Mesco Steel Kalinganagar plant, also known as MESCO-I, MSKL, Mideast Integrated Steel (MISL), is a steel plant in Kalinganagar, Danagadi, Jajpur, Odisha, India that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.
Location
The map below shows the exact location of the plant in Kalinganagar, Danagadi, Jajpur, Odisha, India:
- Location: Kalinga Nagar Industrial Complex, Khurunti, P.O. Danagadi - 755026, Distt. Jaipur, Orissa, India
- Coordinates (WGS 84): 20.976277, 86.044419 (exact)
Background
The Mesco Steel Kalinganagar steel plant began operating in 1992 under the Mesco Steel Group.[1] In 2005, pig iron production commenced.[2]
In December 2015, Mesco Steel Kalinganagar was forced to cease operations due to lack of raw materials; this closure went on at least until 2017.[3]
In February 2022, a civilian petition reported that Mesco was pursuing an illegal railway siding project at the site, which was releasing toxic substances into the environment. According to the petition, the Mesco Steel Kalinganagar plant had been shut since 2020.[4]
Expansion
According to Mesco Steel's website, an expansion including 2 BOF plants (100-tonnes each), 1 BF plant (3200 m3), a sinter plant, and coke oven battery was planned to be completed by 2021. The crude steel capacity would have amounted to 2300 ttpa.[2] However, no update has been posted since 2020, so the status of the expansion phase has been changed to 'cancelled'.
The plant had been shut since December 2019. As a result, around 1,400 employees and thousands of workers are not getting their salaries for the last five years under ‘no work no pay’ rule. In December 2024, the Kalinga Nagar Mazdoor Union (KMU) demanded immediate reopening of the plant.[5]
Plant Details
Table 1: General Plant Details
Construction date | Start date | Power source | Iron ore source | Coal source |
---|---|---|---|---|
1997[6] | 2005[7][8] | One captive power plant (24 MW capacity)[9] | Roida mines[10] | Chhindwara[10] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Mesco Kalinga Steel Ltd | 4296917434 | E100000130811 | Mesco Kalinga Steel Ltd[11] | 4296917434 | E100000130811 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment |
---|---|---|---|---|
crude, semi-finished[12] | pig iron, long products, plate, flat[12] | unknown | unknown | BF; BOF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
cancelled | 2300[13][9][14][7] | 2300[13][9][14][7] |
operating | 1200[13][9][14][7] | 1200[13][9][14][7] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
cancelled | 2300[9] | 2300[9] |
operating | 1200[9] | 1200[9] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter | Pellets |
---|---|
770[9] | NF |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF production | Other/unknown steel production |
---|---|---|
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
2023 | unknown | unknown |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | BF production | Other/unknown iron production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
2023 | unknown | unknown |
Unit Details
Table 9: Blast Furnace Details
Unit name | Status | Announced date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|
unknown BF (1) | operating[15] | – | 2005[6] | 389.0 m3[15] | 600[9] | unknown | 2017-11[16] |
unknown BF (2) | operating[15] | – | 2012[6] | 389.0 m3[15] | 600[9] | unknown | – |
unknown BF (3) | cancelled[9][14][17] | 2014[18] | – | 3200.0 m3[19] | 2300[9] | unknown | – |
Table 10: Basic Oxygen Furnace Details
Unit name | Status | Current capacity (ttpa) | Current size |
---|---|---|---|
unknown BOF (1) | operating[20] | 1200[9][7][13][14] | 100.0 tonnes[9][21] |
unknown BOF (2) | cancelled[9][14] | 1150[9][7][13][14] | 100.0 tonnes[21] |
unknown BOF (3) | cancelled[9][14] | 1150[9][7][13][14] | 100.0 tonnes[21] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Brochure" (PDF). Archived (PDF) from the original on January 27, 2022. Retrieved January 27, 2022.
- ↑ 2.0 2.1 "Home". Mesco Steel. Archived from the original on December 6, 2021. Retrieved January 24, 2022.
- ↑ Dash, Jayajit (2017-08-21). "Visa Steel suspends Kalinganagar operations as raw material supplies stop". Business Standard India. Retrieved 2022-03-04.
- ↑ "NGT orders action against illegal railway siding". OrissaPOST. 2022-02-08. Retrieved 2022-03-04.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Service, Express News (2024-12-04). "KMU seeks reopening of MISL plant". The New Indian Express. Retrieved 2025-01-21.
- ↑ 6.0 6.1 6.2 (PDF) https://web.archive.org/web/20240111011054/https://mescosteel.com/pdf/brochure_mesco-2017.pdf. Archived from the original (PDF) on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 https://web.archive.org/web/20211206194651/http://www.mescosteel.com/. Archived from the original on 2021-12-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221107043011/https://www.inventiva.co.in/trends/top-10-best-steel-manufacturing-company-in-india-in-2023/. Archived from the original on 2022-11-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 9.12 9.13 9.14 9.15 9.16 9.17 9.18 9.19 (PDF) https://web.archive.org/web/20220122092000/http://mescosteel.com/pdf/brochure_mesco-2017.pdf. Archived from the original (PDF) on 2022-01-22.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 (PDF) https://www.bseindia.com/downloads/ipo/20171016174944Information%20Memorandum_%20Uploaded.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211206194651/http://www.mescosteel.com/. Archived from the original on 2021-12-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20240125060222/http://www.mescosteel.com/product.php. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 13.4 13.5 13.6 https://web.archive.org/web/20181017034451/https://economictimes.indiatimes.com/industry/indl-goods/svs/steel/mesco-keen-to-buy-struggling-steel-companies/articleshow/62063828.cms. Archived from the original on 2018-10-17.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 14.6 14.7 14.8 14.9 (PDF) https://web.archive.org/web/20210929032946/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf (PDF).
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 15.3 https://web.archive.org/web/20220309175114/http://mescosteel.com/product.php. Archived from the original on 2022-03-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.mescosteel.com/newsline2018/Newsline-11-Complete.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220407134357/http://mescosteel.com/future-projects.php. Archived from the original on 2022-04-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://sambadenglish.com/misl-fully-integrated-steel-plant-kalinganagar/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "FUTURE INVESTMENT PROJECTS IN THE GLOBAL STEEL INDUSTRY AND IMPLICATIONS FOR THE BALANCE OF STEELMAKING PROCESSES". OECD. 2015-03-10. Archived from the original on 2022-04-01.
- ↑ https://web.archive.org/web/20220312013301/http://mescosteel.com/locations.php. Archived from the original on 2022-03-12.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 21.2 https://web.archive.org/web/20200725140406/http://mescosteel.com:80/future-projects.php. Archived from the original on 2020-07-25.
{{cite web}}
: Missing or empty|title=
(help)