JSW Steel Salem steel plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
JSW Steel Salem steel plant is a steel plant in Pottaneri, M. Kalipatti, Salem, Tamil Nadu, India that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.
Location
The map below shows the exact location of the plant in Pottaneri, M. Kalipatti, Salem, Tamil Nadu, India:
- Location: Pottaneri, M. Kalipatti Village, Salem, Tamil Nadu 636453, India
- Coordinates (WGS 84): 11.814912, 77.918465 (exact)
Background
JSW acquired Salem Steel Works in November 2004.[1] JSW Salem is considered the largest special steel plant in India with a capacity of 1 mtpa.[2]
JSW submitted application for environmental clearance for the expansion of the plant capacity from 1 mtpa to 1.3 mtpa on 07 July, 2017. The company received the environmental clearance from Ministry of Environment , Forest and Climate change on 10 February, 2020. The expansion project involved enhancing existing facilities.[3] As of March 2022, augmentation of blast furnace 2 was completed.[3] Phase 2 expansion involves introducing a third sinter plant and enhancement of blast furnace #1.[4]
Plant Details
Table 1: General Plant Details
Announced date | Construction date | Start date | Workforce size | Power source | Iron ore source | Coal source |
---|---|---|---|---|---|---|
1991[5] | 1996[5] | 1998[6] | 929[7] | 3x 30MW CPP (More than 70% of captive power generation through waste heat)[8][9] | Captive mines in Odisha (unknown what percentage comes from here)[10] | Imported[11] |
Table 2: Ownership and Parent Company Information
State-owned entity status | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Partial | JSW Steel Ltd | 4295872888 | E100001000516 | JSW Steel Ltd[12] | 4295872888 | E100001000516 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment |
---|---|---|---|---|
semi-finished, finished rolled[12] | wire rod, square, bar, coil, flat, hot rolled[13] | automotive, building and infrastructure, energy, steel packaging, tools and machinery, transport[14] | yes[15] | BF; BOF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 1260[6][11] | 1260[6][11] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
operating | 1366[6] | 1366[6] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter | Coke |
---|---|
1235[16][17] | 500[16][17] |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF production | Other/unknown steel production | Total (all routes) |
---|---|---|---|
2020 | –[18] | 820[18] | 820[18] |
2021 | 1092[19] | –[19] | 1092[19] |
2022 | 1124[19] | –[19] | 1124[19] |
2023 | 1159[20] | –[20] | 1159[20] |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | BF production | Other/unknown iron production | Total (all routes) |
---|---|---|---|
2019 | unknown | unknown | – |
2021 | 1048[19] | –[19] | 1048[19] |
2022 | 1048[19] | –[19] | 1048[19] |
2023 | 1257[20] | –[20] | 1257[20] |
Unit Details
Table 9: Blast Furnace Details
Unit name | Status | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|
BF 1 | operating[21] | 1998[6] | 402.0[6] | 683[6] | unknown[22] | – |
BF 2 | operating[21] | 2007[6] | 650.0[6] | 683[6] | unknown[22] | 2022[23] |
Table 10: Basic Oxygen Furnace Details
Unit name | Status | Furnace manufacturer and model | Current capacity (ttpa) | Current size |
---|---|---|---|---|
BOF 1 | operating[6] | EOF[11] | 640[11][6] | 65.0 tonnes[16][24][17] |
BOF 2 | operating[6] | EOF[11] | 620[6] | 65.0 tonnes[16][24][17] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "History JSW Steel India historic profile Vijayanagar Salem". www.steelonthenet.com. Retrieved 2023-10-11.
- ↑ "JSW -Salem Steel Plant - Overview". www.jswsteel.in. Retrieved 2023-10-11.
- ↑ 3.0 3.1 "Half-yearly compliance report for the environmental clearance" (PDF). JSW. 28 June, 2022. Retrieved 11 October, 2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ "EC Compliance Oct 2023 to Mar 2024" (PDF). JSW Steel. 2024-05-29. Retrieved 2025-01-21.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 5.0 5.1 https://www.moneycontrol.com/company-facts/southernironandsteel/history/SIS04.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 (PDF) https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Environmental%20Clearances/JSW_Steel_Salem_ECOctober_21_March_22.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211207143423/https://www.jswsteel.in/about-us. Archived from the original on 2021-12-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210520165529/https://www.jsw.in/steel/salem-works-overview. Archived from the original on 2021-05-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Environmental%20Clearances/JSW-Steel-Salem-works-HYR-EC-Compliance-Oct-to-March-24.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20221030083808/https://www.jsw.in/sites/default/files/assets/industry/steel/IR/Financial%20Performance/Annual%20Reports%20_%20STEEL/JSW%20Steel%20Integrated%20Report%202021-22.pdf. Archived from the original (PDF) on 2022-10-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 (PDF) https://web.archive.org/web/20220126022527/http://environmentclearance.nic.in/writereaddata/modification/previousTOR/15032019HYOW6YL0Annexure-UpdatedForm1letter.pdf. Archived from the original (PDF) on 2022-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20220111143937/https://www.jsw.in/steel/jsw-steel-facilities. Archived from the original on 2022-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20211004131951/https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Financial%20Performance/Annual%20Reports%20Steel/20-21/AR%202020-21.pdf. Archived from the original (PDF) on 2021-10-04.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210521050619/https://www.jsw.in/steel/dolvi-works-overview. Archived from the original on 2021-05-21.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220318090315/https://www.jswsteel.in/search/site/iso14001. Archived from the original on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 (PDF) https://web.archive.org/web/20220126022527/http://environmentclearance.nic.in/writereaddata/modification/previousTOR/15032019HYOW6YL0Annexure-UpdatedForm1letter.pdf. Archived from the original (PDF) on 2022-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 https://web.archive.org/web/20211207143044/https://www.jswsteel.in/salem-works. Archived from the original on 2021-12-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 (PDF) https://web.archive.org/web/20240125061008/https://steel.gov.in/sites/default/files/Annual%20Report-Ministry%20of%20Steel%202020-21.pdf. Archived from the original (PDF) on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.00 19.01 19.02 19.03 19.04 19.05 19.06 19.07 19.08 19.09 19.10 19.11 (PDF) https://web.archive.org/web/20240110023629/https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Environmental%20Clearances/JSW-Steel-Salem-works-Steel-Plant-Envionment-Statement-Report-FY23.pdf. Archived from the original (PDF) on 2024-01-10.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 20.3 20.4 20.5 (PDF) https://www.jswsteel.in/jsw-steel-annual-report-2023-24/JSW-Steel-IR24.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 (PDF) https://www.jswsteel.in/sites/default/files/assets/industry/steel/IR/Environmental%20Clearances/EC_JSW_STEEL_SALEM-slag-grinding-plant-10022020.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 22.0 22.1 https://web.archive.org/web/20240905162729/https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Financial%2520Performance/Annual%2520Reports%2520Steel/jsw-steel-20-21/environment.html. Archived from the original on 2024-09-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Environmental%20Clearances/JSW_Steel_Salem_ECOctober_21_March_22.pdf https://environmentclearance.nic.in/writereaddata/modification/previousTOR/15032019HYOW6YL0Annexure-UpdatedForm1letter.pdf, https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Environmental%20Clearances/JSW_Steel_Salem_ECOctober_21_March_22.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 24.0 24.1 (PDF) https://web.archive.org/web/20221209231936/https://www.jsw.in/sites/default/files/assets/industry/steel/products/special-steel/brochure/JSW%20Salem_22-5-18.pdf. Archived from the original (PDF) on 2022-12-09.
{{cite web}}
: Missing or empty|title=
(help)