Jinan Iron and Steel Group Co Ltd

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Jinan Iron and Steel Group Co Ltd (冀南钢铁集团有限公司) is a steel plant in Handan, Hebei, China that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.

Location

The map below shows the exact location of the plant in Handan, Hebei, China:

Loading map...
  • Location: Chongyi Village, Wu'an, Handan City, Hebei Province
  • Coordinates (WGS 84): 36.718952, 114.111677 (exact)

Background

In 2017, the company started phase 1, which is to build two BF (1,260m3) and two BOF(110-ton).[1][2] Phase 1 had been completed in 2022.[3]

In 2021, the company announced to build 5 BF(1x1280m3,4x1300m3)and 2 BOF (2x110-tonne) in project phase 2.[4]Construction began in late 2023.[5]

Plant Details

Table 1: General Plant Details

Start date Workforce size
2022[6] 1379[7]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Jinan Iron & Steel Group Co Ltd [100.0%] unknown [100.0%] E100000126505 [100.0%] Jinan Iron & Steel Group Co Ltd [100%][7] unknown E100000126505 [100%]

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Responsible steel Main production equipment
semi-finished, finished rolled[8] billet, structural, plate[8] 2023-01-17[8] 2023-01-17[8] unknown BF; BOF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
construction 2500[9] 2500[9]
operating 2700[10] 2700[10]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
construction 5948[9] 5948[9]
operating 2320[10] 2320[10]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF NF NF NF

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year BOF production Other/unknown steel production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production Other/unknown iron production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown

Unit Details

Table 9: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology
BF #1 operating[6] 2022[6] 1260.0 m3[10] 1160[10] Automatic Combustion of Blast Furnace Hot Blast Stove[11]
BF #2 operating[6] 2022[6] 1260.0 m3[10] 1160[10] Automatic Combustion of Blast Furnace Hot Blast Stove[11]
unknown BF (1) construction[12][13] 2021-12[9] 2023-10[12] 1280.0 m3[13] 1180[9] unknown
unknown BF (2) construction[14][13] 2021-12[9] 2023[15] 1300.0 m3[13] 1192[9] unknown
unknown BF (3) construction[14][13] 2021-12[9] 2023[15] 1300.0 m3[13] 1192[9] unknown
unknown BF (4) construction[14][13] 2021-12[9] 2023[15] 1300.0 m3[13] 1192[9] unknown
unknown BF (5) construction[12][13] 2021-12[9] 2023[12] 1300.0 m3[13] 1192[9] unknown

Table 10: Basic Oxygen Furnace Details

Unit name Status Announced date Construction date Start date Current capacity (ttpa) Current size
unknown BOF (1) operating[6] 2022[6] 1350[10] 110.0 tonnes[10]
unknown BOF (2) operating[6] 2022[6] 1350[10] 110.0 tonnes[10]
unknown BOF (3) construction[14] 2021-12[9] 2023[15] 1250[9] 110.0 tonnes[9]
unknown BOF (4) construction[14] 2021-12[9] 2023[15] 1250[9] 110.0 tonnes[9]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 冀南钢铁这样进行产能置换!拟新建2座1260立方米高炉,还将新建... ,搜狐网,2017-11-23
  2. 冀南钢铁集团升级改造项目开工,中国钢结构咨询网,September 12, 2017
  3. "邯郸钢铁企业由35家整合为9家!焦化行业由23家整合为14家!冀南钢铁一期、太行钢铁一期、永洋特钢、华信特钢4个项目完成搬迁!". 搜狐. 2023-02-22.
  4. 冀南钢铁集团有限公司二期钢铁产能减量置换升级改造项目产能置换方案公告,河北省工业和信息化厅,December 23, 2021
  5. "总投资60亿!潞城区冀南钢铁项目开工". 搜狐. 2023-10-01.
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 https://www.sohu.com/a/644741787_121123911. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20220110210711/https://www.qcc.com/firm/68a96825884e0f492a3f5320f4736337.html. Archived from the original on 10 January 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 https://web.archive.org/web/20231003175817/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%86%80%E5%8D%97%E9%92%A2%E9%93%81%E9%9B%86%E5%9B%A2&fromIndex=true. Archived from the original on 2023-10-03. {{cite web}}: Missing or empty |title= (help)
  9. 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 9.12 9.13 9.14 9.15 9.16 9.17 9.18 9.19 https://m.mysteel.com/21/1223/10/D458A73D3E94D2E2_abc.html. {{cite web}}: Missing or empty |title= (help)
  10. 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 https://web.archive.org/web/20220318084346/https://www.sohu.com/a/206262542_99913579. Archived from the original on 2022-03-18. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20240911002138/https://wappass.baidu.com/static/captcha/tuxing.html?ak=572be823e2f50ea759a616c060d6b9f1&backurl=https%253A%252F%252Fmbd.baidu.com%252Fnewspage%252Fdata%252Flandingsuper%253Fid%253D1744629087679705451%2526wfr%253Dspider%2526for%253Dpc%2526third%253Dbaijiahao%2526baijiahao_id%253D1744629087679705451%2526c_source%253Dkunlun%2526c_score%253D0.999000&timestamp=1726014098&signature=67cf566d054fad7eace8e8223393bdc3. Archived from the original on 2024-09-11. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 https://web.archive.org/web/20241204012020/https://cz.sxgov.cn/content/2023-10/01/content_13085221.htm. Archived from the original on 2024-12-04. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8 13.9 http://gxt.hebei.gov.cn/hbgyhxxht/xwzx32/tzgg83/891793/index.html. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 https://web.archive.org/web/20230918151528/https://www.sohu.com/a/700768006_121123751. Archived from the original on 2023-09-18. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 15.4 https://web.archive.org/web/20240911001706/https://roll.sohu.com/a/700768006_121123751. Archived from the original on 2024-09-11. {{cite web}}: Missing or empty |title= (help)

Resources