Upper Kalangad hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Other names: Upper Kalanga Gad

Upper Kalangad hydroelectric plant is an operating hydroelectric power plant in Bungal Municipality, Bajhang District, Sudurpashchim Province, Nepal.

Project Details

Table 1: Project details for Upper Kalangad hydroelectric plant

Status Commissioning year Nameplate capacity Technology type Owner
Operating[1] 2023[2] 38 MW[1] Run-of-river[3] Sanigad Hydro Private Ltd [100%][3]

Location

Table 2: Location details for Upper Kalangad hydroelectric plant

Location River Complex Coordinates (WGS 84)
Bungal Municipality, Bajhang District, Bajhang District, Sudurpashchim Province, Nepal[4] Kalanga Gad River[3] Kalanga Complex[5] 29.6093, 80.9153 (approximate)[4]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20230302183227/https://www.investopaper.com/news/hydropower-projects-with-construction-license/. Archived from the original on 2023-03-02. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240109002330/https://english.onlinekhabar.com/new-hydropower-projects-500-mw.html. Archived from the original on 2024-01-09. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20200211180205/http://www.sunaminfra.com.np:80/web/upper-kalanga-gad-hydroelectric-project-38-4-mw/. Archived from the original on 2020-02-11. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20221206083000/https://hydro.naxa.com.np/core/datasets/. Archived from the original on 2022-12-06. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20221007181424/http://www.nepalenergyforum.com/90-percent-work-of-kalanga-hydropower-project-completed/. Archived from the original on 2022-10-07. {{cite web}}: Missing or empty |title= (help)