Malaysia Steel Works Klang
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Malaysia Steel Works Klang, also known as Masteel Klang, is a steel plant in Klang, Selangor, Malaysia that operates steelmaking and electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Klang, Selangor, Malaysia:
- Location: Lot 13039, Jalan Waja, Bukit Raja Industrial Estate, 41050 Klang, Selangor Darul Ehsan, Malaysia
- Coordinates (WGS 84): 3.077835, 101.46448 (exact)
Background
Masteel was founded on 25 March 1971. It started operations with electric arc furnace to smelt steel scrap to produce steel reinforcing bars at their rolling mill in Petaling Jaya, Selangor Darul Ehsan, Malaysia. The Bukit raja steel plant was commissioned in 1998. The electric arc furnace was supplied by Italy-based Danieli and was one of the most modern equipment at the time. The meltshop had an installed capacity of 750 ttpa. In 2021, after a 4 year revamping programme the plant installed 60 ton induction furnaces to replace its conventional electric arc furnace. The new furnaces produced carbon and alloy steel.[1][2]
Plant Details
Table 1: General Plant Details
Start date | Workforce size | Power source |
---|---|---|
1998[3] | 367[4] | unknown |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Malaysia Steel Works (KL) Bhd | 4295884031 | E100000130724 | Malaysia Steel Works (KL) Bhd[5] | 4295884031 | E100000130724 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment |
---|---|---|---|---|---|
semi-finished[3] | billet, bar[5] | building and infrastructure, transport[6] | Expired[7][6] | no[6] | EAF; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
operating | – | 800[8] | 800[8] |
retired | 750[3] | – | 750[3] |
Table 5: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel | Sinter | Coke | Pellets |
---|---|---|---|
>0[3] | NF | NF | NF |
Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production | Total (all routes) |
---|---|---|---|
2019 | 780[9] | –[9] | 780[9] |
2020 | 780[9] | –[9] | 780[9] |
2021 | 780[10] | –[10] | 780[10] |
2022 | unknown | unknown | – |
Unit Details
Table 7: Electric Arc Furnace Details
Unit name | Status | Start date | Retired date | Current capacity (ttpa) |
---|---|---|---|---|
unknown EAF (1) | retired[3] | 1998[3] | 2021[3] | 750[3] |
Table 8: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | yes[3] | 100.00[11] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "History & Milestones – Malaysia Steel Works". www.masteel.com.my. Retrieved 2023-11-29.
- ↑ "2022 Sustainability Report" (PDF). Masteel. 2022. Retrieved 29 November, 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 https://web.archive.org/web/20221130082913/https://www.masteel.com.my/history-milestones/. Archived from the original on 2022-11-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.globaldata.com/company-profile/malaysia-steel-works-kl-bhd/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240125055316/https://www.masteel.com.my/company-profile/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 https://www.klsescreener.com/v2/announcements/view/3543151.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220318113620/http://www.masteel.com.my/uploads/2021/05/Sustainability-Climate-Change-Report-2020.pdf. Archived from the original (PDF) on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 (PDF) https://www.masteel.com.my/wp-content/uploads/2023/05/Masteel-Annual-Report-2022_compressed.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 (PDF) http://www.masteel.com.my/uploads/2021/05/MSW-AR2020.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 (PDF) https://web.archive.org/web/20221130074059/https://www.masteel.com.my/wp-content/uploads/2022/11/Masteel-Annual-Report-2021.pdf. Archived from the original (PDF) on 2022-11-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240110015546/https://www.masteel.com.my/wp-content/uploads/2023/08/Sustainability-Climate-Change-Report-2020-compressed-compressed-2.pdf. Archived from the original (PDF) on 2024-01-10.
{{cite web}}
: Missing or empty|title=
(help)