Ozen-Zhetybay-Aktau Oil Pipeline
Part of the Global Oil Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Ozen-Zhetybay-Aktau Oil Pipeline, also known as Uzen-Zhetybay-Aktau Oil Pipeline (Kazakh: Өзен-Жетібай-Ақтау мұнай құбыры; Russian: нефтепровод Узень – Жетыбай - Актау) is an operating oil pipeline in Kazakhstan.[1]
Location
The pipeline runs from an oil pumping station in Ozen via Zhetybay oil pumping station to a pumping station in Aktau, Mangystau region, Kazakshtan.[1]
Project details
Ozen-Zhetybay-Aktau I Oil Pipeline
- Operator: KazTransOil JSC[2][3]
- Owner: KazTransOil JSC[1][3]
- Parent company: Samruk-Kazyna SWF JSC[4]
- Capacity: 9 mtpa (total for the pipeline)[1]
- Length: 141.6 km[5][6]
- Diameter: 530 mm[6]
- Status: Operating[2]
- Start year: 1966[5]
- Cost:
- Financing:
- Associated infrastructure: Uzen-Atyrau-Samara (UAS) Pipeline, Uzen Oil and Gas Field, Zhetybay Oil Field
Ozen-Zhetybay-Aktau II Oil Pipeline
- Operator: KazTransOil JSC[2][3]
- Owner: KazTransOil JSC[1][3]
- Parent company: Samruk-Kazyna SWF JSC[4]
- Capacity: 9 mtpa (total for the pipeline)[1]
- Length: 126.6 km[5][6]
- Diameter: 530 mm, 720 mm[6][7][8]
- Status: Operating[2][3]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: Kalamkas-Karazhanbas-Aktau Oil Pipeline, Uzen-Atyrau-Samara (UAS) Pipeline, Uzen Oil and Gas Field, Zhetybay Oil Field
Ozen-Zhetybay-Aktau III Oil Pipeline
- Operator: KazTransOil JSC[2][3]
- Owner: KazTransOil JSC[1][3]
- Parent company: Samruk-Kazyna SWF JSC[4]
- Capacity: 10.2 mtpa[9]
- Length: 139.2 km[6]
- Diameter: 720 mm[6]
- Status: Operating[3][9]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: Kalamkas-Karazhanbas-Aktau Oil Pipeline, Uzen-Atyrau-Samara (UAS) Pipeline, Uzen Oil and Gas Field, Zhetybay Oil Field
Background
Ozen-Zhetybay-Aktau Oil Pipeline was formerly known as Ozen-Zhetybay-Shevchenko Oil Pipeline.
The Ozen-Zhetybay-Aktau II Oil Pipeline extends from the Ozen oil pumping station to the Zhetybay oil pumping station (63 km), continues to Stationary Observation Point (SPN) "112 km" (49 km) and then connects to the Kalamkas-Karazhanbas-Aktau Oil Pipeline at its 250th kilometer near Aktau (14.6 km).[3][6] The Ozen-Zhetybay-Aktau III Oil Pipeline runs parallel to the Ozen-Zhetybay-Aktau I Oil Pipeline.[6]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Нефтепровод Узень – Жетыбай - Актау". energybase.ru. 2022-03-17. Retrieved 2023-02-02.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 2.3 2.4 "МАҢҒЫСТАУ МҰНАЙ ҚҰБЫРЫ БАСҚАРМАСЫНЫҢ БАСТЫҒЫ АСҚАР ЖОЛДАСОВ ЕҢБЕК ҰЖЫМЫМЕН КЕЗДЕСТІ". kaztransoil.kz. 2022-04-27. Retrieved 2023-02-02.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 "СХЕМА МАГИСТРАЛЬНЫХ ТРУБОПРОВОДОВ АО «КАЗТРАНСОЙЛ»". KazTransOil. 2024. Retrieved March 4, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 4.0 4.1 4.2 "СТРУКТУРА АКЦИОНЕРНОГО КАПИТАЛА". kaztransoil.kz. Retrieved 2023-02-02.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 5.0 5.1 5.2 "СТРАНИЧКИ ИСТОРИИ НЕФТЕПЕРЕВОЗОК В КАЗАХСТАНЕ" (PDF). neft-gas.kz. 2015. Retrieved 2023-02-02.
{{cite web}}
: line feed character in|title=
at position 18 (help)CS1 maint: url-status (link) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 "Государственная лицензия". opi.dfo.kz. July 24, 2017. Retrieved March 7, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "СОСТОЯНИЕ И ПЕРСПЕКТИВЫ РАЗВИТИЯ ТРАНСПОРТА НЕФТИ И ГАЗА КАЗАХСТАНА" (PDF). neft-gas.kz. 2019. Retrieved 2023-02-02.
{{cite web}}
: line feed character in|title=
at position 33 (help)CS1 maint: url-status (link) - ↑ ""ҚазТрансОйл" АҚ ММҚ бос қуаттары бойынша ақпарат". kaztransoil.kz. 2021. Retrieved 2023-02-02.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 9.0 9.1 "Информация о свободных мощностях магистральных трубопроводов АО «КазТрансОйл» за 4 квартал 2023 года". KazTransOil. January 1, 2024. Retrieved March 6, 2024.
{{cite web}}
: CS1 maint: url-status (link)