Lianyungang Huale Alloy Group Co Ltd
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Lianyungang Huale Alloy Group Co Ltd (连云港华乐合金集团有限公司), also known as Lianyungang Huale Alloy Co., Ltd., is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Lianyungang, Jiangsu, China.
Location
The map below shows the exact location of the plant in Lianyungang, Jiangsu, China:
- Location: Banqiao Industrial Park, Lianyun District, Lianyungang City, Jiangsu Province
- Coordinates (WGS 84): 34.607964, 119.447626 (exact)
Background
The company was subjected to administrative penalties for putting into operation its environmental protection facilities without undergoing acceptance inspection.[1]
Plant Details
Table 1: General Plant Details
Plant status | Workforce size |
---|---|
Operating[2] | 1464[2] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|
Lianyungang Huale Alloy Group Co Ltd [100%] | E100000123261 [97%]; E100000001753 [3%] | Lianyungang Huale Alloy Group Co., Ltd.[2] | E100000127135 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
finished rolled[3] | stainless steel heat-treated strips, cold-rolled steel[3][4] | building and infrastructure; tools and machinery; energy[5] | 2023[5] | 2022[5] | BF, BOF[6] | 3 BOFs (3x70-tonne); sinter plant (1x132m2)[4] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 620 TTPA[4][4][4] | 620 TTPA[4][4][4] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
operating | 460 TTPA[4] | 460 TTPA[4] |
Blast Furnace Details
Table 6: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|
unknown | operating[7] | unknown | unknown | unknown | 450 m³[7] | 460[4] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "连云港市生态环境局 行政处罚决定书(连云环行罚字〔2021〕24号)". 连云港市生态环境局. 2021-12-14.
- ↑ 2.0 2.1 2.2 https://web.archive.org/web/20220111140303/https://www.qcc.com/firm/75dc8e708b298147e20c34c0a92d032c.html. Archived from the original on 11 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 http://www.hualehejin.com/cpfwinfoa.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 https://web.archive.org/web/20220119183213/http://www.hualehejin.com/company. Archived from the original on 19 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20240119063341/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E8%BF%9E%E4%BA%91%E6%B8%AF%E5%8D%8E%E4%B9%90%E5%90%88%E9%87%91%E9%9B%86%E5%9B%A2%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220121121757/https://huanbao.bjx.com.cn/news/20200302/1049626.shtml. Archived from the original on 21 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 http://www.hualehejin.com/company;https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml.
{{cite web}}
: Missing or empty|title=
(help)