JSW Kadapa steel plant, also known as AP High Grade Steels Limited (formerly), YSR Steel Corporation Kadapa steel plant, Kadapa Steel Plant (KSP), is a steel plant in Kadapa, Jammalamadugu, Andhra Pradesh, India that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Kadapa, Jammalamadugu, Andhra Pradesh, India:

Loading map...
  • Location: Sunnapurallapalle and Peddandluru Villages, Jammalamadugu Mandal, Kadapa District, Andhra Pradesh, India
  • Coordinates (WGS 84): 14.76855, 78.403263 (exact)

Background

In November 2019, AP High Grade Steels Limited (APHSL) was incorporated 2019 as a fully owned undertaking of the Government of Andhra Pradesh for formation of a 3 mtpa Steel Plant in YSR Kadapa District.[1] On December 23, 2019, the foundation stone for APHSL was laid at Sunnapuraalla Palle village of YSR Kadapa District.[2] The project was then rejected by SAIL citing feasibility issues. The Andhra Pradesh government continued pursuing the project, which is now being carried forward by JSW group, to be developed in phases.

In December 2022, Andhra Pradesh State Investment Promotion Board (SIPB) gave its consent for JSW Steel Limited's proposal to set up a steel plant in Kadapa at a cost of Rs 8,800 crore. The plant will be developed in 24-30 months: 1 mtpa in the first year, which will be upgraded to 2 mtpa in the second year and finally to 3 mtpa in the third year.[3][4]

The construction of the plant began in February 2023.[5] JSW Group Chairman Sajjan Jindal declared that the plant would use green energy for its operations.[6] In May 2023, JSW reported that they have decided to go ahead with scrap-based electric arc furnace technology for the plant.[7] As of December 2023, JSW had made little progress in the project, other than infrastructure works like approach road, a dedicated railway line and high-tension power and water supply, all at different stages of execution.[8]

Plant Details

Table 1: General Plant Details

Announced date Construction date Start date Power source Iron ore source Coal source
2022[9] 2023-02[10] 2026[11] Hydroelectric Power Plant[12] unknown unknown

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Partial JSW Steel Ltd 4295872888 E100001000516 JSW Steel Ltd[13] 4295872888 E100001000516

Table 3: Process and Products

Steel product category Steel products Main production equipment
finished rolled[13] long products[13] EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
construction 3000[13] 3000[13]

Table 5: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF NF NF NF

Unit Details

Table 6: Electric Arc Furnace Details

Unit name Status Announced date Construction date Start date Current capacity (ttpa)
unknown EAF (1) construction[10] 2023-05-04[13] 2023[10] 2025[13][11] 3000[13]

Table 7: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % HBI % sponge iron (unknown if DRI or HBI) % basic/merchant pig iron % granulated pig iron % pig iron (unknown if basic/merchant or granulated % other iron
unknown EAF (1) yes[14] >0[14] unknown unknown unknown unknown unknown unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Home page". AP High grade steel. Retrieved 17 October, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. "About". AP high grade steels. Retrieved 17 October, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  3. "JSW Steel Reports Highest-Ever Standalone Crude Steel Production In January". swarajyamag.com. Retrieved 2023-12-11.
  4. Feb 16, Sandeep Raghavan / TNN / Updated:; 2023; Ist, 09:44. "JSW steel plant in Kadapa district to be set up at Rs 8,800 crore investment | Amaravati News - Times of India". The Times of India. Retrieved 2023-12-12.{{cite web}}: CS1 maint: extra punctuation (link) CS1 maint: numeric names: authors list (link)
  5. Bureau, Our (2023-02-15). "Construction work on ₹8,800-cr JSW steel plant begins in Andhra Pradesh". BusinessLine. Retrieved 2023-12-12.
  6. "Andhra Pradesh: Construction begins in the JSW Steel plant". www.constructionworld.in. Retrieved 2023-12-13.
  7. Raghavendra, V. (2023-05-03). "Andhra Pradesh: JSW Group opts for electric arc furnace at steel plant coming up in Kadapa district". The Hindu. ISSN 0971-751X. Retrieved 2023-12-13.
  8. Raghavendra, V. (2023-12-02). "Kadapa steel plant remains an unrealised dream despite efforts by successive governments". The Hindu. ISSN 0971-751X. Retrieved 2023-12-13.
  9. https://web.archive.org/web/20240115073657/https://swarajyamag.com/business/jsw-steel-reports-highest-ever-standalone-crude-steel-production-in-january. Archived from the original on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 https://web.archive.org/web/20230306211145/https://www.thehindubusinessline.com/companies/construction-work-on-8800-cr-jsw-steel-plant-begins-in-ap/article66513255.ece. Archived from the original on 2023-03-06. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20240115073730/https://timesofindia.indiatimes.com/city/amaravati/jsw-steel-plant-in-kadapa-district-to-be-set-up-at-rs-8800-crore-investment/articleshow/97963819.cms. Archived from the original on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  12. https://web.archive.org/web/20221223203716/https://www.moneycontrol.com/news/business/ap-govt-gives-green-signal-to-jsws-steel-plant-adanis-1600-mw-hydroelectric-energy-storage-project-9693591.html. Archived from the original on 2022-12-23. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 https://web.archive.org/web/20241213070049/https://www.steelorbis.com/steel-news/latest-news/indias-jsw-steel-limited-likely-to-opt-for-eaf-route-for-kadapa-greenfield-project-1288731.htm. Archived from the original on 13 December 2024. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 https://web.archive.org/web/20240911001929/https://www.thehindu.com/news/national/andhra-pradesh/kadapa-steel-plant-remains-an-unrealised-dream-despite-efforts-by-successive-governments/article67597407.ece. Archived from the original on 2024-09-11. {{cite web}}: Missing or empty |title= (help)

Resources