Kuakata-Payra-Barisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Kuakata-PayraBarisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline is a proposed gas pipeline in Bangladesh.[1]
Location
The pipeline would run from Kuakata to Khulna through Barishal, Bangladesh.[2][1][3][4]
Project Details
- Operator: Gas Transmission Company Limited (GTCL) [2]
- Owner: Gas Transmission Company Limited (GTCL) [2]
- Parent company: Petrobangla [2]
- Capacity:
- Length: 250 km[2][1][3]
- Diameter: 42, 36 inches[2][3]
- Status: Proposed[2]
- Start year: 2025[2][1]
- Cost:
- Financing:
- Associated infrastructure:
Background
The project has been proposed by GTCL, a subsidiary of Petrobangla.[2][1] The project was originally conceived as Payra-Barishal-Gopalganj Gas Transmission Pipeline.
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Future Projects". GTCL.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 "Annual Report 2020" (PDF). Petrobangla.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 https://petrobangla.portal.gov.bd/sites/default/files/files/petrobangla.portal.gov.bd/annual_reports/035c1d34_7671_4477_9fc1_71659da2357f/2023-10-14-17-08-efda448681328c0e62f973d4451819ee.pdf
- ↑ https://gtcl.portal.gov.bd/sites/default/files/files/gtcl.portal.gov.bd/monthly_report/f77ce396_ccee_46c8_8157_c0667c8ea4c1/2024-03-24-06-39-34a3686bc6eb7675953326a048feb1f8.pdf