Jilin Steel Group Fugang Metal Manufacturing Co Ltd
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Jilin Steel Group Fugang Metal Manufacturing Co Ltd (吉林吉钢钢铁集团福钢金属制造有限公司) is an electric arc furnace (EAF) steel plant operating in Changchun, Jilin, China.
Location
The map below shows the exact location of the plant in Changchun, Jilin, China:
- Location: Jiutai District, Changchun City, Jilin Province
- Coordinates (WGS 84): 44.022802, 125.505627 (exact)
Background
According to the announcement of the production capacity replacement plan, the company plans to build two 70-ton Consti electric furnaces, which is planned to be put into operation in 2024 and eliminate the existing three 70-ton electric furnaces.[1]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Start date | Pre-retirement announcement date | Retired date | Workforce size |
---|---|---|---|---|---|---|
Main plant | Operating[2] | – | 2008[2] | – | –[3] | 98[4] |
Closure | Operating pre-retirement[5] | – | – | 2023-07-06[5] | 2025[5] | – |
Expansion | Announced[5] | 2023-07[5] | – | – | – | – |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | Jilinjigang Steel Group Co Ltd [51.0%]; persons [49.0%] | E100000123261 [100%] | Jilin Steel Group Fugang Metal Manufacturing Co.ltd[2] | E100000126497 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
Main plant | finished rolled[2] | rebar[2] | building and infrastructure; tools and machinery; transport[4] | EAF[3] | 3 EAF (3x70-tonne)[3] |
Closure | finished rolled[2] | rebar[2] | building and infrastructure; tools and machinery; transport[4] | EAF[5] | 3 EAF (3x70-tonne)[5] |
Expansion | finished rolled[2] | rebar[2] | – | EAF[5] | 1 EAF (1x50-tonne)[5] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Closure | operating pre-retirement | 1500 TTPA[3][3][3] | 1500 TTPA[3][3][3] |
Expansion | announced | 360 TTPA[5] | 360 TTPA[5] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* |
---|---|
Main plant | operating |
Closure | operating pre-retirement |
Expansion | announced |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 吉林吉钢钢铁集团福钢金属制造有限公司原厂区升级改造产能置换方案公告,吉林省工业和信息化厅,January 21, 2022
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20220318100400/https://www.qcc.com/weblogin?back. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 https://m.mysteel.com/22/0121/11/6CE01E4A17441E58_abc.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240119064400/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%90%89%E6%9E%97%E5%90%89%E9%92%A2%E9%92%A2%E9%93%81%E9%9B%86%E5%9B%A2%E7%A6%8F%E9%92%A2%E9%87%91%E5%B1%9E%E5%88%B6%E9%80%A0%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 https://finance.sina.cn/futuremarket/gypzx/2023-07-06/detail-imyztiir2247626.d.html.
{{cite web}}
: Missing or empty|title=
(help)