JSW Steel Salem steel plant is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Salem, Tamil Nadu, India.

Location

The map below shows the exact location of the plant in Salem, Tamil Nadu, India:

Loading map...
  • Location: Pottaneri, M. Kalipatti Village, Salem, Tamil Nadu 636453, India
  • Coordinates (WGS 84): 11.814912, 77.918465 (exact)

Background

JSW acquired Salem Steel Works in November 2004.[1] JSW Salem is considered the largest special steel plant in India with a capacity of 1 mtpa.[2]

JSW submitted application for environmental clearance for the expansion of the plant capacity from 1 mtpa to 1.3 mtpa on 07 July, 2017. The company received the environmental clearance from Ministry of Environment , Forest and Climate change on 10 February, 2020. The expansion project involved enhancing existing facilities.[3] As of March 2022, augmentation of blast furnace 2 was completed.[3]

Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size Power source Iron ore source
Operating[4] 1998[5] 928[6] More than 70% of captive power generation through waste heat.[7] Captive mines in Odisha (unknown what percentage comes from here)[8]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
JSW Steel Ltd [100%] 4295872888 [100%] E100000001753 [53.2%]; E100001010147 [15%]; E100001010148 [11%]; E100001000520 [7.5%]; E100001000521 [5.9%]; E100001010037 [0.9%]; E100001010033 [0.8%]; E100001010034 [0.7%]; E100001010036 [0.6%]; E100001010035 [0.6%]; E100001001119 [0.6%] JSW Steel Ltd[9] 4295872888 E100001000516

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 Main production equipment Detailed production equipment
semi-finished; finished rolled[9] hot rolled wire coil, hot rolled bar, hot rolled round cornered square, heat treated wire rod coil, heat treated bar, hot rolled flat[10] automotive; building and infrastructure; energy; steel packaging; tools and machinery; transport[11] yes[12] BF, BOF[13][4] coking plant; sinter plant; 2 EOF (1 45-tonne; 1 65-tonne)[13][4]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
operating 1260 TTPA[5][5] 1260 TTPA[5][5]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
operating 1366 TTPA[5][5] 1366 TTPA[5][5]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Coke
2295 TTPA[13][4] 500 TTPA[13][4]

Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year BOF Production EAF Production Total (all routes)
2020 820 TTPA[14]
2021 1092 TTPA[15] 1092 TTPA
2022 1124 TTPA[15] 1124 TTPA

Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year BF Production Total (all routes)
2020
2021 1048 TTPA[15] 1048 TTPA
2022 1048 TTPA[15] 1048 TTPA

Blast Furnace Details

Table 9: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
1 operating[16] unknown unknown 1998[5] 650 m³[5] 683[5] unknown[17] unknown[5][18]
2 operating[16] unknown unknown 2007[5] 650 m³[5] 683[5] unknown[17] 2022[5][18]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "History JSW Steel India historic profile Vijayanagar Salem". www.steelonthenet.com. Retrieved 2023-10-11.
  2. "JSW -Salem Steel Plant - Overview". www.jswsteel.in. Retrieved 2023-10-11.
  3. 3.0 3.1 "Half-yearly compliance report for the environmental clearance" (PDF). JSW. 28 June, 2022. Retrieved 11 October, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  4. 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20211207143044/https://www.jswsteel.in/salem-works. Archived from the original on 07 December 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 (PDF) https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Environmental%20Clearances/JSW_Steel_Salem_ECOctober_21_March_22.pdf. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20211207143423/https://www.jswsteel.in/about-us. Archived from the original on 07 December 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. https://web.archive.org/web/20210520165529/https://www.jsw.in/steel/salem-works-overview. Archived from the original on 20 May 2021. {{cite web}}: Missing or empty |title= (help)
  8. (PDF) https://web.archive.org/web/20221030083808/https://www.jsw.in/sites/default/files/assets/industry/steel/IR/Financial%20Performance/Annual%20Reports%20_%20STEEL/JSW%20Steel%20Integrated%20Report%202021-22.pdf. Archived from the original (PDF) on 30 October 2022. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20220111143937/https://www.jsw.in/steel/jsw-steel-facilities. Archived from the original on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  10. (PDF) https://web.archive.org/web/20211004131951/https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Financial%20Performance/Annual%20Reports%20Steel/20-21/AR%202020-21.pdf. Archived from the original (PDF) on 04 October 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  11. https://web.archive.org/web/20210521050619/https://www.jsw.in/steel/dolvi-works-overview. Archived from the original on 21 May 2021. {{cite web}}: Missing or empty |title= (help)
  12. https://web.archive.org/web/20220318090315/https://www.jswsteel.in/search/site/iso14001. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 (PDF) https://web.archive.org/web/20220126022527/http://environmentclearance.nic.in/writereaddata/modification/previousTOR/15032019HYOW6YL0Annexure-UpdatedForm1letter.pdf. Archived from the original (PDF) on 26 January 2022. {{cite web}}: Missing or empty |title= (help)
  14. (PDF) https://web.archive.org/web/20240125061008/https://steel.gov.in/sites/default/files/Annual%20Report-Ministry%20of%20Steel%202020-21.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 (PDF) https://web.archive.org/web/20240110023629/https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Environmental%20Clearances/JSW-Steel-Salem-works-Steel-Plant-Envionment-Statement-Report-FY23.pdf. Archived from the original (PDF) on 10 January 2024. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 (PDF) https://www.jswsteel.in/sites/default/files/assets/industry/steel/IR/Environmental%20Clearances/EC_JSW_STEEL_SALEM-slag-grinding-plant-10022020.pdf. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Financial%20Performance/Annual%20Reports%20Steel/jsw-steel-20-21/environment.html. {{cite web}}: Missing or empty |title= (help)
  18. 18.0 18.1 (PDF) https://web.archive.org/web/20220126022527/http://environmentclearance.nic.in/writereaddata/modification/previousTOR/15032019HYOW6YL0Annexure-UpdatedForm1letter.pdf. Archived from the original (PDF) on 26 January 2022. {{cite web}}: Missing or empty |title= (help)

Resources