Jilin Steel Group Fugang Metal Manufacturing Co Ltd (吉林吉钢钢铁集团福钢金属制造有限公司) is an electric arc furnace (EAF) steel plant operating in Changchun, Jilin, China.

Location

The map below shows the exact location of the plant in Changchun, Jilin, China:

Loading map...
  • Location: Jiutai District, Changchun City, Jilin Province
  • Coordinates (WGS 84): 44.022802, 125.505627 (exact)

Background

According to the announcement of the production capacity replacement plan, the company plans to build two 70-ton Consti electric furnaces, which is planned to be put into operation in 2024 and eliminate the existing three 70-ton electric furnaces.[1]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Start date Pre-retirement announcement date Retired date Workforce size
Main plant Operating[2] 2008[2] [3] 98[4]
Closure Operating pre-retirement[5] 2023-07-06[5] 2025[5]
Expansion Announced[5] 2023-07[5]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company GEM ID
Main plant Jilinjigang Steel Group Co Ltd [51.0%]; persons [49.0%] E100000123261 [100%] Jilin Steel Group Fugang Metal Manufacturing Co.ltd[2] E100000126497

Table 3: Process and Products

Phase Steel product category Steel products Steel sector end users Main production equipment Detailed production equipment
Main plant finished rolled[2] rebar[2] building and infrastructure; tools and machinery; transport[4] EAF[3] 3 EAF (3x70-tonne)[3]
Closure finished rolled[2] rebar[2] building and infrastructure; tools and machinery; transport[4] EAF[5] 3 EAF (3x70-tonne)[5]
Expansion finished rolled[2] rebar[2] EAF[5] 1 EAF (1x50-tonne)[5]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating
Closure operating pre-retirement 1500 TTPA[3][3][3] 1500 TTPA[3][3][3]
Expansion announced 360 TTPA[5] 360 TTPA[5]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status*
Main plant operating
Closure operating pre-retirement
Expansion announced

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 吉林吉钢钢铁集团福钢金属制造有限公司原厂区升级改造产能置换方案公告,吉林省工业和信息化厅,January 21, 2022
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20220318100400/https://www.qcc.com/weblogin?back. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 https://m.mysteel.com/22/0121/11/6CE01E4A17441E58_abc.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20240119064400/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%90%89%E6%9E%97%E5%90%89%E9%92%A2%E9%92%A2%E9%93%81%E9%9B%86%E5%9B%A2%E7%A6%8F%E9%92%A2%E9%87%91%E5%B1%9E%E5%88%B6%E9%80%A0%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 https://finance.sina.cn/futuremarket/gypzx/2023-07-06/detail-imyztiir2247626.d.html. {{cite web}}: Missing or empty |title= (help)

Resources