Orissa Steel and Power Jhargram Steel Plant, also known as Rashmi Udyog Pvt Ltd, is a steel plant in Jhargram, Garhsalboni, West Bengal, India that operates direct reduced iron (DRI), steelmaking, and electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Jhargram, Garhsalboni, West Bengal, India:

Loading map...
  • Location: Village – Jitusole & Baghmuri, P. O. – Garhsalboni, P. S. – Jhargram, District – Jhargram, State – West Bengal
  • Coordinates (WGS 84): 22.3591, 87.017184 (exact)

Background

M/s Orissa Steel & Power Private Limited (Formerly known as M/s Rashmi Udyog Private Limited) a wholly own subsidiary of M/s Rashmi Cement Limited is originally incorporated under Company Act on 16th October, 2019 with the name of M/s Rashmi Udyog Private Limited and later on company name is change to M/s Orissa Steel & Power Private Limited on 17th November, 2020. The project was originally accorded environmental clearance on 22nd June, 2015. The same EC was subsequently transferred from M/s Rashmi Iron Industries Pvt Limited to M/s Rashmi Udyog Private Limited (a wholly own subsidiary of M/s Rashmi Cement Limited). The name of company was changed to Orissa Steel & Power Pvt. Ltd. The company has proposed to expand its existing pellet plant while also setting up new sponge iron plant and steel melting shop.[1] The executive summary of the proposal to expand the capacities were submitted in September 2021.[2] As of January 2025, there has been no updates in the project.

Plant Details

Table 1: General Plant Details

Announced date Power source Iron ore source Coal source
2015[3] 245 MW Captive Power Plant[3] Birmitrapur, Orissa/ Bilaspur, Chhattisgarh[4] BCCL Dhanbad or imported[4]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Rashmi Cement Ltd 4298177377 E100001012079 Orissa Steel & Power Pvt Ltd[3] 5083805903 E100001012078

Table 3: Process and Products

Steel product category Steel products Main production equipment
crude, semi-finished[3] rod[3] DRI; EAF; Steel other/unspecified

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Other/unspecified steelmaking capacity Nominal crude steel capacity (total)
announced 460[3] 1344[3] 1804[3]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
announced 2000[3] 2000[3]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Pellets
6400[3]

Unit Details

Table 7: Direct Reduced Iron Furnace Details

Unit name Status Announced date Furnace type Current capacity (ttpa) Reductant
unknown DRI (1) announced[3] 2021[3] rotary kiln[3] 400[3] coal[3]
unknown DRI (2) announced[3] 2021[3] rotary kiln[3] 400[3] coal[3]
unknown DRI (3) announced[3] 2021[3] rotary kiln[3] 400[3] coal[3]
unknown DRI (4) announced[3] 2021[3] rotary kiln[3] 400[3] coal[3]
unknown DRI (5) announced[3] 2021[3] rotary kiln[3] 400[3] coal[3]

Table 8: Electric Arc Furnace Details

Unit name Status Announced date Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) announced[3] 2021[3] 460[3] 60.0[3]

Table 9: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI
unknown EAF (1) yes[3] >0[3] >0[3]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. Cite error: Invalid <ref> tag; no text was provided for refs named :0
  2. "Executive Summary" (PDF). West Bengal Pollution Control Board. 2021-09. Retrieved 2024-12-11. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 3.28 3.29 3.30 3.31 3.32 3.33 3.34 3.35 3.36 3.37 3.38 3.39 3.40 3.41 3.42 (PDF) https://web.archive.org/web/20240219025424/https://www.wbpcb.gov.in/files/Tu-05-2021-05-31-18ES_OrissaSteel.pdf. Archived from the original (PDF) on 2024-02-19. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=xQsG+iYm4crW/3g5BGr1DLTBZxoLti7BJ9nLWxWxm8seEjhGwM9C46JXN+5YEWyms9LM3QSefLJHRFAscXLvuQ==&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzXNvGkdT0PfxJ9apij6yL62I6BUeakiRSZ1RDw3zRMLfQ==. {{cite web}}: Missing or empty |title= (help)