Minyuan Iron and Steel Group Co Ltd (闽源钢铁集团有限公司, 河南闽源特钢有限公司), also known as Henan Minyuan Special Steel Co., Ltd., is a steel plant in Yongcheng, Henan, China that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.

Location

The map below shows the exact location of the plant in Yongcheng, Henan, China:

Loading map...
  • Location: Chenshuanglou Village, Chenji Town, Yongcheng City, Henan Province
  • Coordinates (WGS 84): 34.013369, 116.422599 (exact)

Background

According to the capacity replacement plan in July 2022, the company plans to upgrade equipment and eliminate existing equipment. The assigned iron-making capacity is 1.475 million tons and the steel-making capacity is 3.375 million tons.[1]

The project involves demolish one 1,080m3 BF, one 55-ton BOF, and one 60-ton BOF. The company intends to construct one 1,280 m3 BF, two 120-ton BOF, two 120-ton ladle furnaces (LF), and two 120-ton vacuum refining furnaces.The project is scheduled to commence in July 2023, with an estimated completion and production date in July 2025.[2]

The environmental impact assessment document for the company's capacity reduction, equipment upgrading, and high-quality development project was publicly disclosed in December 2023.[3]

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source
2003[4] 2845[5][6] Distributed Photovoltaic Power Generation[7]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
natural person(s) [66.7%]; Fujian Mingfa Investment Co Ltd [33.3%] not applicable [66.7%]; unknown [33.3%] E100000123261 [66.7%]; E100000124295 [33.3%] Minyuan Iron and Steel Group Co Ltd [100%][4] unknown E100000123185 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
finished rolled[8] rebar, wire coil[8] building and infrastructure, transport[8] 2022-10-14[9][10] 2023-06-28[9][10] unknown BF; BOF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
announced 2700[11] 2700[11]
operating pre-retirement 1650[11] 1650[11]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
announced 1180[11] 1180[11]
operating pre-retirement 1040[11] 1040[11]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Coke Pellets
NF NF NF

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year BOF production Other/unknown steel production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production Other/unknown iron production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown

Unit Details

Table 9: Blast Furnace Details

Unit name Status Announced date Start date Retired date Current size Current capacity (ttpa) Decarbonization technology
unknown BF (1) announced[11] 2023-04-17[11] 2025[11] 1280.0 m3[11] 1180[11] unknown
unknown BF (2) operating pre-retirement[12] 2025[11] 1080.0 m3[12] 1040[11] unknown

Table 10: Basic Oxygen Furnace Details

Unit name Status Announced date Current capacity (ttpa) Current size
unknown BOF (1) operating pre-retirement[11] 800[11] 55.0 tonnes[12]
unknown BOF (2) operating pre-retirement[11] 850[11] 60.0 tonnes[12]
unknown BOF (3) announced[13] 2022-07[14] 1350[11] 120.0 tonnes[11]
unknown BOF (4) announced[13] 2022-07[14] 1350[11] 120.0 tonnes[11]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 闽源钢铁集团有限公司产能出让公示, 永城市人民政府网,July 4, 2022
  2. "闽源钢铁集团有限公司产能减量置换装备升级高质量发展建设项目产能置换方案公示". 河南省工业和信息化厅. 2023-04-17.
  3. "获批!这家钢厂新建1280m3高炉、120吨转炉、1450mm热轧卷板带钢生产线!". 冶金信息装备网. 2023-12-25.
  4. 4.0 4.1 https://web.archive.org/web/20220111135038/https://www.qcc.com/firm/79e1405c8f9d771da571e00280864b4d.html. Archived from the original on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  5. https://www.tianyancha.com/company/3176898235. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20240119065727/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20231116204042/http://www.mygtjt.com/News/IndexDetail/70/764.html. Archived from the original on 2023-11-16. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://web.archive.org/web/20220119160227/http://www.mygtjt.com/CompanyDescription/Introduction. Archived from the original on 2022-01-19. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20240115064740/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E9%97%BD%E6%BA%90%E9%92%A2%E9%93%81%E9%9B%86%E5%9B%A2%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://web.archive.org/web/20210508070952/http://www.mygtjt.com/ProductService/Authentication/0-1.html. Archived from the original on 2021-05-08. {{cite web}}: Missing or empty |title= (help)
  11. 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 11.16 11.17 11.18 11.19 11.20 11.21 11.22 https://web.archive.org/web/20240916171025/https://gxt.henan.gov.cn/2023/04-17/2726689.html. Archived from the original on 2024-09-16. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml,https://new.qq.com/omn/20201228/20201228A0KYD800.html. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 https://m.mysteel.com/22/0704/11/826AE295249182AD_abc.html. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 https://www.163.com/dy/article/HBGO4JBK0531N852.html. {{cite web}}: Missing or empty |title= (help)

Resources