Orissa Metaliks Kharagpur Steel Plant
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Orissa Metaliks Kharagpur Steel Plant, also known as OMPL, Orissa Metallurgical Industry Pvt Ltd (OMIPL), is a blast furnace (BF) and direct reduced iron (DRI) steel plant operating in Kharagpur, West Bengal, India.
Location
The map below shows the exact location of the plant in Kharagpur, West Bengal, India:
- Location: Village Gokulpur, P.O. Shyamraipur, P.S. Kharagpur, District West Medinipur, West Bengal, India
- Coordinates (WGS 84): 22.378355, 87.281773 (exact)
Background
The DRI units are part of Unit-I or OMPL-I of the plant and the mini blast furnace is part of Unit-II.[1] The plant comprises of 15 numbers of 20 tonne induction furnaces.[2]
Plant Details
Table 1: General Plant Details
Plant status | Announced date | Start date | Power source |
---|---|---|---|
Operating[3] | 2008[4] | 2017[5] | 83 MW Captive Power Plant[6] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|
Cimmco Vinimay Pvt Ltd [16.6%]; Rashmi Iron Industries Pvt Ltd [9.1%]; Newera Commotrade Pvt Ltd [6.6%]; Rashmi Infrastructure Pvt Ltd [6.0%]; Bholebaba Consultants LLP [5.8%]; Rashmi Cement Ltd [5.7%]; Daffodil Plaza Pvt Ltd [5.7%]; Optimist Commosale Pvt Ltd [5.5%]; Rashidhun Sales Pvt Ltd [5.2%]; Rashmi Metaliks Ltd [5.0%] | E100001012163 [16.6%]; E100001012171 [9.1%]; E100001012169 [6.6%]; E100001012170 [6%]; E100001012164 [5.8%]; E100001012079 [5.7%]; E100001012165 [5.7%]; E100001012168 [5.5%]; E100001012166 [5.2%]; E100000130890 [5%] | Orissa Metaliks Pvt Ltd[3] | 5062177290 | E100001012161 |
Table 3: Process and Products
Steel product category | Steel products | Main production equipment | Detailed production equipment |
---|---|---|---|
semi-finished[7] | DRI; pellet; hot-rolled bars; cold-rolled bars[7][8] | BF, DRI, other[6][9] | 1 BF (320 m3); 9 DRI (6x100 tpd; 1x350 tpd; 1x500 tpd; 1x600 tpd); 15 IF (20 ton each)[10][6][7][9] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Nominal crude steel capacity (total) |
---|---|
operating | 900 TTPA |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
operating | 450 TTPA[9] | 780 TTPA[6][6][6][6][6][6][6][6][6] | 1230 TTPA[9][6][6][6][6][6][6][6][6][6] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Coke | Pellets |
---|---|
60 TTPA[11] | 2200 TTPA[12] |
Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | Total (all routes) |
---|---|
2020 | – |
2021 | 556 TTPA[5] |
2022 | 657 TTPA[5] |
Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | DRI Production | Total (all routes) |
---|---|---|---|
2020 | – | – | – |
2021 | 390 TTPA[13] | 764 TTPA[14] | 1154 TTPA |
2022 | 448 TTPA[9] | 778 TTPA[6] | 1227 TTPA |
Blast Furnace Details
Table 9: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|
unknown | operating[9] | unknown | unknown | unknown | 320 m³[9] | 450[9] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "EC_MBF" (PDF). Orissa Metaliks. 07 July, 2021. Retrieved 11 January 2024.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link) - ↑ "Six Monthly (DECEMBER-2023) Compliance Report for Period April 2023 to September 2023 for Induction Furnace 15 x 20 T (0.9 MTPA)" (PDF). Orissa Metaliks. 2023-12. Retrieved 2024-12-11.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link) - ↑ 3.0 3.1 https://web.archive.org/web/20240320002349/https://orissametaliks.com/rashmi-metallurgical.php.php. Archived from the original on 20 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240115055515/https://orissametaliks.com/data/EC-MBF_OMPL.pdf. Archived from the original (PDF) on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 (PDF) https://orissametaliks.com/data/ENV%20STATEMENT_22-23-OMPL.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 (PDF) https://web.archive.org/web/20240115051344/https://orissametaliks.com/data/qehs02-12-23/Compliance_%20OMPL-I%20-DEC-2023.pdf. Archived from the original (PDF) on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 (PDF) https://orissametaliks.com/data/qehs02-12-23/Compliance_OMPL_DEC-2023.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://orissametaliks.com/qehs.php.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 (PDF) https://orissametaliks.com/data/qehs02-12-23/Compliance_OMPL(MBF)_DEC-2023.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240115070139/http://emis.wbpcb.gov.in/Uploaded_docs/Inspection_upload/U01600000167227060818458.pdf. Archived from the original (PDF) on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://orissametaliks.com/data/qehs02-12-23/Compliance_DEC_2023-Wellman.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://orissametaliks.com/data/qehs02-12-23/Compliance_OMPL-II%20-PELLET-2015_Dec.-%202023.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240115051354/https://orissametaliks.com/data/Env%20Statement%2022-23_OMPL-II.pdf. Archived from the original (PDF) on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240115075512/https://orissametaliks.com/data/ENV_STATEMENT_22-23-OMPL%20-%20I.pdf. Archived from the original (PDF) on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help)