Orissa Metaliks Kharagpur Steel Plant, also known as OMPL, Orissa Metallurgical Industry Pvt Ltd (OMIPL), is a blast furnace (BF) and direct reduced iron (DRI) steel plant operating in Kharagpur, West Bengal, India.

Location

The map below shows the exact location of the plant in Kharagpur, West Bengal, India:

Loading map...
  • Location: Village Gokulpur, P.O. Shyamraipur, P.S. Kharagpur, District West Medinipur, West Bengal, India
  • Coordinates (WGS 84): 22.378355, 87.281773 (exact)

Background

The DRI units and the mini blast furnace are considered part of Unit-I or OMPL-I of the plant.[1]

Plant Details

Table 1: General Plant Details

Plant status Announced date Start date Power source
Operating[2] 2008[3] 2017[4] 83 MW Captive Power Plant[5]

Table 2: Ownership and Parent Company Information

Parent company Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Cimmco Vinimay Pvt Ltd [16.6%]; Rashmi Iron Industries Pvt Ltd [9.1%]; Newera Commotrade Pvt Ltd [6.6%]; Rashmi Infrastructure Pvt Ltd [6.0%]; Bholebaba Consultants LLP [5.8%]; Rashmi Cement Ltd [5.7%]; Daffodil Plaza Pvt Ltd [5.7%]; Optimist Commosale Pvt Ltd [5.5%]; Rashidhun Sales Pvt Ltd [5.2%]; Rashmi Metaliks Ltd [5.0%] E100001012163 [16.6%]; E100001012171 [9.1%]; E100001012169 [6.6%]; E100001012170 [6%]; E100001012164 [5.8%]; E100001012079 [5.7%]; E100001012165 [5.7%]; E100001012168 [5.5%]; E100001012166 [5.2%]; E100000130890 [5%] Orissa Metaliks Pvt Ltd[2] 5062177290 E100001012161

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
semi-finished[6] DRI; pellet; hot-rolled bars; cold-rolled bars[6][7] BF, DRI, other[5][8] 1 BF (320 m3); 9 DRI (6x100 tpd; 1x350 tpd; 1x500 tpd; 1x600 tpd); 15 IF (20 ton each)[9][5][6][8]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Nominal crude steel capacity (total)
operating 900 TTPA

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
operating 450 TTPA[8] 780 TTPA[5][5][5][5][5][5][5][5][5] 1230 TTPA[8][5][5][5][5][5][5][5][5][5]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Coke Pellets
60 TTPA[10] 2200 TTPA[11]

Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year Total (all routes)
2020
2021 556 TTPA[4]
2022 657 TTPA[4]

Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year BF Production DRI Production Total (all routes)
2020
2021 390 TTPA[12] 764 TTPA[13] 1154 TTPA
2022 448 TTPA[8] 778 TTPA[5] 1227 TTPA

Blast Furnace Details

Table 9: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown operating[8] unknown unknown unknown 320 m³[8] 450[8] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "EC_MBF" (PDF). Orissa Metaliks. 07 July, 2021. Retrieved 11 January 2024. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  2. 2.0 2.1 https://web.archive.org/web/20240320002349/https://orissametaliks.com/rashmi-metallurgical.php.php. Archived from the original on 20 March 2024. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20240115055515/https://orissametaliks.com/data/EC-MBF_OMPL.pdf. Archived from the original (PDF) on 15 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 (PDF) https://orissametaliks.com/data/ENV%20STATEMENT_22-23-OMPL.pdf. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 (PDF) https://web.archive.org/web/20240115051344/https://orissametaliks.com/data/qehs02-12-23/Compliance_%20OMPL-I%20-DEC-2023.pdf. Archived from the original (PDF) on 15 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 (PDF) https://orissametaliks.com/data/qehs02-12-23/Compliance_OMPL_DEC-2023.pdf. {{cite web}}: Missing or empty |title= (help)
  7. https://orissametaliks.com/qehs.php. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 (PDF) https://orissametaliks.com/data/qehs02-12-23/Compliance_OMPL(MBF)_DEC-2023.pdf. {{cite web}}: Missing or empty |title= (help)
  9. (PDF) https://web.archive.org/web/20240115070139/http://emis.wbpcb.gov.in/Uploaded_docs/Inspection_upload/U01600000167227060818458.pdf. Archived from the original (PDF) on 15 January 2024. {{cite web}}: Missing or empty |title= (help)
  10. (PDF) https://orissametaliks.com/data/qehs02-12-23/Compliance_DEC_2023-Wellman.pdf. {{cite web}}: Missing or empty |title= (help)
  11. (PDF) https://orissametaliks.com/data/qehs02-12-23/Compliance_OMPL-II%20-PELLET-2015_Dec.-%202023.pdf. {{cite web}}: Missing or empty |title= (help)
  12. (PDF) https://web.archive.org/web/20240115051354/https://orissametaliks.com/data/Env%20Statement%2022-23_OMPL-II.pdf. Archived from the original (PDF) on 15 January 2024. {{cite web}}: Missing or empty |title= (help)
  13. (PDF) https://web.archive.org/web/20240115075512/https://orissametaliks.com/data/ENV_STATEMENT_22-23-OMPL%20-%20I.pdf. Archived from the original (PDF) on 15 January 2024. {{cite web}}: Missing or empty |title= (help)

Resources