Liberty Czestochowa steel plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Liberty Czestochowa steel plant, also known as ISD Huta Czestochowa steel plant, is an electric arc furnace (EAF) steel plant operating in Częstochowa, Silesia, Poland.

Location

The map below shows the exact location of the plant in Częstochowa, Silesia, Poland:

Loading map...
  • Location: Ludwika Trochimowskiego 25, 42-200 Częstochowa, Poland
  • Coordinates (WGS 84): 50.782614, 19.165566 (exact)

Background

Production at the ISD Huta Czestochowa steel plant is scrap-based; the facility's start date is unknown but it was restarted in 2021.[1][2]

Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size
Operating[3] 1902[4] 1200[5]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
GFG Alliance Ltd [100.0%] 5057811578 [100%] E100001000556 [100%] Liberty Steel[6] 5001068852 E100000130950

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Main production equipment Detailed production equipment
semi-finished[5] plate[7] building and infrastructure; energy; tools and machinery; transport[8] yes[8] yes[8] EAF[5] 1 EAF[5]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 840 TTPA[5] 840 TTPA[5]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "LIBERTY Steel restarts Huta Częstochowa Electric Arc Furnace". LIBERTY Steel Group. Archived from the original on March 19, 2022. Retrieved March 19, 2022.
  2. Laura, Diana. "Liberty Steel completes acquisition of leased Polish plate mill for $51.55 million". S&P Global. Archived from the original on March 20, 2022. Retrieved March 20, 2022.
  3. https://web.archive.org/web/20220318101455/https://libertysteelgroup.com/news/liberty-steel-restarts-huta-czestochowa-electric-arc-furnace/. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20220125104645/https://focusonbusiness.eu/en/news/125-years-of-tradition/4463. Archived from the original on 25 January 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20220320124513/https://www.spglobal.com/commodity-insights/en/market-insights/latest-news/metals/052821-liberty-steel-completes-acquisition-of-leased-polish-plate-mill-for-5155-million. Archived from the original on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20230921180635/https://libertysteelgroup.com/pl/?lang=en. Archived from the original on 21 September 2023. {{cite web}}: Missing or empty |title= (help)
  7. https://libertysteelgroup.com/pl/departments/walcownia-blach-grubych/?lang=en. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 (PDF) https://web.archive.org/web/20230626022047/http://libertysteelgroup.com/pl/wp-content/uploads/sites/10/2021/09/Liberty-Czestochowa-Brochure-A4.pdf. Archived from the original (PDF) on 26 June 2023. {{cite web}}: Missing or empty |title= (help)

Resources