Kyoei Steel Yamaguchi Division (Yamaguchi)
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Kyoei Steel Yamaguchi Division (Yamaguchi) (共栄製鋼 山口事業部) is a steel plant in Onoda, Yamaguchi, Japan that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Onoda, Yamaguchi, Japan:
- Location: 6289-18 Onoda, Sanyo-Onoda City, Yamaguchi 756-0817 Japan
- Coordinates (WGS 84): 33.976513, 131.173031 (exact)
Background
Kyoei Iron Ltd was established in 1947. The name of the company was changed to Kyoei Steel Ltd in 1948. In 1972, Yamaguchi Kyoei Industries Ltd. (now Yamaguchi Division) was established in Onoda City (now Sanyo Onoda City), Yamaguchi Prefecture.[1] The plant operates a 50 ton AC electric arc furnace.[2]
In December 2023, a 1.61 GWh per year solar power plant was installed at Yamaguchi Division’s Higashioki site, a controlled-type landfill disposal yard. The solar power plant included 11,985 m2 of solar panels. The power generated is used at the division’s shredder plant in the area, which recycles goods, and surplus power is sold to power companies.[3]
Plant Details
Table 1: General Plant Details
Start date | Workforce size | Power source |
---|---|---|
1972[4] | 158[5] | unknown |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Kyoei Steel Ltd [100.0%] | 4295875990 [100.0%] | E100000130707 [100.0%] | Kyoei Steel Ltd [100%][6] | 4295875990 | E100000130707 [100%] |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment |
---|---|---|---|---|
finished rolled[7] | angle, bar[7] | building and infrastructure[7] | yes[5] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 575[8][7] | 575[8][7] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Total (all routes) |
---|---|---|
2019 | 363[9] | 363[9] |
2020 | 347[9] | 347[9] |
2021 | 348[9] | 348[9] |
2022 | 334[9] | 334[9] |
2023 | 345[10] | 345[10] |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|
unknown EAF (1) | operating[9] | 575[7][8] | 50.0[7] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | yes[11] | 100.00[11] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "History | Company Information | KYOEI STEEL LTD". www.kyoeisteel.co.jp. Retrieved 2024-02-23.
- ↑ "Yamaguchi Division | Head Office / Office Information | Company Information | KYOEI STEEL LTD". www.kyoeisteel.co.jp. Retrieved 2024-02-23.
- ↑ "Kyoei Steel Integrated report 2024" (PDF). Kyoei Steel. 2024. Retrieved 2024-12-30.
{{cite web}}
: CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20220114112704/https://www.kyoeisteel.co.jp/en/company/history.html. Archived from the original on 2022-01-14.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://www.kyoeisteel.co.jp/en/ir/library/annual_report/main/06/teaserItems2/0/link/kyoeisteelreport2022(EN)_spread.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125054926/https://www.kyoeisteel.co.jp/en/company/overview.html. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 https://web.archive.org/web/20220119164024/https://www.kyoeisteel.co.jp/en/company/office/yamaguchi.html. Archived from the original on 2022-01-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 https://web.archive.org/web/20201031132803/https://www.amm.com/Magazine/2507295/Dateline/Why-Japans-EF-contingent-is-in-no-rush-to-consolidate.html. Archived from the original on 2020-10-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 (PDF) https://web.archive.org/web/20240126000019/https://www.kyoeisteel.co.jp/en/ir/library/annual_report/main/06/teaserItems2/0/link/kyoeisteelintegratedreport2023_1%2528EN%2529_spread.pdf. Archived from the original (PDF) on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 (PDF) https://www.kyoeisteel.co.jp/en/ir/library/annual_report/main/06/teaserItems2/0/link/KYOEISTEELINTEGRATEDREPORT2024EN(for%20browsing).pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://web.archive.org/web/20240126190627/https://www.kyoeisteel.co.jp/en/csr/value/valuechain.html. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help)