Nees Hede hybrid solar wind project solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Nees Hede hybrid solar wind project solar farm (Klimapark Nees Hede) is a solar photovoltaic (PV) farm in pre-construction in Lemvig, Jutland, Denmark.
Project Details
Table 1: Phase-level project details for Nees Hede hybrid solar wind project solar farm
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Pre-construction[1] | 140 MW[2] | PV[2] | Cloudberry Clean Energy ASA [20%][1][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Nees Hede hybrid solar wind project solar farm
Location | Coordinates (WGS 84) |
---|---|
Lemvig, Jutland, Denmark[2][3] | 56.3798282, 8.2601548 (exact)[2][3] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240218234304/https://renews.biz/89207/cloudberry-acquires-210mw-danish-hybrid-project/. Archived from the original on 18 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://renewablesnow.com/news/cloudberry-unit-snaps-up-210-mw-hybrid-project-in-denmark-838535/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240218210551/https://lemvig.dk/politik/hoeringer-og-afgoerelser-arkiv/hoeringer-arkiv/klimapark-nees-hede. Archived from the original on 18 February 2024.
{{cite web}}
: Missing or empty|title=
(help)