Jilin Steel Group Taihua Metal Equipment Manufacture Co Ltd

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Jilin Steel Group Taihua Metal Equipment Manufacture Co Ltd (吉林吉钢钢铁集团泰华冶金设备制造有限公司), also known as Jilin Jigang Huaying Heavy Industry Technology Development Co., Ltd., is an electric arc furnace (EAF) steel plant operating in Changchun, Jilin, China.

Location

The map below shows the exact location of the plant in Changchun, Jilin, China:

Loading map...
  • Location: Zone B, Industrial Concentration Zone, Jiutai City, Changchun City, Jilin Province
  • Coordinates (WGS 84): 44.138826, 125.914941 (exact)

Background

According to the announcement of the production capacity replacement plan, the company plans to build a 70-ton Consti electric furnace, which is planned to be put into operation in 2024 and eliminate the existing 70-ton electric furnace.[1]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Start date Pre-retirement announcement date
Main plant Operating[2] 2008[2]
Closure Operating pre-retirement[3] 2022-01[4]
Expansion Announced[3] 2022-01[4] 2024[4]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company GEM ID
Main plant Jilinjigang Steel Group Co Ltd [98.8%]; other [1.2%] E100000123261 [98.8%]; E100000001753 [1.2%] Jilin Steel Group Taihua Metal Equipment Manufacture Co., Ltd.[2] E100000127275

Table 3: Process and Products

Phase Steel product category Steel products Main production equipment Detailed production equipment
Main plant finished rolled[2] rebar[2] EAF[5] 1 EAF (1x70-tonne)[5]
Closure finished rolled[2] rebar[2] EAF[5] 1 EAF (1x70-tonne)[3]
Expansion finished rolled[2] rebar[2] EAF[5] 1 EAF (1x70-tonne)[3]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating
Closure operating pre-retirement 500 TTPA[3] 500 TTPA[3]
Expansion announced 500 TTPA[3] 500 TTPA[3]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status*
Main plant operating
Closure operating pre-retirement
Expansion announced

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 吉林吉钢钢铁集团泰华冶金设备制造有限公司原厂区升级改造产能置换方案公告,吉林省工业和信息化厅,2022-1-21
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20220318081008/https://www.qcc.com/firm/49a882c6f3f28a6717263d6f60f04780.html. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://web.archive.org/web/20240309062404/https://baijiahao.baidu.com/s?id=1720003419717956990&wfr=spider&for=pc. Archived from the original on 09 March 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://finance.sina.cn/futuremarket/gypzx/2022-01-21/detail-ikyakumy1724797.d.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://web.archive.org/web/20220319191644/http://gxt.jl.gov.cn/xxgk/jwwj/202112/t20211223_8340764.html. Archived from the original on 19 March 2022. {{cite web}}: Missing or empty |title= (help)

Resources