JSW Kadapa steel plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

JSW Kadapa steel plant, also known as KSL, is an electric arc furnace (EAF) steel plant under construction in Kadapa, Andhra Pradesh, India.

Location

The map below shows the exact location of the plant in Kadapa, Andhra Pradesh, India:

Loading map...
  • Location: Sunnapurallapalle Village, Kadapa District, Andhra Pradesh, India
  • Coordinates (WGS 84): 14.768550, 78.403263 (exact)

Background

In December 2022, Andhra Pradesh State Investment Promotion Board (SIPB) gave its consent for JSW Steel Limited's proposal to set up a steel plant in Kadapa at a cost of Rs 8,800 crore. The plant will be developed in 24-30 months: 1 mtpa in the first year, which will be upgraded to 2 mtpa in the second year and finally to 3 mtpa in the third year.[1][2]

The construction of the plant began in February 2023.[3] JSW Group Chairman Sajjan Jindal declared that the plant would use green energy for its operations.[4] In May 2023, JSW reported that they have decided to go ahead with scrap-based electric arc furnace technology for the plant.[5] As of December 2023, JSW had made little progress in the project, other than infrastructure works like approach road, a dedicated railway line and high-tension power and water supply, all at different stages of execution.[6]

Plant Details

Table 1: General Plant Details

Plant status Construction date Start date Power source
Construction[7] 2023-02[7] 2025[7] Hydroelectric Power Plant[8]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
JSW Steel Ltd [100%] 4295872888 [100%] E100000001753 [53.2%]; E100001010147 [15%]; E100001010148 [11%]; E100001000520 [7.5%]; E100001000521 [5.9%]; E100001010037 [0.9%]; E100001010033 [0.8%]; E100001010034 [0.7%]; E100001010036 [0.6%]; E100001010035 [0.6%]; E100001001119 [0.6%] JSW Steel Ltd[9] 4295872888 E100001000516

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
finished rolled[9] long products[9] EAF[9][10] EAF (# unknown)[9]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
construction 3000 TTPA[9] 3000 TTPA[9]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "JSW Steel Reports Highest-Ever Standalone Crude Steel Production In January". swarajyamag.com. Retrieved 2023-12-11.
  2. Feb 16, Sandeep Raghavan / TNN / Updated:; 2023; Ist, 09:44. "JSW steel plant in Kadapa district to be set up at Rs 8,800 crore investment | Amaravati News - Times of India". The Times of India. Retrieved 2023-12-12.{{cite web}}: CS1 maint: extra punctuation (link) CS1 maint: numeric names: authors list (link)
  3. Bureau, Our (2023-02-15). "Construction work on ₹8,800-cr JSW steel plant begins in Andhra Pradesh". BusinessLine. Retrieved 2023-12-12.
  4. "Andhra Pradesh: Construction begins in the JSW Steel plant". www.constructionworld.in. Retrieved 2023-12-13.
  5. Raghavendra, V. (2023-05-03). "Andhra Pradesh: JSW Group opts for electric arc furnace at steel plant coming up in Kadapa district". The Hindu. ISSN 0971-751X. Retrieved 2023-12-13.
  6. Raghavendra, V. (2023-12-02). "Kadapa steel plant remains an unrealised dream despite efforts by successive governments". The Hindu. ISSN 0971-751X. Retrieved 2023-12-13.
  7. 7.0 7.1 7.2 https://web.archive.org/web/20230306211145/https://www.thehindubusinessline.com/companies/construction-work-on-8800-cr-jsw-steel-plant-begins-in-ap/article66513255.ece. Archived from the original on 06 March 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  8. https://web.archive.org/web/20221223203716/https://www.moneycontrol.com/news/business/ap-govt-gives-green-signal-to-jsws-steel-plant-adanis-1600-mw-hydroelectric-energy-storage-project-9693591.html. Archived from the original on 23 December 2022. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 https://www.steelorbis.com/steel-news/latest-news/indias-jsw-steel-limited-likely-to-opt-for-eaf-route-for-kadapa-greenfield-project-1288731.htm. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20230522093027/https://www.thehindu.com/news/national/andhra-pradesh/andhra-pradesh-jsw-group-opts-electric-arc-furnace-at-steel-plant-coming-up-in-kadapa-district/article66807174.ece. Archived from the original on 22 May 2023. {{cite web}}: Missing or empty |title= (help)