MSP Steel & Power Raigarh plant, also known as MSPSPL, is a blast furnace (BF) steel plant operating in Raigarh, Chhattisgarh, India.
Location
The map below shows the exact location of the plant in Raigarh, Chhattisgarh, India:
- Location: Manuapali, Jamgaon, District Raigarh (Chhattisgarh), India
- Coordinates (WGS 84): 21.876730, 83.554495 (exact)
Background
MSP steel & power plant was incorporated on November 18, 1968 as Adhunik Rollers Private Limited in West Bengal. The company was renamed to MSP Steel & Power Private Limited on March 7, 2003. The company subsequently became a public company with effect from September 9, 2003. The company manufactures sponge iron and trading of steel products.[1] On 14 February 2023, MSP Steel & Power submitted a proposal before the Ministry of Environment, Forest & Climate Change for expansion of sponge iron capacity from 375 ttpa to 953 ttpa and crude steel capacity from 384 ttpa to 1171 ttpa. This will be developed in two phases.[2]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Start date | Workforce size | Power source |
---|---|---|---|---|---|
Main plant | Operating[3] | – | 2002[4] | 1073[5] | 45 MW Captive Power plant [6] |
Expansion | Announced[7] | 2021[8] | 2025[9] | – | – |
Expansion | Announced[9] | 2021[8] | 2025[9] | – | 51 MW CPP[7] |
Table 2: Ownership and Parent Company Information
Phase | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|
Main plant | MSP Steel & Power Ltd[10] | 4295873986 | E100000130702 |
Table 3: Process and Products
Phase | Steel product category | Steel products | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
Main plant | crude; semi-finished; finished rolled[5] | pellets; sponge iron; billets; bars; structurals[5] | yes[5] | DRI, other[5] | 3 DRI (375 tpd each); 9 IF (1 18 ton, 3 15 ton, 5 8 ton)[5][7] |
Expansion | semi-finished[7] | – | – | BF, other[7] | 1 BF (380 m3); 4 IF (30 ton each)[7] |
Expansion | crude; semi-finished; finished rolled[5] | pellets; sponge iron; billets; bars; structurals[5] | – | DRI, other[5][7] | 3 DRI (2 600 tpd, 1 500 tpd); 3 IF (20 ton each)[7] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Nominal crude steel capacity (total) |
---|---|---|
Main plant | operating | 383 TTPA |
Expansion | announced | 594 TTPA |
Expansion | announced | 193 TTPA |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|---|
Main plant | operating | – | 375 TTPA[11][11][11] | 375 TTPA[11][11][11] |
Expansion | announced | 450 TTPA[7] | – | 450 TTPA[7] |
Expansion | announced | – | 578 TTPA[12][7][12][7][12][7] | 578 TTPA[12][7][12][7][12][7] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Ferronickel | Sinter | Pellets |
---|---|---|---|
Main plant | 300 TTPA[5][13] | 900 TTPA[14] | 300 TTPA[11] |
Expansion | – | 720 TTPA[7] | – |
Expansion | – | –[14][7] | 350 TTPA[14] |
Blast Furnace Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|
1 | announced[7] | 2022[7] | unknown | 2025[7] | 380 m³[7] | 450[7] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "MSP Steel & Power: Reports, Company History, Directors Report, Chairman's Speech, Auditors Report of MSP Steel & Power - NDTV". www.ndtv.com. Retrieved 2023-10-17.
- ↑ "Environment Clearance Proposal" (PDF). MoEF&CC. 14 February, 2023. Retrieved 26 December, 2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20220121165513/https://www.mspsteel.com/reach/plant. Archived from the original on 21 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.indiamart.com/mspsteel-power-raigarh/aboutus.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 (PDF) https://web.archive.org/web/20220119232845/https://www.mspsteel.com/images/msp-annual-report-2021.pdf. Archived from the original (PDF) on 19 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240111045035/https://www.mspsteel.com/images/EC_Compliance_Apr_22_to_Sep_22_MSPSPL.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 7.18 7.19 7.20 7.21 7.22 (PDF) https://web.archive.org/web/20240111014421/https://environmentclearance.nic.in/writereaddata/Online/EDS/0_0_14_Feb_2023_1712041671ADSresponse.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20240111015949/https://indiacsr.in/chhattisgarh-high-court-stays-public-hearing-on-msp-steel-and-power-ltd-plant-expansion/. Archived from the original on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125054931/https://www.mspsteel.com/about-us/overview. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 11.6 (PDF) https://web.archive.org/web/20211017035003/https://www.mspsteel.com/images/analytics-report22.pdf. Archived from the original (PDF) on 17 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 12.5 (PDF) https://enviscecb.org/MSP/EXECUTIVE%20SUMMARY(English).pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20221008040524/https://www.midrex.com/wp-content/uploads/MidrexSTATSBook2021.pdf. Archived from the original (PDF) on 08 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 http://www.environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=vpQrUPhnhxd9D67zxOcblh6lUxTzLNkmJR/hE5OuwEMwlCbx+9dQrfwvIKVHpECXcJxRkaEiw8K+F+wDNz8T4/9mUlPwiM1noSbNsKYP8KDSkeOaebntuDprFtJfFTzX&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==.
{{cite web}}
: Missing or empty|title=
(help)