Nees Hede Hybrid Solar Wind Project wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Nees Hede Hybrid Solar Wind Project wind farm is a wind farm in pre-construction in Lemvig, Denmark.

Project Details

Table 1: Phase-level project details for Nees Hede Hybrid Solar Wind Project wind farm

Status Nameplate capacity Type Owner
Pre-construction[1] 70 MW[1] Onshore[1] Cloudberry Clean Energy ASA[1]

Location

Table 2: Phase-level location details for Nees Hede Hybrid Solar Wind Project wind farm

Location Coordinates (WGS 84)
Lemvig, Denmark[2] 56.5118763, 8.3310317 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240218234304/https://renews.biz/89207/cloudberry-acquires-210mw-danish-hybrid-project/. Archived from the original on 18 February 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240218210525/https://renewablesnow.com/news/cloudberry-unit-snaps-up-210-mw-hybrid-project-in-denmark-838535/. {{cite web}}: Missing or empty |title= (help)