Otelu Rosu Steel Plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Otelu Rosu Steel Plant is an electric arc furnace (EAF) idled steel plant in Otelu Rosu, Caras-Severin, Romania.

Location

The map below shows the exact location of the plant in Otelu Rosu, Caras-Severin, Romania:

Loading map...
  • Location: Street Mihai Eminescu No. 10, zip code 325700, Otelu Rosu, Caras-Severin County, Romania
  • Coordinates (WGS 84): 45.512949, 22.339896 (exact)

Plant Details

Table 1: General Plant Details

Plant status Start date Idled date
Mothballed[1][2] 1796[3] 2013[1]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company GEM ID
Sunningwell Steel Polska SA [100.0%] 5076172001 [100%] E100000131078 [100%] Laminorul Danube Metallurgical Enterprise[3] E100000131189

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
semi-finished[4] billets[4] EAF[5] 1 EAF (100-tonnes, Fuchs technology)[5]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
mothballed 850 TTPA[3] 850 TTPA[3]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240312022433/https://www.romania-insider.com/romanian-businessman-relaunch-otelu-rosu-2024. Archived from the original on 12 March 2024. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://web.archive.org/web/20240312022504/https://www.enpg.ro/wp-content/uploads/2024/02/EPG_Report_Decarbonising-RO-primary-steel-production.pdf. Archived from the original (PDF) on 12 March 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://ldme.web-bank.eu/services/otelu-rosu-steel-plant/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20230609154653/https://ldme.web-bank.eu/products/. Archived from the original on 09 June 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20230609144917/https://ldme.web-bank.eu/production/. Archived from the original on 09 June 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Resources