Mesabi Metallics Nashwuak HBI plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Mesabi Metallics Nashwuak HBI plant is a steel plant in Nashwuak, Minnesota, United States that operates direct reduced iron (DRI) technology.

Location

The map below shows the exact location of the plant in Nashwuak, Minnesota, United States:

Loading map...
  • Location: 17113 Co Rd 58, Nashwauk, Minnesota, United States
  • Coordinates (WGS 84): 47.383441, -93.219413 (exact)

Plant Details

Table 1: General Plant Details

Announced date Start date Workforce size
2020[1] 2026[2] 350[3]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Steel Dynamics Inc; unknown 4295908010; not applicable E100001010336; E100000132388 Mesabi Mining LLC[1] 5063372746 E100001012502

Table 3: Process and Products

Steel product category Steel products Main production equipment
crude[1] HBI[1] DRI

Table 4: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
construction 7000[3][1] 7000[3][1]

Table 5: Upstream Products Production Capacities (thousand tonnes per annum)

Pellets
7000[4]

Unit Details

Table 6: Direct Reduced Iron Furnace Details

Unit name Status Announced date Start date Furnace type Current capacity (ttpa)
unknown DRI (1) construction[5][1] 2020[1] 2026[2] shaft furnace 7000[1][3]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://web.archive.org/web/20240218075504/https://www.startribune.com/minnesota-officials-approve-new-lease-for-stalled-mesabi-metallics-project/573266751/. Archived from the original on 2024-02-18. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://www.mesabimetallics.com/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://www.youtube.com/watch?v=EAjq1nywue0&t=14s. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240217013953/https://www.mining-technology.com/projects/minnesota-iron-ore-nashwauk-minnesota/. Archived from the original on 2024-02-17. {{cite web}}: Missing or empty |title= (help)
  5. https://minnesotareformer.com/2024/10/14/good-news-on-the-iron-range-2-billion-mesabi-metallics-is-finally-happening-for-real-this-time/. {{cite web}}: Missing or empty |title= (help)

Resources