JSPL Asanboni Steel Plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
JSPL Asanboni Steel Plant is a steel plant in Asanboni, Narayanpur, East Singhbhum, Jharkhand, India that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.
Location
The map below shows the approximate location of the plant in Asanboni, Narayanpur, East Singhbhum, Jharkhand, India:
- Location: Asanboni, Narayanpur, East Singhbhum, Jharkhand, India
- Coordinates (WGS 84): 24.131037, 87.438728 (approximate)
Background
In 2005, JSPL announced its plan to set up a 6000 ttpa steel plant in phases at Asanboni, Jharkhand, India, the public hearing of which was held on 08 March 2014.[1][2][3] The plant required an investment of INR 22,000 crores and about 1,400 acres of land.[4] The company ran into land acquisition problems.[2] As of March 2014, the company said the project was still on and were expecting commissioning in 2019.[5] As of November 2024, there has been no further updates on the project. However, OECD continues to list the plant in upcoming projects.[6]
Plant Details
Table 1: General Plant Details
Announced date | Power source | Iron ore source | Coal source |
---|---|---|---|
2005[7] | CPP, 1320 MW Godda thermal power plant[8] | unknown | unknown |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Jindal Steel & Power Ltd | 4295874065 | E100001000439 | Jindal Steel & Power Ltd[9] | 4295874065 | E100001000439 |
Table 3: Process and Products
Steel product category | Steel products | Main production equipment |
---|---|---|
finished rolled[10] | rebar[10] | BF; BOF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
announced | 6500[10] | 6500[10] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
announced | 6200[10] | 6200[10] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter | Coke | Pellets |
---|---|---|
10000[10] | 3600[10] | 4500[10] |
Unit Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Current capacity (ttpa) | Decarbonization technology |
---|---|---|---|---|
unknown BF (1) | announced[10] | 2005[7] | 6200[10] | unknown |
Table 8: Basic Oxygen Furnace Details
Unit name | Status | Current capacity (ttpa) | Current size |
---|---|---|---|
unknown BOF (1) | announced[10] | 1625[10] | 250.0 tonnes[10] |
unknown BOF (2) | announced[10] | 1625[10] | 250.0 tonnes[10] |
unknown BOF (3) | announced[10] | 1625[10] | 250.0 tonnes[10] |
unknown BOF (4) | announced[10] | 1625[10] | 250.0 tonnes[10] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Jindal plant: Villagers statements recorded for NOC". BusinessLine. 2014-03-08. Retrieved 2023-12-19.
- ↑ 2.0 2.1 Cite error: Invalid
<ref>
tag; no text was provided for refs named:0
- ↑ "Visitors Back With Hope". www.minesandcommunities.org. Retrieved 2023-12-19.
- ↑ "Villagers record statements for NOC for proposed steel plant". News18. 2014-03-08. Retrieved 2023-12-19.
- ↑ "Jindal steel plant clears first hurdle". www.telegraphindia.com. Retrieved 2023-12-19.
- ↑ "Wayback Machine" (PDF). web.archive.org. Retrieved 2024-11-12.
- ↑ 7.0 7.1 https://web.archive.org/web/20240111020331/http://www.minesandcommunities.org/article.php?a=4863. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240111045700/https://economictimes.indiatimes.com/industry/energy/power/jspl-to-set-up-1320-mw-plant-in-jharkhand/articleshow/19811196.cms. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230321010829/https://www.msmemart.com/newslist/jspl-to-set-up-1320-mw-plant-in-jharkhand/881. Archived from the original on 2023-03-21.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 10.13 10.14 10.15 10.16 10.17 10.18 10.19 10.20 10.21 10.22 (PDF) https://web.archive.org/web/20240111025615/https://environmentclearance.nic.in/writereaddata/Form-1A/Minutes/0_0_6116124712141Minutesof18EAC28_4_2014.pdf. Archived from the original (PDF) on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help)