Nees Hede hybrid solar wind project solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Nees Hede hybrid solar wind project solar farm (Klimapark Nees Hede) is a solar photovoltaic (PV) farm in pre-construction in Lemvig, Jutland, Denmark.

Project Details

Table 1: Phase-level project details for Nees Hede hybrid solar wind project solar farm

Status Nameplate capacity Technology Owner
Pre-construction[1] 140 MW[2] PV[2] Cloudberry Clean Energy ASA [20%][3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Nees Hede hybrid solar wind project solar farm

Location Coordinates (WGS 84)
Lemvig, Jutland, Denmark[4] 56.3798, 8.2602 (exact)[4]

The map below shows the exact location of the solar farm:

Loading map...

Related Projects

This project is related to the following project:


Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. renews.biz. 2023-11-01 https://web.archive.org/web/20240218234304/https://renews.biz/89207/cloudberry-acquires-210mw-danish-hybrid-project/. Archived from the original on 2024-02-18. Retrieved 2024-01-18. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 Martina Markosyan (2023-11-01). "Cloudberry unit snaps up 210-MW hybrid project in Denmark". Renewables Now. Archived from the original on 2024-01-08. Retrieved 2024-01-08.
  3. https://renewablesnow.com/news/cloudberry-unit-snaps-up-210-mw-hybrid-project-in-denmark-838535/ https://renews.biz/89207/cloudberry-acquires-210mw-danish-hybrid-project/, https://renewablesnow.com/news/cloudberry-unit-snaps-up-210-mw-hybrid-project-in-denmark-838535/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. 4.0 4.1 https://lemvig.dk/politik/hoeringer-og-afgoerelser-arkiv/hoeringer-arkiv/klimapark-nees-hede https://renewablesnow.com/news/cloudberry-unit-snaps-up-210-mw-hybrid-project-in-denmark-838535/, https://lemvig.dk/politik/hoeringer-og-afgoerelser-arkiv/hoeringer-arkiv/klimapark-nees-hede. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)