Licheng Taihang Iron and Steel Co Ltd (黎城太行钢铁有限公司) is a steel plant in Licheng, Changzhi, Shanxi, China that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.

Location

The map below shows the exact location of the plant in Licheng, Changzhi, Shanxi, China:

Loading map...
  • Location: Chengnan
  • Coordinates (WGS 84): 36.472303, 113.344155 (exact)

Background

Licheng Taihang Iron & Steel Co., Ltd. is in the process of upgrading its smelting equipment based on the "Shanxi Iron and Steel Industry Revitalization Plan." The 3 billion RMB project, to be completed by the end of 2025, will shift the plant from an integrated plant with blast furnace technology toward an electric steel plant producing special steel.[1]

In addition, the Licheng County Party Committee is planning the merger and reorganization of four private steel companies in Changzhi in order to form a new industrial base with a production capacity of 6 millions tons of crude steel per year. This project is set to resume "as soon as possible after the epidemic is over."[1]

Plant Details

Table 1: General Plant Details

Start date Workforce size
2000-06-15[2] 1985[2]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Licheng Taihang Iron & Steel Co Ltd [100.0%] unknown [100.0%] E100000126125 [100.0%] Licheng Taihang Iron & Steel Co Ltd [100%][3] unknown E100000126125 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
finished rolled[4] round bar, rebar, wire, bar[4] building and infrastructure, energy, tools and machinery, transport[5] 2022-01-11[5] 2024-04-11[5] unknown BF; BOF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
operating 1700[6] 1700[6]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
operating 618[7] 618[7]
retired 560[8] 560[8]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF NF NF NF

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year BOF production Other/unknown steel production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown unknown

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production DRI production Other/unknown iron production
2019 unknown unknown unknown
2020 unknown unknown unknown
2021 unknown unknown unknown
2022 unknown unknown
2023 unknown unknown

Unit Details

Table 9: Blast Furnace Details

Unit name Status Retired date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown BF (1) retired[7] 2020[7] 458.0 m3[9] 560[8] unknown
unknown BF (2) operating[9] 528.0 m3[9] 618[7] unknown 2023-10-10[10]

Table 10: Basic Oxygen Furnace Details

Unit name Status Current capacity (ttpa) Current size
unknown BOF (1) operating[3] 850[6] 50.0 tonnes[11]
unknown BOF (2) operating[3] 850[6] 50.0 tonnes[11]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 公司简介, 太行钢铁有限公司, Retrieved on: Jul. 27, 2020
  2. 2.0 2.1 https://www.gongsi.com.cn/detail/85ce0f0e-0bd7-3964-936a-c1e321cc10a91. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20220110223614/https://www.qcc.com/firm/8ef95fc1e86c1f4f71a00ad8f0f3b62d.html. Archived from the original on 10 January 2022. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20220113232914/http://lcthgt.com/company.asp. Archived from the original on 2022-01-13. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://web.archive.org/web/20240119055600/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E9%BB%8E%E5%9F%8E%E5%A4%AA%E8%A1%8C%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 http://www.changzhi.gov.cn/xxgkml/czsrmzf/zbwj_3466/202012/t20201203_2195352.shtml. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 https://web.archive.org/web/20220129203126/https://huanbao.bjx.com.cn/news/20201203/1119846.shtml. Archived from the original on 2022-01-29. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 "产能核算" (PDF). Archived from the original (PDF) on 2022-02-24.
  9. 9.0 9.1 9.2 "全国规范钢铁企业拟增至263家(附全名单及其装备)". finance.sina.com.cn. 2020-03-02. Archived from the original on 2022-02-07. Retrieved 2024-11-19.
  10. https://web.archive.org/web/20231114162951/https://baijiahao.baidu.com/s?id=1779063870520333407&wfr=spider&for=pc. Archived from the original on 2023-11-14. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml;https://huanbao.bjx.com.cn/news/20201203/1119846.shtml. {{cite web}}: Missing or empty |title= (help)

Resources