Kehler Baden Steel Works (Badische Stahlwerke (German)), also known as BSW, Süddeutsche Drahtververarbeitung-GmbH (predecessor), is an electric arc furnace (EAF) steel plant operating in Kehl am Rhein, Baden-Württemberg, Germany.
Location
The map below shows the exact location of the plant in Kehl am Rhein, Baden-Württemberg, Germany:
- Location: Graudenzer Strasse 45, 77694 Kehl am Rhein, Germany
- Coordinates (WGS 84): 48.595058, 7.821633 (exact)
Background
Steel production at Kehler Baden Steel Works is scrap-based.[1]
Plant Details
Table 1: General Plant Details
Plant status | Start date | Workforce size |
---|---|---|
Operating[2] | 1955[2] | 850[3] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|
Kehler Group Sweden AB [100.0%] | E100000131151 [100%] | Badische Stahlwerke GmbH[4] | 4296443547 | E100000130777 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
semi-finished; finished rolled[5] | wire rod; bar; rebar; billet[5] | building and infrastructure[5] | 2021[6] | 2021[6] | EAF[4] | 2 EAF[4][7] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 2500 TTPA[7][7] | 2500 TTPA[7][7] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ Welcome to the steel mill of the future, Kehler Group, Retrieved on: Jul. 6, 2020
- ↑ 2.0 2.1 https://web.archive.org/web/20220814032113/https://www.bsw-kehl.de/?lang=en. Archived from the original on 14 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220519020823/https://www.bsw-kehl.de/company/?lang=en. Archived from the original on 19 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20211105071852/https://www.bsw-kehl.de/. Archived from the original on 05 November 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20220519012432/https://www.bsw-kehl.de/produkte/. Archived from the original on 19 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 (PDF) https://web.archive.org/web/20230331125823/https://bsw-kehl.de/wp-content/uploads/2022/01/2021_zertifikatemas_50001_14001_deutsch.pdf. Archived from the original (PDF) on 31 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 (PDF) https://web.archive.org/web/20220318115528/https://www.eurofer.eu/assets/Uploads/Map-20191113_Eurofer_SteelIndustry_Rev3-has-stainless.pdf. Archived from the original (PDF) on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help)