the exact location of the plant in Angul, Odisha, India:

Loading map...
  • Location: Chhendipada Road, SH-63, Jindal Nagar, Angul, Odisha 759111, India
  • Coordinates (WGS 84): 20.884896, 84.991539 (exact)

Background

The JSPL Odisha plant houses India's largest 4.25 mtpa blast furnace.[1] On 22 August, 2021, JSPL announced its plans to expand capacity of the Angul plant from 6 mtpa to 25.2 mtpa liquid steel (24.79 mtpa crude steel) by 2030. The expansion is planned in two phases. The company had already received approval from Odisha’s State High-Level Clearance Authority, headed by Chief Minister of Odisha.[2][3] According to an OECD report from 2021, an expansion of 6500 ttpa is planned using primary steel production route which is expected to become operational by 2030.[4] A pre-feasibility report dated 05 July, 2022, outlines an expansion plan involving setting up of an integrated steel plant of 19.2 mtpa crude steel capacity. [5] As of 30 September, 2022, the company was all set to go ahead with the project after gaining local people's support at a public hearing attended by over 600 people.[6][7]

As of November 2023, the expansion plan to double the capacity of the plant using primary steel production route was already underway and is expected to be completed in FY25.[8] The second phase expansion would be taken up after completing the first phase.[9]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Workforce size Power source Iron ore source
Main plant Operating[10] 2013[11] Angul Steel power station, a 810 MW captive power plant[10] Captive iron ore mines at Tensa, Odisha with production capacity of 3.11 MTPA iron ore.[12]
Expansion Construction[13] 2021-08[14] 2023[15][14] 2025[13][16] 3250[14][15]
Expansion Announced[17] 2021-08[14] 2025[18] 2030[17] 3250[14][15]

Table 2: Ownership and Parent Company Information

Phase Owner Owner company PermID Owner company GEM ID
Main plant Jindal Steel And Power Ltd[19] 4295874065 E100000153087

Table 3: Process and Products

Phase Steel product category Steel products Steel sector end users ISO 14001 Main production equipment Detailed production equipment
Main plant semi-finished; finished rolled[10] bar, plate[10] automotive; building and infrastructure; energy; transport[10] yes[20] BF, BOF, DRI, EAF[10][21] sinter plant; BF (4.25 mtpa); 1 Midrex DRI plant (1.8 MTPA, began in 2015); 1 BOF (250-tonne, built 2017), 1 EAF (250mt, built 2013)[10][22][23][24]
Expansion semi-finished; finished rolled[10] hot rolled, cold rolled, plates, wire, bar, billets[14] automotive; building and infrastructure; energy; transport[10] BF, DRI, BOF[25] 1 BF; 1 DRI; 2 BOF (300 ton and 360 ton); coke ovens; sinter plant[14]
Expansion semi-finished; finished rolled[10] hot rolled, cold rolled, plates, wire, bar, billets[14] automotive; building and infrastructure; energy; transport[10] BF, BOF, DRI, EAF[17] 2 BF; 1 DRI; 2 BOF (300 ton and 360 ton); 2 EAF (250 ton and 360 ton); coke ovens, sinter plant[14]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Basic oxygen furnace steelmaking capacity Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 3500 TTPA[26] 2500 TTPA[23] 6000 TTPA[26][23]
Expansion construction 6300 TTPA[25][13][25][13] 6300 TTPA[25][13][25][13]
Expansion announced 6900 TTPA[14][14] 6000 TTPA[14][14] 12900 TTPA[14][14][14][14]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
Main plant operating 4250 TTPA[26] 1800 TTPA[27] 6050 TTPA[26][27]
Expansion construction 4600 TTPA[13] 2700 TTPA[28][29] 7300 TTPA[13][28][29]
Expansion announced 9400 TTPA[14][14] 2700 TTPA[14] 12100 TTPA[14][14][14]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Phase Ferronickel Sinter Coke Pellets
Main plant 80 TTPA[14] 5000 TTPA[10] 2000 TTPA[14] 5000 TTPA[14]
Expansion 1550 TTPA[30] 12000 TTPA[13]
Expansion 5750 TTPA[14] 4055 TTPA[30] 14000 TTPA[30]

Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year BOF Production EAF Production Total (all routes)
2020 3600 TTPA[31] 900 TTPA[31] 4500 TTPA
2021 2590 TTPA[32] 1850 TTPA[32] 4440 TTPA
2022 2877 TTPA[33] 2055 TTPA[33] 4931 TTPA

Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year BF Production DRI Production Total (all routes)
2020 3188 TTPA[31] 1350 TTPA[31] 4538 TTPA
2021 3145 TTPA[32] 1332 TTPA[32] 4477 TTPA
2022

Blast Furnace Details

Table 9: Blast Furnace Details

Unit name Status Announced date Construction date Start date Furnace manufacturer and model Current size Current capacity (ttpa) Decarbonization technology Most recent relining
1 operating[34] unknown 2013-10[35] 2017-05-27[35] Primetals Technologies Primetals Technologies Blast Furnace Design[35][35] 4553 m³[10][22][13] 4250[26] unknown unknown
2 construction[13] 2021-05[28] 2023[36] 2025[13] 5400 m³[14] 4600[13] unknown unknown
unknown announced[17] 2021-08[14] unknown 2030[17] 5400 m³[14] 4600[14] unknown unknown
unknown announced[17] 2021-08[14] unknown 2030[17] 6000 m³[14] 4800[14] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "India Plants: Odisha". Jindal Steel Power. Retrieved 11 October, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. "JSPL plans to expand Angul steel plant's capacity to 25.2 MTPA by 2030". Update Odisha. 22 August, 2021. Retrieved 11 October, 2023. {{cite news}}: Check date values in: |access-date= and |date= (help)
  3. "Expansion of ISP to 25.2 MTPA Liquid Steel (24.79 MTPA Crude Steel) and 12.5 MTPA Cement in Odisha: Pre-feasibility report". MoEF&CC. Retrieved 18 December, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. "Latest developments in steelmaking capacity" (PDF). OECD. 2021. Retrieved 11 October, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  5. "Pre-feasibility report" (PDF). MoEF&CC. 05 July, 2022. Retrieved 11 October, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  6. "JSP arm set to go for expansion of Angul steel facility". Economic Times. 30 September, 2022. Retrieved 11 October, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  7. admin. "Positive response to Jindal Steel Odisha's Angul steel plant expansion plan". The Business Bytes. Retrieved 2023-12-18.
  8. "Jindal Steel & Power: Q2FY24 Earnings Presentation" (PDF). Jindal Steel & Power. 02 November, 2023. Retrieved 18 December, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  9. "Jindal Steel & Power MD talks expansion, capex, and more". www.constructionworld.in. Retrieved 2023-12-18.
  10. 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 https://web.archive.org/web/20220121160407/https://www.jindalsteelpower.com/businesses/angul.html. Archived from the original on 21 January 2022. {{cite web}}: Missing or empty |title= (help)
  11. https://www.business-standard.com/company/jindal-steel-20287/information/company-history#:~:text=On%2028%20August%202012%20Jindalannual%20capacity%20of%202%20MTPA. {{cite web}}: Missing or empty |title= (help)
  12. https://web.archive.org/web/20220124202431/https://www.jindalsteelpower.com/. Archived from the original on 24 January 2022. {{cite web}}: Missing or empty |title= (help)
  13. 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 13.11 13.12 (PDF) https://web.archive.org/web/20240111012842/https://d2lptvt2jijg6f.cloudfront.net/jindalsteelpower/custom/1699246731Binder.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  14. 14.00 14.01 14.02 14.03 14.04 14.05 14.06 14.07 14.08 14.09 14.10 14.11 14.12 14.13 14.14 14.15 14.16 14.17 14.18 14.19 14.20 14.21 14.22 14.23 14.24 14.25 14.26 14.27 14.28 14.29 14.30 14.31 14.32 14.33 (PDF) http://environmentclearance.nic.in/writereaddata/Online/TOR/05_Jul_2022_10392353339913480FinalPFR-.pdf. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 https://web.archive.org/web/20221006123445/https://infra.economictimes.indiatimes.com/news/construction/jsp-arm-set-to-go-for-expansion-of-angul-steel-facility/94551977. Archived from the original on 06 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  16. (PDF) https://web.archive.org/web/20240111022118/https://www.careratings.com/upload/CompanyFiles/PR/202310141055_Jindal_Steel_and_Power_Limited.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 17.2 17.3 17.4 17.5 17.6 https://web.archive.org/web/20220121160123/https://updateodisha.com/2021/08/22/jspl-plans-to-expand-angul-steel-plants-capacity-to-25-2-mtpa-by-2030-72898/. Archived from the original on 21 January 2022. {{cite web}}: Missing or empty |title= (help)
  18. https://web.archive.org/web/20240111021048/https://www.constructionworld.in/steel-news/jindal-steel--power-md-talks-expansion-capex-and-more/44895. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  19. https://web.archive.org/web/20220111143857/https://www.jindalsteelpower.com/. Archived from the original on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  20. (PDF) https://web.archive.org/web/20240111035602/https://wikirate.s3.amazonaws.com/files/3755796/14984391.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  21. (PDF) https://web.archive.org/web/20220108035637/https://www.teriin.org/sites/default/files/2020-03/Towards%20a%20Low%20Carbon%20Steel%20Sector%20Report.pdf. Archived from the original (PDF) on 08 January 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  22. 22.0 22.1 https://web.archive.org/web/20220320173526/https://www.midrex.com/about-midrex/midrex-plants/. Archived from the original on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  23. 23.0 23.1 23.2 https://www.spglobal.com/commodityinsights/en/market-insights/latest-news/metals/080713-jindal-commissions-indias-largest-electric-arc-furnace-in-odisha. {{cite web}}: Missing or empty |title= (help)
  24. https://web.archive.org/web/20220724180511/https://www.businessworld.in/article/jspl-completes-250-ton-bof-at-angul-steel-plant/26-12-2017-135742/. Archived from the original on 24 July 2022. {{cite web}}: Missing or empty |title= (help)
  25. 25.0 25.1 25.2 25.3 25.4 (PDF) https://web.archive.org/web/20220111173338/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf. Archived from the original (PDF) on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  26. 26.0 26.1 26.2 26.3 26.4 https://web.archive.org/web/20220111101326/https://www.jindalsteelpower.com/odisha.html. Archived from the original on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  27. 27.0 27.1 https://web.archive.org/web/20220729074539/https://www.jindalsteelpower.com/Odisha.html. Archived from the original on 29 July 2022. {{cite web}}: Missing or empty |title= (help)
  28. 28.0 28.1 28.2 https://web.archive.org/web/20220129215842/https://www.projectstoday.com/News/JSPL-announces-next-phase-of-expansion-plans. Archived from the original on 29 January 2022. {{cite web}}: Missing or empty |title= (help)
  29. 29.0 29.1 (PDF) https://environmentclearance.nic.in/writereaddata/Form-1A/Minutes/3103202355088612ApprovedMinutesof25thEAC.pdf. {{cite web}}: Missing or empty |title= (help)
  30. 30.0 30.1 30.2 https://web.archive.org/web/20240111025835/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=fkK%2FUXngSks3UdY0903hLIcg4VONhLtP0rDrHva5Prl2rtnQlZYhfxx32UaBOcsSXIpEYx0dCvmeaeyxadYKpUQBmybbg9dt43tX52RvTMDn2%2FZwnRIK4sghGU1Wz4u4&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%2FpgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  31. 31.0 31.1 31.2 31.3 (PDF) https://web.archive.org/web/20240125061008/https://steel.gov.in/sites/default/files/Annual%20Report-Ministry%20of%20Steel%202020-21.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  32. 32.0 32.1 32.2 32.3 (PDF) https://web.archive.org/web/20211021063454/https://d2lptvt2jijg6f.cloudfront.net/jindalsteelpower/post/1629863392_JSPL%20Investor%20Presentation%2024Aug21vFFF.pdf. Archived from the original (PDF) on 21 October 2021. {{cite web}}: Missing or empty |title= (help)
  33. 33.0 33.1 (PDF) https://web.archive.org/web/20240111064140/https://www.motilaloswal.com/site/rreports/638231067730954202.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  34. https://web.archive.org/web/20190504045009/https://www.business-standard.com/article/companies/jspl-successfully-completes-basic-oxygen-furnace-in-odisha-plant-117122600713_1.html. Archived from the original on 04 May 2019. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  35. 35.0 35.1 35.2 35.3 (PDF) https://web.archive.org/web/20210718151623/https://www.primetals.com/fileadmin/user_upload/content/01_portfolio/1_ironmaking/blast-furnace/JSPL_ANGUL_-_BLAST_FURNACE_NO1.pdf. Archived from the original (PDF) on 18 July 2021. {{cite web}}: Missing or empty |title= (help)
  36. (PDF) https://d2lptvt2jijg6f.cloudfront.net/jindalsteelpower/custom/1698757313investor-presentation.pdf. {{cite web}}: Missing or empty |title= (help)

Resources