Legrad Hybrid Power Project
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Legrad Hybrid Power Project is an announced power station in Legrad, Koprivnica-Križevci, Croatia.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Legrad Hybrid Power Project | Legrad, Koprivnica-Križevci, Croatia | 46.2825, 16.7823 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- CC1: 46.2825, 16.7823
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP |
---|---|---|---|---|---|
CC1 | Announced[2][3] | fossil gas: natural gas[1] | 483[1] | combined cycle[1] | not found |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
CC1 | EEG Energy-Gas doo [100%][1] | EEG Energy Group doo [100.0%] |
Background
This power station is part of a hybrid power station that includes the Legrad Hybrid Power Project solar farm, an 86 MW solar farm that will be built in two phases. A gas fired combined cycle power station of 483 MW is planned as part of the 3rd phase of development for the power station.
As of March, 2022, plans for the power station were undergoing the permitting process by the Hungarian government.[4]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 (PDF) https://web.archive.org/web/20220724102907/https://mingor.gov.hr/UserDocsImages/UPRAVA-ZA-PROCJENU-UTJECAJA-NA-OKOLIS-ODRZIVO-GOSPODARENJE-OTPADOM/Opuo/OPUO_2021/19_11_2021_Elaborat_SE_Kutnjak_SE_Selnica_Podravska.pdf. Archived from the original (PDF) on 24 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220724102942/https://mingor.gov.hr/UserDocsImages/UPRAVA-ZA-PROCJENU-UTJECAJA-NA-OKOLIS-ODRZIVO-GOSPODARENJE-OTPADOM/Opuo/OPUO_2022/24_03_2022_Rjesenje_SE_Kutnjak.pdf. Archived from the original (PDF) on 24 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20230120171754/http://oie.hr/wp-content/uploads/2022/02/RESC-EBRD-Guide-for-develop.-impl.-of-RES-projects-in-Croatia.pdf. Archived from the original (PDF) on 20 January 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Uprava za procjenu utjecaja an okolis i odrzivo gospodarenje otpadom Sektor za procjenu utjecaja na okolis" (PDF). Ministarstvo Gospodarstva I Odrzivog Razvoja. 22nd March, 22. Retrieved Dec 12th, 2022.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.