Jilin Xinda Iron and Steel Co Ltd
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Jilin Xinda Iron and Steel Co Ltd (吉林鑫达钢铁有限公司) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Liaoyuan, Jilin, China.
Location
The map below shows the exact location of the plant in Liaoyuan, Jilin, China:
- Location: Heping Town, Dongfeng County, Liaoyuan City, Jilin Province
- Coordinates (WGS 84): 42.3249, 125.246892 (exact)
Background
According to the announcement of the capacity replacement plan in September 2022, the company planned to build a 100-ton basic oxygen furnace to replace two 60-ton basic oxygen furnaces.[1]
According to the announcement of the capacity replacement plan in November 2022, the company planned to build a 1350m3 blast furnace to replace a 480m3 blast furnace.[2]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Start date | Pre-retirement announcement date | Workforce size |
---|---|---|---|---|---|
Main plant | Operating[3] | – | 2007[4] | – | 2300[5] |
Expansion | Announced[6] | 2022-09-26[6][7][8] | 2024[6] | – | – |
Closure | Operating pre-retirement[6] | – | – | 2022-09-26[6][7][8] | – |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | Hengjin Huitong Asset Management (Beijing) Co Ltd [60.0%]; persons [18.7%]; Jilin Tianpeng Industrial Co Ltd [17.2%]; other [4.1%] | E100000123261 [95.9%]; E100000001753 [4.1%] | Jilin Xinda Iron and Steel Co., Ltd.[3] | E100000123181 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|---|
Main plant | finished rolled[4] | hot-rolled H-beam and ordinary hot-rolled steel bars for reinforced concrete, hot-rolled smooth round steel bars for reinforced concrete, etc.[4] | automotive; building and infrastructure; energy; tools and machinery[5] | 2022[5] | 2022[5] | BF, BOF[9] | 3 BOF (3x65-tonne)[9] |
Expansion | finished rolled[4] | hot-rolled H-beam and ordinary hot-rolled steel bars for reinforced concrete, hot-rolled smooth round steel bars for reinforced concrete, etc.[4] | automotive; building and infrastructure; energy; tools and machinery[5] | – | – | BF, BOF[6] | 2 BOF (2x100-tonne)[6] |
Closure | finished rolled[4] | hot-rolled H-beam and ordinary hot-rolled steel bars for reinforced concrete, hot-rolled smooth round steel bars for reinforced concrete, etc.[4] | automotive; building and infrastructure; energy; tools and machinery[5] | – | – | BF, BOF[6] | 3 BOF (3x65-tonne)[6] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Expansion | announced | 2300 TTPA[7][8] | 2300 TTPA[7][8] |
Closure | operating pre-retirement | 3300 TTPA[7][8][8] | 3300 TTPA[7][8][8] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 2112 TTPA[10][6] | 2112 TTPA[10][6] |
Expansion | announced | 1220 TTPA[6] | 1220 TTPA[6] |
Closure | operating pre-retirement | 588 TTPA[6] | 588 TTPA[6] |
Blast Furnace Details
Table 6: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Retired date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
unknown | operating pre-retirement[9] | unknown | unknown | unknown | unknown | 480 m³[9] | 588[6] | unknown | 2022-06-27[11] |
unknown | announced[6] | 2022-11-10[6] | unknown | 2024-06-01 00:00:00[6] | 2024[6] | 1350 m³[6] | 1220[6] | unknown | unknown |
unknown | operating[9] | unknown | unknown | unknown | – | 450 m³[9] | 952[10] | unknown | unknown |
unknown | operating[9] | unknown | unknown | unknown | – | 1260 m³[9] | 1160[6] | unknown | 2023-06[6] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "吉林鑫达钢铁炼钢产能置换方案(一期)公告-我的钢铁网". m.mysteel.com (in 中文(中国大陆)). 2022-9-26. Retrieved 2022-10-06.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link) - ↑ "吉林鑫达钢铁炼铁产能置换方案(一期)公告“,吉林省工信厅,2022-11-10
- ↑ 3.0 3.1 https://www.qcc.com/firm/2c6bfda4b621aff8d219bd6a17b7c22b.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 https://web.archive.org/web/20220113225957/http://www.xdgro.com/list_info_29_147.html. Archived from the original on 13 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20240119061119/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%90%89%E6%9E%97%E9%91%AB%E8%BE%BE%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 6.22 6.23 https://m.mysteel.com/22/1110/10/CFAA16B50F1A8A6F_abc.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 https://m.mysteel.com/22/0927/10/AA2FA6189C0982DA_abc.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 https://web.archive.org/web/20240110011355/http://gxt.jl.gov.cn/xxgk/jwwj/202303/t20230326_8684475.html. Archived from the original on 10 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 https://web.archive.org/web/20220110221231/https://www.qcc.com/firm/2c6bfda4b621aff8d219bd6a17b7c22b.html. Archived from the original on 10 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://factory.mysteel.com/22/0629/10/7B8ED1918FC47865.html.
{{cite web}}
: Missing or empty|title=
(help)