Kalanga Complex
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Kalanga Complex is a complex of operating hydroelectric power plants in Nepal.
The complex consists of the following projects:
Complex Details
Table 1: Project-level details for Kalanga Complex
Project name | Status | Commissioning year | Nameplate capacity | Technology type | Owner |
---|---|---|---|---|---|
Kalanga hydroelectric plant | operating[1] | 2023[1] | 15.0 MW[2] | Run-of-river[3] | – |
Upper Kalangad hydroelectric plant | operating[4] | 2023[1] | 38.0 MW[4] | Run-of-river[5] | Sanigad Hydro Private Ltd [100%][5] |
Location
Table 2: Location details for Kalanga Complex
Project name | Location | River | Coordinates (WGS 84) |
---|---|---|---|
Kalanga hydroelectric plant | Banjh Village, Bajhang District, Seti Zone, Sudurpashchim Province, Nepal[6][7] | Kalanga Nadi River[3] | 29.5117, 80.8764 (exact)[6][7] |
Upper Kalangad hydroelectric plant | Bungal Municipality, Bajhang District, Bajhang District, Sudurpashchim Province, Nepal[6] | Kalanga Gad River[5] | 29.6093, 80.9153 (approximate)[6] |
The map below shows the approximate locations of the projects in the complex:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20240109002330/https://english.onlinekhabar.com/new-hydropower-projects-500-mw.html. Archived from the original on 2024-01-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221007181424/http://www.nepalenergyforum.com/90-percent-work-of-kalanga-hydropower-project-completed/. Archived from the original on 2022-10-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20220331104322/https://nwrmap.info/hydropower/kalanga. Archived from the original on 2022-03-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20230302183227/https://www.investopaper.com/news/hydropower-projects-with-construction-license/. Archived from the original on 2023-03-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20200211180205/http://www.sunaminfra.com.np:80/web/upper-kalanga-gad-hydroelectric-project-38-4-mw/. Archived from the original on 2020-02-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20221206083000/https://hydro.naxa.com.np/core/datasets/. Archived from the original on 2022-12-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20240109010201/https://www.google.com/maps/place/Kalanga+Gad+hydro/@29.511599,80.8768458,181m/data=!3m1!1e3!4m6!3m5!1s0x39a3e19dc369f60b:0xb601c19360ae1c6b!8m2!3d29.5117132!4d80.876257!16s%2Fg%2F11ft5hcr3_?entry=tts. Archived from the original on 2024-01-09.
{{cite web}}
: Missing or empty|title=
(help)