Jai Balaji Durgapur steel plant, also known as JBG Durgapur, is a blast furnace (BF), direct reduced iron (DRI) and electric arc furnace (EAF) steel plant operating in Durgapur, West Bengal, India.

Location

The map below shows the exact location of the plant in Durgapur, West Bengal, India:

Loading map...
  • Location: Vill – Banskopa, P.O – Rajbandh Durgapur – 713212, Burdwan, India
  • Coordinates (WGS 84): 23.487077, 87.369565 (exact)

Background

In October 2007, the West Bengal Government signed a memoranda of agreement (MoA) with Videocon Industries and Jai Balaji Industries for the setting up a three mtpa integrated steel plant and a 1,200 MW power plant in the Asansol-Durgapur region of Burdwan, with a total investment of around INR 15,000 crore.[1] The plant was inaugurated in February 2009.[2]

Plant Details

Table 1: General Plant Details

Plant status Announced date Start date Workforce size
Operating[3] 2007-10[4] 2009[5] 1653[6]

Table 2: Ownership and Parent Company Information

Owner Owner company PermID Owner company GEM ID
Jai Balaji Industries Ltd[3] 4295873993 E100000130703

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
crude; semi-finished; finished rolled[7] pig iron; billets; rounds; TMT bars; ductile iron pipes[7] BF, DRI, EAF, other[7] 2 BF; 1 EAF (60 tonne); 4 IF (25 ton each); 2 DRI (350 tpd, 500 tpd) [7][8][9][10][11]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 450 TTPA[12] 780 TTPA[12]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
operating 612 TTPA[12][12] 280 TTPA[13][13] 893 TTPA[12][12][13][13]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
40 TTPA[12] 1208 TTPA[12] >0 TTPA[7] 600 TTPA[13]

Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year EAF Production Total (all routes)
2020
2021 134 TTPA[14] 232 TTPA[14]
2022 202 TTPA[15] 350 TTPA[15]

Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year BF Production DRI Production Total (all routes)
2020 363 TTPA[16] 363 TTPA
2021 438 TTPA[14] 151 TTPA[14] 589 TTPA
2022 481 TTPA[15] 177 TTPA[15] 658 TTPA

Blast Furnace Details

Table 9: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown operating[12][17] unknown unknown 2009[5] 300 m³[12] 306[12] unknown unknown[10]
unknown operating[12][17] unknown unknown 2009[5] 300 m³[12][10] 306[12] unknown unknown[10]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "West Bengal signs pact with Videocon, Jai Balaji Industries". www.projectstoday.com. Retrieved 2023-12-29.
  2. TwoCircles.net (2009-02-21). "Jai Balaji's integrated steel plant at Durgapur inaugurated". TwoCircles.net. Retrieved 2023-12-29.
  3. 3.0 3.1 https://web.archive.org/web/20240125054811/https://jaibalajigroup.com/corporate-profile/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240111015828/https://www.projectstoday.com/News/West-Bengal-signs-pact-with-Videocon-Jai-Balaji-Industries. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://twocircles.net/2009feb21/jai_balajis_integrated_steel_plant_durgapur_inaugurated.html. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) https://web.archive.org/web/20240111033540/https://www.wbpcb.gov.in/files/Fr-06-2021-06-55-10EX_SUM_JaiBalaji_050321.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 https://web.archive.org/web/20220120003753/https://jaibalajigroup.com/pig-iron/. Archived from the original on 20 January 2022. {{cite web}}: Missing or empty |title= (help)
  8. https://docplayer.net/147227943-Jai-balaji-industries-limited-unit-i-pre-feasibility-report.html. {{cite web}}: Missing or empty |title= (help)
  9. (PDF) http://www.cmlinks.com/pub/dp/dp26454.pdf. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 https://web.archive.org/web/20240111042327/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=AUWfsWVkGHDO%2FgyF+w%2FaUzq1Cf8RFAfmvjCtpTecM6ptUqW3pgWhj9qEF0P%2FZyhvI5OXEIv0NPOxZNHrEgH8PpuzbxAl%2FFOIE7xz4t0+LvRkHctT2Ii%2FLVJfymPzM+uK6viO3WPV81uGb6onBdrtd5hqZHChTHz3OPdvKgWKZ++cl4TrxyKXhdVFU1ucCWq%2F&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%2FpgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  11. (PDF) https://web.archive.org/web/20240131193311/https://csestore.cse.org.in/pub/media/catalog/product/file/file_4_17_1.pdf. Archived from the original (PDF) on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  12. 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 (PDF) http://environmentclearance.nic.in/writereaddata/Online/TOR/15_Dec_2018_175637223TV0QDRPWFORM-I.pdf. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 (PDF) https://www.wbpcb.gov.in/files/Fr-06-2021-06-56-13FORM_1_JaiBalaji_050321.pdf. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 (PDF) https://web.archive.org/web/20221004203054/https://jaibalajigroup.com/wp-content/uploads/2022/09/Annual-Report-2021-22.pdf. Archived from the original (PDF) on 04 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 (PDF) https://web.archive.org/web/20240111061848/https://jaibalajigroup.com/wp-content/uploads/2023/08/24th-Annual-Report-2022-23.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  16. (PDF) https://web.archive.org/web/20240125061827/https://www.jaibalajigroup.com/wp-content/uploads/2021/09/annual-report-2020-21.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 https://web.archive.org/web/20220811172603/https://jaibalajigroup.com/pig-iron/. Archived from the original on 11 August 2022. {{cite web}}: Missing or empty |title= (help)

Resources