Klechovce-Negotino Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Klechovce-Negotino Gas Pipeline is an operating gas pipeline in North Macedonia
Location
The pipeline starts at the Skopje-Kriva Palanka Gas Pipeline and runs south to Negotino.[1]
Project details
- Operator: MER JSC Skopje[1]
- Owner: MER JSC Skopje[1]
- Parent company: MER JSC Skopje[1]
- Capacity:
- Length: 97 km[2][3][4]
- Diameter: 700, 500, 200 mm.
- Status: Operating
- Start year: 2019
- Cost: $75.7 million[5]
- Financing:
- Associated infrastructure: Skopje-Kriva Palanka Gas Pipeline
Background
Built in two phases, this pipeline carries imported natural gas from Northern Macedonia to its southern regions. Receiving gas from the Skopje-Kriva Palanka Gas Pipeline, it connects to a compressor station at the city of Stip before passing through to Negotino. The first phase (Klechovce-Stip) was commissioned in 2016, while the second phase was commissioned in 2019.[3]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 European Bank for Reconstruction and Development (Apr, 2020). "Gas distribution network in North Macedonia Update of Feasibility study" (PDF). EBRD. Retrieved Jul 25th, 2022.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help); line feed character in|title=
at position 34 (help)CS1 maint: url-status (link) - ↑ "NATIONAL ENERGY RESOURCES Skopje". mer.com.mk. Retrieved 2022-07-25.
- ↑ 3.0 3.1 "National gas pipeline Klechovce- Negotino, section BS5 – Negotino, 36km (61-97 km) | RapidBild". rapidbild.com.mk. Retrieved 2022-07-25.
- ↑ "NATIONAL ENERGY RESOURCES Skopje". mer.com.mk. Retrieved 2022-07-25.
- ↑ Skopje (Mar 14th, 2015). "Construction of Klecovce-Stip gas pipeline commenced". North Macedonian Ministry of Finance. Retrieved Jul 25th, 2022.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link)