Lvliang Jianlong Industrial Co Ltd
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Lvliang Jianlong Industrial Co Ltd (吕梁建龙实业有限公司), also known as Wenshui Haiwei Steel Co., Ltd., is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Lvliang, Shanxi, China.
Location
The map below shows the exact location of the plant in Lvliang, Shanxi, China:
- Location: Sang Village, Wenshui County, Luliang City, Shanxi Province
- Coordinates (WGS 84): 37.450250, 112.052094 (exact)
Background
According to media reports, Wenshui Haiwei Steel Co., Ltd. was reportedly transferred to the trusteeship of Shanxi Jianlong Industrial Co., Ltd. in June 2020 after its leadership was arrested in May 2020 for criminal charges related to illegal weapons ownership and illegal mining.[1][2]
According to the capacity replacement plan in January 2022, the company plans to build a 1780m3 blast furnace and a 150-tonnne basic oxygen furnace.[3][4]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Start date | Pre-retirement announcement date | Idled date | Workforce size |
---|---|---|---|---|---|---|
Main plant | Operating[5] | – | 1985[5] | – | – | 2153[6] |
Main plant | Operating[5] | – | 1985[5] | – | – | 2153[6] |
Closure | Retired[7] | – | – | 2022-08[8] | 2018[7] | – |
Expansion | Announced[8] | 2022-08[8] | – | – | – | – |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | China Great Wall Asset Management Co Ltd [48.0%]; Beijing Jianlong Investment Co Ltd [45.5%]; other [6.5%] | E100000124790 [48%]; E100000123261 [45.5%]; E100000001753 [6.5%] | Lvliang Jianlong Industrial Co., Ltd.[6] | E100000126132 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|---|
Main plant | finished rolled[6] | hot rolled ribbed steel bars[6] | automotive; building and infrastructure; tools and machinery[9] | 2022[9] | 2022[9] | BF, BOF[10] | 3 BOF (2x60-tonne, 1x120-tonne)[10] |
Main plant | finished rolled[6] | hot rolled ribbed steel bars[6] | automotive; building and infrastructure; tools and machinery[9] | 2022[9] | 2022[9] | BF, BOF[10] | 3 BOF (2x60-tonne, 1x120-tonne)[10] |
Closure | finished rolled[6] | hot rolled ribbed steel bars[6] | automotive; building and infrastructure; tools and machinery[9] | – | – | BF, BOF[8] | 2 BOF (2x60-tonne)[8] |
Expansion | finished rolled[6] | hot rolled ribbed steel bars[6] | automotive; building and infrastructure; tools and machinery[9] | – | – | BF, BOF[8] | 1 BOF (1x150-tonne)[8] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | 1400 TTPA[8] | 1400 TTPA[8] |
Main plant | mothballed | –[8] | –[8] |
Closure | retired | 1700 TTPA[8][8] | 1700 TTPA[8][8] |
Expansion | announced | 1600 TTPA[7] | 1600 TTPA[7] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 1535 TTPA[7][7][7][7] | 1535 TTPA[7][7][7][7] |
Main plant | mothballed | 1650 TTPA[7][7][7][7] | 1650 TTPA[7][7][7][7] |
Closure | retired | 1650 TTPA[7][7][7] | 1650 TTPA[7][7][7] |
Expansion | announced | 1520 TTPA[11] | 1520 TTPA[11] |
Blast Furnace Details
Table 6: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Retired date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
1 | operating[7] | unknown | unknown | 2012-12-01 00:00:00[7] | – | 1800 m³[10] | 1535[7] | unknown | 2023-03-13[12] |
unknown | mothballed[5] | unknown | unknown | 2004[7] | unknown | 450 m³[10] | 550[7] | unknown | unknown |
unknown | mothballed[5] | unknown | unknown | 2004[7] | unknown | 450 m³[10] | 550[7] | unknown | unknown |
unknown | mothballed[5] | unknown | unknown | 2004[7] | unknown | 450 m³[10] | 550[7] | unknown | unknown |
unknown | announced[8] | 2022-08[8] | unknown | unknown | – | 1780 m³[8] | 1520[11] | unknown | unknown |
unknown | retired[13] | unknown | unknown | 2004[7] | unknown | 450 m³[10] | 550[7] | unknown | unknown |
unknown | retired[13] | unknown | unknown | 2004[7] | unknown | 450 m³[10] | 550[7] | unknown | unknown |
unknown | retired[13] | unknown | unknown | 2004[7] | unknown | 450 m³[10] | 550[7] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 山西文水首富涉黑被抓私藏枪支炸药曾为某500强民企实控人, 腾讯网, Retrieved on: Jul. 24, 2020
- ↑ 山西建龙托管经营文水海威钢铁, 新浪财经, Retrieved on: Jul. 24, 2020
- ↑ 产能置换!山西省将新建14座高炉(约2000万吨)、12座转炉和1座电炉!,中联钢信网,August 24, 2018
- ↑ 关于文水海威钢铁有限公司产能置换方案企业名称变更情况的说明,山西省工信厅,January 17, 2022
- ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 https://www.kuangyeyuan.com/article/2097.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 https://web.archive.org/web/20220318142440/https://www.qcc.com/weblogin?back. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 7.18 7.19 7.20 7.21 7.22 7.23 7.24 7.25 7.26 7.27 7.28 7.29 7.30 7.31 7.32 7.33 7.34 7.35 7.36 7.37 7.38 7.39 7.40 (PDF) http://www.wenshui.gov.cn/xxgk/zzjg/xzbm/jxj/tzgg_56686/202109/W020210907629852005083.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 8.16 8.17 (PDF) https://web.archive.org/web/20230828140121/http://www.wenshui.gov.cn/zmhd/yjzj/202304/P020230406405424621529.pdf. Archived from the original (PDF) on 28 August 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 https://web.archive.org/web/20240119064152/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%90%95%E6%A2%81%E5%BB%BA%E9%BE%99%E5%AE%9E%E4%B8%9A%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 http://www.jyzsw.com.cn/onews.asp?id=1595.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240322052028/https://weibo.com/ttarticle/p/show?id=2309404746966348465095. Archived from the original on 22 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 https://web.archive.org/web/20220319093636/https://info.lgmi.com/html/202007/24/1953.htm. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help)