Neyriz Ghadir Steel Company Fars plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Neyriz Ghadir Steel Company Fars plant (مجتمع فولاد نی‌ریز), also known as NGHSCO, is a steel plant in Neyriz, Fars, Iran that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Neyriz, Fars, Iran:

Loading map...
  • Location: 50 km of Neyriz Sirjan road, Neyriz, Fars, Iran
  • Coordinates (WGS 84): 29.168087, 54.621487 (exact)

Plant Details

Table 1: General Plant Details

Announced date Construction date Start date Workforce size Power source Iron ore source
2006[1] 2010[2] 2018[2] 1100[3] unknown They have acquired various iron ore mines around the country[4]

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Partial Ghadir Investment Company PJSC [65.0%]; Iranian Mines & Mining Industries Development & Renovation Organization [35.0%] 5035729783 [65.0%]; 5000935267 [35.0%] E100000000543 [65.0%]; E100000000547 [35.0%] Neyriz Ghadir Steel Co [100%][5] 5082688249 E100000131179 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
crude, semi-finished[5] DRI, billet[5] unknown unknown unknown unknown DRI; EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 1000[6][7][5] 1000[6][7][5]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
operating 800[8][2] 800[8][2]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Pellets
NF[6] 2500[4][6]

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production
2023 unknown unknown

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year DRI production Other/unknown iron production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown unknown

Unit Details

Table 9: Direct Reduced Iron Furnace Details

Unit name Status Start date Furnace manufacturer and model Furnace type Current capacity (ttpa) Reductant
unknown DRI (1) operating[9] 2018[10] Abtin Steel technology Company; Mines and Metals Engineering (MME) PERED[2][11][10][10] not found 800[2][8] not found

Table 10: Electric Arc Furnace Details

Unit name Status Construction date Start date Furnace manufacturer and model Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[12] 2020[7] 2023[13] Mines and Metals Engineering (MME Co.)[6] 1000[7][6][5] 140.0[6]

Table 11: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI
unknown EAF (1) yes[6] 10.00[6] 90.00[6]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Neyriz Ghadir Steel Complex". Neyriz Ghadir Steel Complex. Archived from the original on 2024-12-06. Retrieved 2024-12-04. {{cite web}}: Text "Producer of Sponge Iron, Iron ore Pellets, DRI, and Steel Billet" ignored (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20220922003708/https://financialtribune.com/articles/economy-business-and-markets/80887/new-dri-plant-comes-on-stream-in-fars-province. Archived from the original on 22 September 2022. {{cite web}}: Missing or empty |title= (help)
  3. "Entrepreneurship". Neyriz Ghadir Steel Complex. Archived from the original on 2024-12-06. Retrieved 2024-12-04.
  4. 4.0 4.1 "Operating Units". Neyriz Ghadir Steel Complex. Archived from the original on 2024-12-06. Retrieved 2024-12-04.
  5. 5.0 5.1 5.2 5.3 5.4 5.5 https://nghsco.com/about-us/?lang=en. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 https://web.archive.org/web/20220630101344/http://www.mme-co.de/en/Home/projects/Neyriz-Steel-Making.html. Archived from the original on 2022-06-30. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 (PDF) https://web.archive.org/web/20230410190908/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf (PDF). {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://web.archive.org/web/20240111013019/https://www.nghsco.com/. Archived from the original on 2024-01-11. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20230401173154/http://nghsco.com/about-us/?lang=en. Archived from the original on 2023-04-01. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 https://web.archive.org/web/20240119041807/https://hpmgroup.co/en/two-steel-projects-inaugurated-n-e/. Archived from the original on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  11. "Ghadir Neyriz Direct Reduction Plant". Archived from the original on 2024-12-06. Retrieved 2024-12-04.
  12. https://web.archive.org/web/20220814132048/https://www.nghsco.com/%D8%AC%D8%B2%D8%A6%DB%8C%D8%A7%D8%AA-%D9%BE%DB%8C%D8%B4%D8%B1%D9%81%D8%AA-%D8%B7%D8%B1%D8%AD%D9%87%D8%A7%DB%8C-%D8%AA%D9%88%D8%B3%D8%B9%D9%87-%D9%81%D9%88%D9%84%D8%A7%D8%AF-%D8%BA%D8%AF%DB%8C/. {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)
  13. (PDF) https://www.almendron.com/tribuna/wp-content/uploads/2024/04/latest-developments-in-steelmaking-capacity-2023.pdf. {{cite web}}: Missing or empty |title= (help)

Resources