Jiangsu Binxin Steel Group Co Ltd

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Jiangsu Binxin Steel Group Co Ltd (江苏省镔鑫特钢材料有限公司, 江苏省镔鑫钢铁集团有限公司), also known as Jiangsu Binxin Special Steel Material Co., Ltd., is a steel plant in Lianyungang, Jiangsu, China that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.

Location

The map below shows the exact location of the plant in Lianyungang, Jiangsu, China:

Loading map...
  • Location: Xiangshi Village, Zhewang Town, Lingang Industrial Zone, Ganyu District, Lianyungang City, Jiangsu Province
  • Coordinates (WGS 84): 35.09556, 119.279989 (exact)

Background

The company announced to build of a blast furnace (1250m3) in June 2019.[1]

Jiangsu Binxin Steel Group Co., Ltd. has repeatedly started construction and production without obtaining legally required approvals for the environmental impact assessment reports of their construction projects. In April 2023[2] and November 2020, the company was fined millions of yuan for these violations. Additionally, the company received two penalties from the Gan Yu District Ecological Environment Bureau in 2019 for environmental violations.[3]

Plant Details

Table 1: General Plant Details

Start date Workforce size
2008-02-02[4] 3921[4]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Lianyungang Ganyu Zhongcheng Investment Co Ltd [87.4%]; natural person(s) [12.6%] unknown [87.4%]; not applicable [12.6%] E100000124040 [87.4%]; E100000123261 [12.6%] Jiangsu Province Binxin Steel Group Co Ltd [100%][5] unknown E100000123179 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
semi-finished, finished rolled[6] wire rod, rebar, bar, billet, round bar, special[6] building and infrastructure, tools and machinery[7] 2022-06-02[7] 2021-12-16[7] unknown BF; BOF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
operating 2250[8] 2250[8]
retired 2250[8] 2250[8]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
construction 1150[9] 1150[9]
operating 2150[8][10] 2150[8][10]
retired 3000[8] 3000[8]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF NF NF NF

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year BOF production Other/unknown steel production
2019 unknown unknown
2020 unknown[11] unknown[11]
2021 unknown[11] unknown[11]
2022 unknown unknown
2023 unknown unknown

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production DRI production Other/unknown iron production
2019 unknown unknown unknown
2020 unknown[11] [11] unknown[11]
2021 unknown[11] [11] unknown[11]
2022 unknown unknown
2023 unknown unknown

Unit Details

Table 9: Blast Furnace Details

Unit name Status Announced date Construction date Start date Retired date Current size Current capacity (ttpa) Decarbonization technology
BF 5 retired[12] 2014[13] 2023-08-24[12] 1080.0 m3[14] 1000[8] unknown
BF 6 retired[13] 2015[13] 2023-11-24[13] 1080.0 m3[15] 1000[8] unknown
unknown BF (1) operating[15] 1080.0 m3[15] 1000[8] unknown
unknown BF (2) operating[16] 2019-06[10] 2020-04[17] 2021[18] 1250.0 m3[10] 1150[10] unknown
unknown BF (3) construction[12] 2023-06[9] 2023-08-24[12] 1250.0 m3[9] 1150[9] unknown
unknown BF (4) retired[12] 2019-09[13] 2019[13] 2023-08-24[12] 1080.0 m3[14] 1000[8] unknown

Table 10: Basic Oxygen Furnace Details

Unit name Status Start date Current capacity (ttpa) Current size
BOF 1 operating[5] 1125[8] 120.0 tonnes[14][15]
BOF 2 operating[5] 1125[8] 120.0 tonnes[14][15]
BOF 3 retired[13] 2014[13] 1125[8] 120.0 tonnes[14][15]
BOF 4 retired[13] 2015[13] 1125[8] 120.0 tonnes[14][15]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. mysteel (2019-6-20). "关于江苏省镔鑫钢铁集团有限公司炼铁建设项目产能置换方案的公告-我的钢铁网". news.mysteel.com. Retrieved 2023-01-03. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  2. "连云港市生态环境局行政处罚决定书连赣环行罚〔2023〕24号". 2023-05-31.{{cite web}}: CS1 maint: url-status (link)
  3. "近千万罚单开出!连云港赣榆一钢铁企业项目未批先建涉环境违法". 2020-12-04.
  4. 4.0 4.1 https://www.gongsi.com.cn/detail/7ec74bff-15bb-35be-9589-29bfe25350161. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://www.qcc.com/firm/d12c4adc2567b82a502cb416aa25299e.html. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20180825235412/http://jsbxgt.com/plus/list.php?tid=2. Archived from the original on 2018-08-25. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://web.archive.org/web/20240119060632/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E6%B1%9F%E8%8B%8F%E7%9C%81%E9%95%94%E9%91%AB%E9%92%A2%E9%93%81%E9%9B%86%E5%9B%A2%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  8. 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 http://www.lyg.gov.cn/zglygzfmhwz/wryjg/content/dcd15ba4-b8d3-493a-b701-a11900b16d6a.html. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 https://huanbao.bjx.com.cn/news/20230614/1312766.shtml. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 https://news.mysteel.com/19/0620/11/1F8B15AA46B37812.html. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9 https://web.archive.org/web/20231214144156/https://www.chyxx.com/shuju/202107/965043.html. Archived from the original on 2023-12-14. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 12.4 12.5 https://web.archive.org/web/20240906180523/http://www.ganyu.gov.cn/gyqjjhxxhj/zfwj/content/abf500bf-b440-4bca-a289-0aae29b03bd6.html. Archived from the original on 2024-09-06. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8 13.9 https://web.archive.org/web/20240115051819/https://www.lyg.gov.cn/zglygzfmhwz/wrfz/content/594dc8dc-ba74-4002-9226-c3f651fe5e59.html. Archived from the original on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 "全国规范钢铁企业拟增至263家(附全名单及其装备)". finance.sina.com.cn. 2020-03-02. Archived from the original on 2022-02-07. Retrieved 2024-11-19.
  15. 15.0 15.1 15.2 15.3 15.4 15.5 15.6 https://web.archive.org/web/20161021111636/http://ccen.info/company/lianyungangshi/ganyuxian/2015/0619/2564.html. Archived from the original on 2016-10-21. {{cite web}}: Missing or empty |title= (help)
  16. (PDF) http://Jiangsu.china.com.cn/html/yq/jsyq/10792675_1.html;http://fzggw.Jiangsu.gov.cn/attach/-1/2103261840229007460.pdf. {{cite web}}: Missing or empty |title= (help)
  17. http://jiangsu.china.com.cn/html/yq/jsyq/10792675_1.html. {{cite web}}: Missing or empty |title= (help)
  18. http://hbj.lyg.gov.cn/lygshbj/lygsgysthjj1/content/ccf3762f-efa6-412a-b3e4-08fff1307653.html. {{cite web}}: Missing or empty |title= (help)

Resources